Contribution of PT PLN Geothermal in supporting energy development in indonesia
Upcoming SlideShare
Loading in...5
×
 

Contribution of PT PLN Geothermal in supporting energy development in indonesia

on

  • 858 views

Contribution of PT PLN Geothermal in supporting energy development in indonesia

Contribution of PT PLN Geothermal in supporting energy development in indonesia

Statistics

Views

Total Views
858
Views on SlideShare
856
Embed Views
2

Actions

Likes
0
Downloads
7
Comments
0

2 Embeds 2

http://www.linkedin.com 1
https://twitter.com 1

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Contribution of PT PLN Geothermal in supporting energy development in indonesia Contribution of PT PLN Geothermal in supporting energy development in indonesia Presentation Transcript

  • by PT. PLN Geothermal forEnergy Business Forum of the 38th Meeting  of the APEC Working Group (Bali, November 17, 2009) 1
  • About PT. PLN Geothermal (PLN‐G)PLN‐G is a subsidiary company of PT. PLN (Persero), a state‐owned power company in Indonesia.PLN‐G was legally established on April 6, 2008 for aiming at supporting the power development business in Indonesia through the program of geothermal energy development . 2
  • The Geothermal Power Business in Indonesia 1. Indonesia presents a unique geothermal power value chain 2. Incumbents operate at various points in this value chain 3. Terminology: a. Brownfield: A field that has had its geothermal resources tested sufficiently for  development to proceed b. Greenfield: Any field that has not yet been tested. c. Legacy WKP: WKP belonging to PGE and PLN governed by Keppres  45/1991.  Includes elements 4 through 9 of value chain. d. New WKP: WKP offered under Law 27/2003. Includes elements 1 through 9 of  value chain Geothermal Power Value Chain1.  2.  3.  4.  5.  6.  7.  8.  9. Opportunity  Preliminary  WKP     Exploration Feasibility  Field Develop‐ Power Plant  Power       Field O&MIdentifica‐ Resource  Proposal  Study& PPA  ment Construction Station O&Mtion Assessment Preparation Negotiation Greenfield Brownfield PLN‐G (near‐term) PLN‐G (long‐term) 3
  • Opportunities for PLN‐GNear term (Captive) Long term (Competitive) 493 MW  total (1) 760 MW  total  (1,5,6) 430 MW  total (1,5) ~1,800 MW total  40.5 MW  (1,5,6,8) total  (1,5,6,8) 4
  • Fit & Schedule: Business Line Staging 493 MW 40.5 MW 430 MW 760 MW Up to 1,800 MW * If regulatory environment improves2009 2010 2011 2012 2013 2014 2015 2016 5
  • Opportunities for Partnership (Near‐term) 6
  • Opportunities for Partnership (Long‐term) 7
  • Key Notes 8