• Save
FPC Greensboro, Town Hall Meeting Presentation, Oct. 3, 2010
Upcoming SlideShare
Loading in...5
×
 

FPC Greensboro, Town Hall Meeting Presentation, Oct. 3, 2010

on

  • 419 views

First Presbyterian Church of Greensboro.

First Presbyterian Church of Greensboro.
For Master Planning Process 2010.
www.fpcgreensboro.info.

Statistics

Views

Total Views
419
Views on SlideShare
400
Embed Views
19

Actions

Likes
0
Downloads
0
Comments
0

1 Embed 19

http://www.fpcgreensboro.info 19

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

FPC Greensboro, Town Hall Meeting Presentation, Oct. 3, 2010 FPC Greensboro, Town Hall Meeting Presentation, Oct. 3, 2010 Presentation Transcript

  •  
  • bartzen + ball architecture design and planning
  • bartzen + ball architecture design and planning FIRST PRESBYTERIAN CHURCH OF GREENSBORO, FACILITY MASTER PLAN
  •  
  • 3D Massing Study Model Concept Development Expanded Drop Off Areas New ‘Front Door’ Entry
  • 3D Massing Study Model Concept Development Expanded Drop Off Areas New ‘Front Door’ Entry
  • 3D Massing Study Model Concept Development Expanded Drop Off Areas New ‘Front Door’ Entry
  • 3D Massing Study Model Concept Development Expanded Drop Off Areas New ‘Front Door’ Entry
  • 3D Massing Study Model Concept Development Expanded Drop Off Areas New ‘Front Door’ Entry
  • Aerial View
  • Programming Analysis 3D Programming Model Existing Program 128,387SF Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Proposed Program 135,890SF Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Existing Internal Circulation Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Proposed Internal Circulation Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Existing Shared Spaces Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Proposed Shared Spaces Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Church Staff- Existing Existing 6,288 sf Proposed 5,883 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Church Staff- Proposed Existing 6,288 sf Proposed 5,883 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Pastoral Care - Existing Existing 8,608 sf Proposed 9,011 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Pastoral Care - Proposed Existing 8,608 sf Proposed 9,011 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Music - Existing Existing 6,448 sf Proposed 6,114 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Music - Proposed Existing 6,448 sf Proposed 6,114 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Christian Education - Existing Existing 46,781 sf Proposed 42,285 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Christian Education - Proposed Existing 46,781 sf Proposed 42,285 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Weekday Preschool - Existing Existing 28,154 sf Proposed 24,480 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Weekday Preschool - Proposed Existing 28,154 sf Proposed 24,480 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model First School - Existing Existing 12,035 sf Proposed 16,865 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model First School - Proposed Existing 12,035 sf Proposed 16,865 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Outreach - Existing Existing 20,073 sf Proposed 31,252 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis 3D Programming Model Outreach - Proposed Existing 20,073 sf Proposed 31,252 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Concept Development 3D Massing Study Model – Existing Massing Mullin Life Center Sanctuary Corl Building Memorial Building Shetler Building Parking Garage Smith Building
  • 3D Massing Study Model Concept Development Removal of Corl Building
  • 3D Massing Study Model Concept Development New Parking Area
  • 3D Massing Study Model Concept Development New Green Roof – Playground
  • 3D Massing Study Model Concept Development Proposed Future Development
  • 3D Massing Study Model Concept Development New ‘Front Door’/’Community Space’ Redeveloped Green Street
  • Aerial View
  • Aerial View
  • Programming Analysis Church Staff – Middle Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Church Staff – Upper Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Pastoral Care – Lower Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Pastoral Care – Middle Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Pastoral Care – Upper Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Music – Middle Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Music – Upper Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Music – Upper Roof Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Christian Education – Basement Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Christian Education – Lower Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Christian Education – Middle Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Christian Education – Upper Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Christian Education – Upper Roof Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Weekday Preschool – Lower Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Weekday Preschool – Middle Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Weekday Preschool – Upper Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis First School – Lower Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis First School – Middle Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis First School – Upper Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Circulation Shared Spaces Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach Outreach – Basement Level Existing None Proposed
  • Programming Analysis Outreach – Lower Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Outreach – Middle Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Outreach – Upper Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • Programming Analysis Outreach – Upper Roof Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  • bartzen + ball architecture design and planning
  •  
  • Aerial View
    • MP Team: Bartzen + Ball Architects w/ Sutton-Kennerly Engineers
    • 2008-9 Strategic Planning & Implementation Process: Ongoing
    • Master Planning Process: 6 months (June – December 2010)
    • Preliminary Review by Session: September 20th
    • Presentation to Congregation: October 3rd
    • Capital Campaign Process: January 2011
    Introduction
    • 1993 Moser Mayer Master Plan
    • Construction of the Mullin Life Center
    • Purchase of the Shetler Building
    • Purchase of the Greene Street Properties
    • 2008-2009 Strategic Planning Process
    • 2010 Master Planning Process Update
    Background
    • I. Data Collection/Digital Archive/
    • Code Verification/Visioning June 2010
    • Programming/3D Model/Building Assessments July
    • Preliminary Concept Planning/Draft Program August
    • Master Plan Alternatives September
    • Preferred Master Plan October
    • VI. Final Master Plan November 2010
    Process
    • Data Collection/Digital Archive/Code Verification/Visioning July
      • Existing plan updates and organization
      • Existing Facilities Tour and Initial Interviews
      • Project Web Site Construction
    • Programming/3D Model/Building Assessments August
      • Preliminary 3D model of existing facilities
      • Building System Assessments
      • Preliminary Programming Interviews
      • Creation of DWF plan diagrams
    • Preliminary Concept Planning/Draft Program September
      • Preliminary Concepts
      • Draft Programming: Analysis and Test Fits
      • 3D model massing and use studies
    • Master Plan Alternatives October
      • Master Plan Alternatives
      • Congregational Meeting and Feedback
      • Draft Program Document
      • Priority Matrix
    • Preferred Master Plan November
      • Final Test Fits
      • Architectural Massing and Image
      • Preliminary Cost Model
      • Real Estate Initiatives
    • Final Master Plan December
      • Final Program Document
      • Final MP Recommendations
      • Final Cost Model
      • Coordination with Capital Campaign
    Initiative & Update
    • Re-Connect/Clarify/Consolidate Church Programs/Ministries
      • Accessibility for Old and Young
      • Access to Church Staff
      • Consolidation of underused or duplicated space
    • Create a new Entry/Atrium Space off Greene Street
      • New Public Front Door
      • Drop off and Pick Up
      • Gathering and Orientation space
      • Convenient Parking on Sundays
    • Consolidate Outreach into a new Community Center/’Host Village’
      • Bring together FPC and associated non-profits in one location
      • Connect to FPC youth and pastoral care programs
      • Prioritize ‘Who What Where and Why’
    • Address Deferred Maintenance Issues
      • Explore new Energy Efficient HVAC systems/Central Plant
      • Address building envelope issues in Sutton Kennerly Report
      • Upgrade Sanctuary, Smith, Memorial, Shetler for new smart technologies
    • Support growth of Christian Ed and Preschool Programs
      • Address needs of First School and Weekday Preschool Programs
      • Address needs of Christian Ed, Sunday School and Youth Programs
      • Improve connections with Sanctuary and Life Center etc.
    Goals
    • Address new trends in Worship such as Rejoice/Music and to become an ‘asset to the community’
      • Provide new acoustically appropriate, worship space for 400-500 people
      • Connect this space to CE, Life Center, Sanctuary and Front Door
      • Upgrade Sanctuary for new technologies/lighting
    • Embrace Greene Street
      • More Pedestrian/Less Vehicular
      • Drop off and Parking for Church and Schools
      • Handicap Accessibility to Sanctuary and Church Facilities
      • New Streetscape Improvements: Trees, Signage, Traffic controls
      • Connect into Greensboro Greenway System and Fisher Park
    • Address Costs, Capital Campaign and Congregation
      • Test Assumptions
      • Prioritize Projects and Phasing
      • Establish a Realistic Target for Capital Campaign
    Goals (cont.)
    • Renovation of Smith and Memorial Buildings
      • Phasing and current uses
      • Redhead Hall roof addition
      • HVAC issues
    • Removal of Corl Building in future…
      • What happens to Christian Ed/Preschools?
      • Connections to the rest of the campus will need to be rerouted
      • Construction in the middle of the campus will require careful planning and swing space on a temporary basis
    • Removal of houses across Greene Street
      • What happens to Interfaith Hospitality and Faith Action?
      • Fisher Park Neighborhood Association Concerns
      • Parking Lot/Garage/School Construction?
      • Greensboro City Planning Approval Process
    • Shetler Transformation
      • Must be accommodated over time due to renovation and new construction
      • How to pay for this?( i.e. Existing and future Non-Profits as paying tenants in cooperative arrangement?)
      • Exterior and interior renovations must be better understood before any moves can be made
    • Capital Campaign
      • Mullin Life Center
      • Bold and Ambitious Agenda
      • Priorities and Phasing Questions
      • Calendar and Rollout
    Key Issues To Address
  • 3D Massing Study Model Concept Development New ‘Front Door’/’Community Space’
  • 3D Massing Study Model Concept Development New ‘Front Door’/’Community Space’ Redeveloped Green Street
  • 3D Massing Study Model Concept Development New First School Facility (Optional Expanded Facility)