2. TAREC-IN AS resting on 45 years in telecom business
Planning and Roll-Out/In Experience last 30 years
Network Development, Optimization & Utilization
Asset Management of Technology shifts/swaps
ARS Execution support by Preferred Partner
Independent and Reliable Engineering Services
Assist & Consultancy in any part of MNO value chain
Visit website or LinkedIn company pages for info
Experience & Capabilities
post@tarec-in.com ML#12, 5534 Haugesund, Norway
4. Providing support to MNO’s life cycle management
Network infrastructure assets design, engineering,
planning, commissioning, roll-out and operation
Infrastructure modifying, upgrade, technology shifts
Replacements, decommissioning & disposal of idle,
obsolete, swapped excess equipment
RFI/Q planning, preparation, execution, evaluation
Eco-friendly and sustainable operation E2E
Technology Asset Management
post@tarec-in.com ML#12, 5534 Haugesund, Norway
5. Maximizing profit in Infrastructure Techology shifts
Optimize Vendor/Brand swap processes
Minimize capex for current last Roll-Out period
Utilize available sourcing of 2nd user products
Syncronize Roll-Out/In RFQ processes
Minimize Reverse Logistics expenditure
Introduce TTO «Touch&Transport Once» principle
Network upgrade initiatives, NGN
post@tarec-in.com ML#12, 5534 Haugesund, Norway
6. Marketing inputs, forecasting, scenarios
Payload/signal traffic capacity/performance analyses
Logical/physical network architecture & design
Reliability & redundancy consepts
Site and footprint design, Clean Power supply
Numbering, Routing, Signalling, POI
Quality enhancements, innovative New Services
Managing Technology & Network development
Planning & Implementation
post@tarec-in.com ML#12, 5534 Haugesund, Norway
7. Scope:
Review the process of receiving demands, forecast
and performance data from different business Units
Assessment of the comprehensiveness, effectiveness,
regularity and quality of available input
Verification of the current planning process, searching
for enhancements for a new Strategic Business Plan
Budget aligned plan for continous Optimized
Expansions to capture potential market volume
Network Planning inputs1
post@tarec-in.com ML#12, 5534 Haugesund, Norway
8. Approach:
Verifying reported Network QoS KPIs, versus planned
Network capacity Roll-Out and redesign
Evaluate ex-/internal data granularity, regularity, quality
Evaluating collection&analyses process of data for market
potentials of subscribers, services, products, churn
Capture new Mega-Trend services to boost revenue
Consider partnerships for innovative new products
Verify network ability to cater for increase in peaked traffic
Considering financials, revenue, opex/capex constraints
Network Planning inputs2
post@tarec-in.com ML#12, 5534 Haugesund, Norway
9. Availability&Reliability, failure-ratio, interrupts, dropcall
Optimized utilization of all assets, infra/NEs
Timing of Technology shifts, swaps, downscaling obsolete
Channels for obtaining market/customer demand/need
Value Based Segmentation, keeping top 20% of sub base
Protecting topline/revenue from adjacent players
(VoIP/Skype/Messenger) and canibalism of own services
Environment requirements, energy-consum/CO2/pollution
Regulatory policy, spectrum, site-/infra-sharing
Network Planning inputs3
post@tarec-in.com ML#12, 5534 Haugesund, Norway
10. Required Inputs:
Network statistics, traffic & QoS
Marketing statistics & forecasts
Global generic trends and innovation
Financial frames, long&short term
Coverage per service 2/3/4G, in-/outdoor, rural/urban
Regulator, Competetion & Business Strategies
Targeted Output:
Network Strategy Plan for Access&Core infrastructure
Network Strategy Plan
post@tarec-in.com ML#12, 5534 Haugesund, Norway
11. Includes:
Assets Survey & Roll-In requirements in RFQ process
Decommissioning process, handl-/pack-ing/transport
Roll-In & Reverse Logistics process improvements
Guidelines for execution of Asset Recovery project
Avoid MNO’s exposure of sensitive data and brand
Process to secure assets max revenue, minimize opex
Execution according to Environmental Regulations
Project management, utilizing Process Descriptions
Asset Recovery Services
post@tarec-in.com ML#12, 5534 Haugesund, Norway
12. Scope:
Project Mandate & Budget approved
Availability of signed SoW doc, Specified SoR
Qualified Personnel, Tools, Packing materials
Transporting, Storage, Export Licenses
Site facility; Doors, Stairs, Lifts, Access, NEs O&M
Inventory Database; Check versus on-site, Volumes
Labelling of equipment for Scrap/Recycling
Reverse Logistic Process1
post@tarec-in.com ML#12, 5534 Haugesund, Norway
13. Approach:
Verify required SoW, personnel & utilities present
Ensure all prepartions and precautions at site
Verify shut down procedures and erasing sensitive data
Register all equipment on-site and outbound transport
Safe ESD handling/packing of resalable equipment
Packaging methods - certified 4 hz-waste, unfumigated
Transport preparations, Loading Plan, Tax & Licenses
Process performed by RL experienced Preferred Partner
Reverse Logistic Process2
post@tarec-in.com ML#12, 5534 Haugesund, Norway
14. Technology Asset Management for MNO’s
Building up
Tearing down
With equal efficiency and professionalism
Providing peace of mind whilst shaping the future
Maintaining favorable reputation in the public eye
TAREC-IN Full Life Cycle support
post@tarec-in.com ML#12, 5534 Haugesund, Norway