2009 Sdge It Virtualization Presentation

828 views
748 views

Published on

Presentation that desribes the incentives provided by SDG&E to promote energy efficiency.

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
828
On SlideShare
0
From Embeds
0
Number of Embeds
8
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • 2009 Sdge It Virtualization Presentation

    1. 2. <ul><li>2009 SDG&E Energy Efficiency Program Incentives </li></ul><ul><li>What qualifies for SDG&E Energy Efficiency Program Incentives? </li></ul><ul><ul><li>SDG&E provides Energy Efficiency Program incentives for quantifiable and calculated energy reductions. Energy reductions are measured in reduced kilowatt hours (kWh) per year. </li></ul></ul><ul><ul><li>What elements of a Virtualization Project would result in energy reduction and qualify for Energy Efficiency Incentives? </li></ul></ul><ul><ul><li>Consolidation and physical removal of existing equipment, being replaced with less or more energy efficient equipment, by no later than December 31, 2009. </li></ul></ul><ul><ul><li>Examples: Reduced quantity of, Servers, Storage Area Network (SAN), Disk drives, Tape drives, desktop personal computer consolidation to thin clients etc. </li></ul></ul>
    2. 3. 2009 SDG&E Energy Efficiency Programs SDG&E Electric Service Territory Who Qualifies for SDG&E energy Efficiency Incentives? Businesses with an SDG&E electric or gas account
    3. 4. <ul><ul><li>2009 SDG&E Energy Efficiency Program Incentives </li></ul></ul><ul><ul><li>What are the applicable SDG&E Energy Efficiency Programs and their Incentive Rates? </li></ul></ul><ul><ul><li>Incentives formulas may vary by Energy Efficiency Program are paid on a cents per kilowatt per hour (kWh) basis. </li></ul></ul><ul><li>Standard Performance Contract (SPC) </li></ul><ul><ul><li>Energy-efficiency measures with documented savings pays 9 Cents per kWh/yr energy savings. ( Visit www.sdge.com/spc for program details) </li></ul></ul><ul><li>Energy Efficiency Savings Bid Program (EE Bid) </li></ul><ul><ul><li>Offers customers and project sponsors the opportunity to receive larger incentives for projects that produce energy savings of at least 500,000 kWh . Pays 8-10 cent per kWh/yr in documented energy savings. (Visit www.sdge.com/bid for program details) </li></ul></ul>
    4. 5. Standard Performance Contract (SPC) – Eligibility <ul><li>Who? </li></ul><ul><li>Businesses with an SDG&E electric or gas account </li></ul><ul><li>What? </li></ul><ul><li>Retrofit projects that deliver kWh or therms savings </li></ul><ul><li>How Incentives are paid </li></ul><ul><ul><li>Calculated – on pre-determined energy savings </li></ul></ul><ul><ul><li>Measured – on actual measured energy savings </li></ul></ul><ul><li>Measures must exceed federal and state standards </li></ul>
    5. 6. Virtualization Project Incentives – Getting Started <ul><li>What supporting documentation will SDG&E require </li></ul><ul><li>and at what point should I apply for Program Incentives? </li></ul><ul><li>Existing audit inventory of potential Servers to be removed from facility </li></ul><ul><li>Existing Make </li></ul><ul><li>Existing Model </li></ul><ul><li>Existing Power Consumption </li></ul><ul><li>Proposed Quantity of Virtualized Servers </li></ul><ul><li>New Make </li></ul><ul><li>New Model </li></ul><ul><li>New server power consumption </li></ul><ul><li>Contact SDG&E, submit completed Program Application documents with supporting documentation requesting “Pre-inspection” prior to equipment order or start of project.. </li></ul>
    6. 7. Standard Performance Contract – Incentives <ul><li>Incentives on calculated or measured savings pay as follows: </li></ul><ul><ul><li>Lighting - $0.05/kWh </li></ul></ul><ul><ul><li>Air conditioning and refrigeration - $0.15/kWh </li></ul></ul><ul><ul><li>Motors and other equipment (Server Virtualization etc). - $0.09/kWh </li></ul></ul><ul><ul><li>Gas equipment - $1.00/therm </li></ul></ul><ul><ul><li>$100/kW for qualifying retrofit projects. </li></ul></ul>
    7. 8. Standard Performance Contract – Process <ul><li>How to Apply </li></ul><ul><li>Complete and submit a SPC application </li></ul><ul><ul><li>Downloaded from: </li></ul></ul><ul><ul><li>www.sdge.com/business/bus_energy_efficiency.shtml , or </li></ul></ul><ul><ul><li>Request a CD-ROM </li></ul></ul><ul><li>SDG&E must inspect the site prior to the start of the project </li></ul><ul><li>Incentive Limits </li></ul><ul><li>Incentives may not exceed 50% of the measure cost. </li></ul><ul><li>Incentive caps: </li></ul><ul><ul><li>Customer Site - $350,000 </li></ul></ul>
    8. 9. Energy Savings Bid - Who’s Eligible? <ul><li>Businesses with an SDG&E electric or gas account </li></ul><ul><li>Project(s) must save a minimum of 500,000 kilowatt-hours (kWh) annually or 25,000 therms annually </li></ul><ul><ul><li>all measures must be retrofits or replacements of existing, operating equipment </li></ul></ul><ul><ul><li>pre-inspections are required before work begins </li></ul></ul><ul><li>Aggregation of measures and/or project sites is acceptable </li></ul>
    9. 10. Energy Savings Bid - Incentives <ul><li>Provides higher incentive rates than the California statewide Incentive/Rebate Programs   </li></ul><ul><li>Incentives may qualify for 100% of measure costs </li></ul><ul><li>There are no limitations on the maximum incentive amount paid to individual customers or project sponsors    </li></ul><ul><li>All savings and incentives are based on measured, actual savings as approved by SDG&E </li></ul>
    10. 11. Energy Savings Bid – How to Apply <ul><li>Participation is easy and user-friendly. There are only two application forms and two simplified spreadsheets --- available at www.sdge.com/business/bid.shtml </li></ul><ul><li>Measurement & Verification (M&V) is required. M&V can be performed by: </li></ul><ul><ul><li>SDG&E’s independent third-party contractor, or </li></ul></ul><ul><ul><li>customer/project sponsor </li></ul></ul><ul><li>We can help with the paperwork  </li></ul>
    11. 12. SDG&E Rebate Programs Express Efficiency Small Business Super Saver kWh Requirements 100 kW and above Below 100 kW Therm Requirements 4,166 therms and above Below 4,166 therms Applications Measures must be purchased and installed between 1/1/09 and 12/31/09 unless otherwise stated Measures must be purchased and installed between 1/1/09 and 12/31/09 unless otherwise stated Rebate Limit $350,000 per account, per fuel, per year None Examples Generally: Larger casual dining restaurants, institutional facilities Generally: Quick serve and smaller casual dining restaurants
    12. 13. SDG&E Express Rebate Programs <ul><li>Network Power Management Software Rebate </li></ul><ul><li>Software must be installed that automatically controls the power settings of networked “Desk Top” personal computers (PC) at the server level. </li></ul><ul><li>The software must be capable of managing power consumption for each individual PC. </li></ul><ul><li>In addition, the software must be capable of reporting energy saving results. When submitting a rebate application, customers must provide: </li></ul><ul><ul><li>Copy of the software license agreement, </li></ul></ul><ul><ul><li>A report directly from the Network Energy Management software that verifies the number of PCs that are being controlled by the system. </li></ul></ul><ul><ul><li>A list of license numbers serving the system. </li></ul></ul><ul><ul><li>Computer laptops are not eligible . </li></ul></ul><ul><ul><li>Rebate $15.00/controlled PC </li></ul></ul><ul><li>  </li></ul>
    13. 14. Commercial Services <ul><li>On-Bill Financing (OBF) </li></ul><ul><li>OBF offers zero percent financing on specific energy efficiency measures. </li></ul><ul><ul><ul><li>Works in conjunction with select SDG&E rebate and incentive programs (such as SBSS) </li></ul></ul></ul><ul><ul><ul><li>The monthly payments are billed to your SDG&E energy bill </li></ul></ul></ul><ul><li>Loan amount is a minimum of $5,000, up to a maximum loan amount of $100,000 </li></ul><ul><ul><ul><li>Loans are per meter, per customer </li></ul></ul></ul><ul><li>For more information: </li></ul><ul><li>www.sdge.com/OBF </li></ul><ul><li>800.644.6133 </li></ul><ul><li>[email_address] </li></ul>
    14. 15. On Bill Financing Criteria <ul><li>SDG&E’s 0% financing option is available for qualified customers who have: </li></ul><ul><li>A qualified rate: commercial, industrial, agricultural </li></ul><ul><li>Qualified for SBSS, Express, TEC, Bid, SPC </li></ul><ul><li>A project cost of $5,000 - $100,000 or $250,000 for taxpayer funded customers </li></ul><ul><li>Good credit standing with SDG&E </li></ul><ul><ul><li>Active account for at least two years </li></ul></ul><ul><ul><li>No disconnect notices in the last twelve months and no deposit on SDG&E account </li></ul></ul><ul><li>5 year or less payback on total project or 10 years for taxpayer- funded customers </li></ul>   
    15. 16. On Bill Financing – Step by Step STEP 1: Reserve program funds by calling the EIC (rebate programs only) Request OBF application or download from www.sdge.com /0BF Fax: 1-866-476-0357 STEP 2: SDG&E pre-inspects site and determines project savings/payback OBF contacts contractor/customer on project financing approval STEP 3: Customer signs SDG&E loan agreement Contractor performs installation and submits final invoice and rebate/incentive paperwork STEP 4: SDG&E performs post inspection Rebate/incentive and project checks issued to customer or contractor STEP 5: Loan installment amount appears on customer scheduled bill CONTACT INFORMATION: EIC- 800-644-6133 E-MAIL : [email_address]
    16. 17. Commercial & Industrial Services <ul><li>SDG&E Account Executives </li></ul><ul><li>SDG&E Anti-Trust Rules & Regulations require SDG&E Employees to be neutral in regards to contractors, vendors and equipment manufacturers. </li></ul><ul><li>SDG&E Account Executives role is to catalyze proactive energy efficiency decisions though concepts meetings and assist in energy efficiency incentive or rebate application </li></ul><ul><li>Energy Efficiency equipment, contractor selection, and ultimate energy efficiency strategies are the decision of the end use customer. </li></ul>
    17. 18. Contact Us Contact RGM Consulting Rod Matthews 858-518-9964 [email_address]

    ×