• Save
Take it Offshore
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share

Take it Offshore

  • 3,812 views
Uploaded on

Presented at LAST Conference 2012, in Melbourne, Australia

Presented at LAST Conference 2012, in Melbourne, Australia

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
No Downloads

Views

Total Views
3,812
On Slideshare
1,901
From Embeds
1,911
Number of Embeds
14

Actions

Shares
Downloads
0
Comments
0
Likes
1

Embeds 1,911

http://franktrindade.com 1,183
http://blog.franktrindade.com 500
http://present.agileindia.org 130
http://lanyrd.com 64
http://abtasty.com 17
http://hasgeek.tv.local 8
http://www.linkedin.com 2
http://prlog.ru 1
http://translate.googleusercontent.com 1
http://www.365dailyjournal.com 1
https://si0.twimg.com 1
http://feeds.feedburner.com 1
http://search.daum.net 1
https://www.linkedin.com 1

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Take it offshore Ramping up a distributed team in 3 weeksHerry WiputraFrancisco Trindade LAST Conference ’12 - Melbourne
  • 2. Herry Wiputra Iteration Manager REA Group @hwiputra Francisco Trindade Consultant ThoughtWorks @frankmtWho are we?
  • 3. What would you do if you have toThe problem
  • 4. What would you do if you have to ramp down a team,create a new, distributed one, and transfer the knowledge across, in 3 months?The problem
  • 5. A little bit of history...
  • 6. Me lbourneA little bit of history...
  • 7. Sydn Me lbourne eyA little bit of history...
  • 8. Xi’an Sydn Me lbourne eyA little bit of history...
  • 9. 3 mths
  • 10. 3 mths6 weeks preparation
  • 11. 3 mths 3 weeks forming6 weeks preparation
  • 12. 3 mths 3 weeks forming6 weeks preparation 2 weeks performing
  • 13. preparation
  • 14. Sydn eypreparation
  • 15. Me lbournepreparation
  • 16. preparation
  • 17. Plan Act Do Checkpreparation
  • 18. Xi’anforming
  • 19. forming
  • 20. forming
  • 21. forming
  • 22. forming
  • 23. forming
  • 24. forming
  • 25. forming
  • 26. forming
  • 27. forming
  • 28. forming
  • 29. forming
  • 30. 2 hsforming
  • 31. interference levelforming
  • 32. 2 weeks 6 weeksperforming
  • 33. performing
  • 34. Did it work?
  • 35. Thank you
  • 36. Take it offshore Ramping up a distributed team in 3 weeksHerry WiputraFrancisco Trindade LAST Conference ’12 - Melbourne