Actions

Likes
1
Downloads
39
Comments
0

3 Embeds 36

http://ec2-176-34-210-51.eu-west-1.compute.amazonaws.com 32
http://ec2-79-125-29-75.eu-west-1.compute.amazonaws.com 3
http://www.scoop.it 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    15 jours pour concevoir le plan de relesease de votre projet avec les Serious Games 15 jours pour concevoir le plan de relesease de votre projet avec les Serious Games Presentation Transcript

    • 15 jours pour concevoir le Plan de release de votre projet avec les Serious Games Gilles Mergoil Neoxia
    • Mercià nos sponsors Platinum
    • Et mercià nos sponsors Gold et Silver
    • Fiche d’identité• Cabinet de conseil en système d’information• Création : juin 2000• Basé à Paris – 8ème et Casablanca• 50 consultants – Consultants SI – Architectes – Experts• Quelques chiffres : – 4,3 M€ en 2011
    • et l’agilité• Une culture Agile et Lean interne forte• Une pratique concrète chez nos clients depuis plusieurs années sur d’importants projets (ex: Plateforme de prise de paris en ligne du PMU)• Un accompagnement de nos clients sur l’adoption, la généralisation et l’amélioration des pratiques• Une vaste politique de certification SCRUM : « ScrumMaster » et « Product Owner »• Speaker aux évènements nationaux (ex: Agile Tour, XP Days)• Une reconnaissance de nos clients : de la part des praticiens IT et des bénéficiaires métiers• Sponsor du Scrum User Group France• Membre et co-fondateur de l’institut Agile
    • Introduction / Contexte• Projet « stratégiques » ? – Enjeux pour l’entreprise – Implication des décideurs• Objectifs annoncés du Plan de release – Fournir de la visibilité : Quoi ? Quand ? Combien ? – Permettre la prise de décision : Go / NoGo – Délai réduit : 15 jours à 1 mois• 2 contextes possibles : – Projet « neuf » – Projet existant en phase d’«attente »
    • Kesako ?• La conception du Plan de release d’un projet consiste à projeter sur une échelle de temps les fonctionnalités métiers du système cible telles qu’elles seront réalisées.• La répartition des différentes fonctionnalités sur l’échelle de temps décomposées en Releases et en Itérations dépend de plusieurs facteurs combinés : – L’importance de la fonctionnalité dans le système, – Son coût de réalisation, – Sa dépendance à d’autres fonctionnalités.
    • Objectifs poursuivis ?La conception du plan de Release poursuit plusieurs objectifs :1. Disposer d’une vision métier du projet partagée par l’ensemble des acteurs métier, pilotage, équipes de réalisation, d’intégration, de tests, partenaires, …2. Segmenter le projet en sous-ensemble fonctionnels « complets » (domaines fonctionnels / fonctionnalités) de taille adaptée à une estimation de charges réaliste.3. Dégager un consensus sur les estimations de charges nécessaires à la réalisation des grandes fonctionnalités du système en s’adressant aux experts fonctionnels et techniques concernés.4. Dimensionner le dispositif opérationnel projet en fonction des estimations réalisées et des objectifs de release retenus.5. Coordonner les acteurs du projet.6. Suivre l’avancement / le reste à faire du projet.7. Effectuer les arbitrages et mener les re-planifications nécessaires.
    • Démarche générale Métier TechniqueOpen Close Explore
    • 1 - Découverte des fonctionnalitéscas 1 : projet « neuf »• Sous la forme d’un atelier Animateur – 3 ou 4 « experts métier » – 1 ou 2 « décideurs » Expert Manage métier – 1 animateur + 1 rapporteur r Manage r Expert métier Expert métier Expert métier Rapporteur
    • Game #1 – invention des fonctionnalités (1h)• Pendant 20 minutes, chacun écrit autant de fonctionnalités qu’il le souhaite ou le peut : une par Post’it.• A tour de rôle, chacun vient présenter ses fonctionnalités au groupe en les positionnant sur un tableau.• On peut ajouter des fonctionnalités en cours de jeu.• Les managers parlent en dernier !
    • • 50% à 80% d’overlap … Yyzuyi zeiy Yyzuyi zeiy seulement ! Yyzuyi zeiy Yyzuyi Yyzuyi zeiy• « Auto-classement » zeiy Yyzuyi zeiy Yyzuyi zeiy Yyzuyi zeiy• « résonnance » Yyzuyi Yyzuyi zeiy zeiy• « dissonance » Yyzuyi zeiy Yyzuyi zeiy Yyzuyi Yyzuyi• Environ 100 Post’it, soit zeiy zeiy Yyzuyi Yyzuyi zeiy zeiy Yyzuyi entre 30 et 50 zeiy Yyzuyi Yyzuyi zeiy fonctionnalités zeiy Yyzuyi zeiy Yyzuyi zeiy
    • Game #2 – Regroupement (20’)• Regroupement des fonctionnalités par catégories : domaine fonctionnel, sous- domaine, epics, …• Emergence d’un vocabulaire métier du projet• Prolongement « naturel » du jeu #1• Eclaircissement, réécriture, suppression des Post’it devenus inutiles
    • « Regroupement fonctionnel »Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy zeiy zeiy zeiy zeiyYyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy zeiy zeiy zeiy zeiyYyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy zeiy zeiy zeiy zeiyYyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy zeiy zeiy zeiy Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy zeiy Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy
    • Game #3 – Classement horizontal (5’)• « dot voting »• Chacun dispose de 5 votes qu’il positionne à sa guise sur les catégories• On peut voter plusieurs fois sur la même catégorie, voire mettre tous ses votes sur une seule
    • « 1er classement »Yyzuyi Yyzuyi 8 Yyzuyi Yyzuyi 14 Yyzuyi Yyzuyi 3 Yyzuyi 1 Yyzuyi zeiy zeiy zeiy zeiy zeiy zeiy zeiy zeiyYyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy zeiy zeiy zeiy zeiyYyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy zeiy zeiy zeiy zeiyYyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy zeiy zeiy zeiy Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy zeiy Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy
    • Game #3bis – La vue « client » ! (5’)• Est si on votait en se mettant à la place du client ?
    • « vue client »3 Yyzuyi 6 Yyzuyi 8 Yyzuyi 8 Yyzuyi 14 2 Yyzuyi Yyzuyi 3 3 Yyzuyi 1 Yyzuyi zeiy zeiy zeiy zeiy zeiy zeiy zeiy zeiy Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy zeiy zeiy zeiy zeiy Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi 3 Yyzuyi zeiy zeiy zeiy zeiy zeiy zeiy zeiy zeiy Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy zeiy zeiy zeiy Yyzuyi Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy zeiy Yyzuyi Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy zeiy Yyzuyi Yyzuyi Yyzuyi zeiy zeiy zeiy
    • Game #4 – Classement vertical (1/2h)• A l’intérieur de chaque catégorie, l’équipe classe verticalement les fonctionnalités des plus importantes en haut au plus accessoires en bas,• Il est possible de réécrire, de fusionner et de dissocier des fonctionnalités,• Au passage, on peut utiliser le modèle de Kano pour tagguer les fonctionnalités (must have / the more the better / delighter).
    • Fin de la phase 1 « 1er Backlog »• Un périmètre fonctionnel complet avec un niveau de détail de « macro » à « moyen »• Un découpage en domaine et sous-domaine fonctionnel• Un début de « vocabulaire projet »• Plusieurs indicateurs de priorisation global / par domaine / sur différents plans (client, …)
    • Quelques conseils …• La rapporteur de l’atelier peut tracer les résultats des différents jeux ainsi que la « substance des échanges » avec un outil léger tel Scrumdo.com,• Excel (ou Google Spreadsheet) reste encore bien utile pour croiser et trier les données collectées lors de l’atelier (votes, …)• De 1 atelier sur une journée à 3 ateliers d’une demi-journée espacés de quelques jours.• Nous avons aussi essayé : « buy a feature », « be my shadow », ..
    • 1’- Découverte des fonctionnalitéscas 2 : projet « existant »• Analyse de l’existant documentaire en équipe de 2 à 4.• Construction d’un 1er backlog sans intervention du client/des métiers.• Présentation du 1er Backlog dans le cadre d’un « atelier de travail » ... … et utilisation des techniques du « cas 1 ».
    • 2 - Estimation du backlog• Sous la forme d’un atelier Animateur – 3 ou 4 « experts technique » – 1 ou 2 « experts métiers » Expert Expert tech. – 1 animateur + 1 rapporteur métier Expert métier Expert tech. Expert tech. Expert tech. Rapporteur
    • Travail préalable• Toiletter les backlog• Approfondissement des fonctionnalités vers des epics et user stories
    • Préparation de l’estimation (1-2h)• Présentation du périmètre fonctionnel à l’équipe technique : échange et approfondissement.• Présentation du socle technique – Cas 1 : connu et maîtrisé – Cas 2 : mal connu et/ou non maîtrisé• Hypothèses retenues pour les estimations
    • Game #5 « Planning Poker » (1-2h)• Le planning poker ne sert qu’à « étalonner » les stories (ou epics) pour la suite de l’estimation.• Sélection de 4 ou 5 stories représentatives• Décomposition en activités pour l’équipe• Validation des hypothèses d’implémentation qui impacteront l’estimation de la complexité• Utilisation de l’échelle « tailles de tee shirts » : XS, S, M, L, XL
    • Game #6 « La roue »• Estimez et positionner les stories sur la roue Yyzuyi• Utilisez les story étalons pour zeiy Yyzuyi zeiy positionner les nouvelles XS XL stories comparativement Yyzuyi zeiy• Dégagez un consensus entre Yyzuyi zeiy Yyzuyi zeiy Yyzuyi Yyzuyi zeiy Yyzuyi zeiy les participants ou utilisez zeiy Yyzuyi S Yyzuyi L zeiy l’estimation supérieure. zeiy Yyzuyi zeiy Yyzuyi zeiy• Estimez dans l’ordre des M macro-priorités de la phase 1• Entre 30 et 50 stories en une demi-journée
    • Fin de la phase 2 « Backlog estimé »• Finalisation de l’estimation des stories hors atelier et/ou nouvel atelier « la roue » en fonction de la profondeur du backlog.• Backlog estimé de manière macro sur l’ensemble du périmètre et selon des hypothèses d’estimation connues.• Liste des hypothèses fonctionnelles et techniques à valider avant d’entérinner le plan de release.• Liste des epic/stories a retravailler (L et XL)
    • 3 – Construction du Plan de release
    • Plan de release v0 ?• Fixer une échelle de temps et un niveau de ressources (équipe, vélocité)• Faire simple ! – Echelle linéaire dans un premier temps – Business value first !• Communiquez visuellement : afficher le PR 0 !• Faites des hypothèses pour passer des « tailles de tee shirts » aux « story points »
    • Plan de release v0 linéaire Release #1 R. #2 R. #3 #0* #1 #2 #nFonctionnalités
    • Présentation du plan de release• Sous la forme d’un atelier de 2h – 2 ou 3 « managers / décideurs clients » Animateur – 1 « experts métiers » Expert Expert tech. – 1 « experts technique » métier – 1 animateur + 1 rapporteur Expert métier Expert tech. Expert tech. Expert tech. Rapporteur
    • • Discutez des options stratégiques• Arbitrez entre must have / nice to have / delighters• Arbitrez entre court-terme / moyen-terme / long- terme• Les estimations ne sont pas négociables … sans contre-parties !• Adressez les dimensions fonctionnelles / opérationnelles /techniques sur le même plan.
    • Plan de release v1 ?• Valider le consensus : – Choix stratégiques – Plan de ressources – Priorités du projet (fonctionnalités, jalons, qualité)• Itérez !• Proposez aux managers présents d’intégrer le processus plus tôt la prochaine fois.
    • Release #1#0 #1 #2 #n Equipe A Equipe B Equipe intégration #0 + #1 #2 + #n
    • Merci !Questions ?