3. Head of the Republic of Buryatia– Prime Minister of the Republic of Buryatia
Vyacheslav V. Nagovitcin
The Republic of Buryatia now is a region of dynamic development of industrial potential and favorable investment climate that makes
it one of the most attractive regions of Russia.
In order to achieve the strategic goal of development of our Republic - that is improvement of living standards and quality of life
of the population - we aim at creation of competitive economy, development and modernization of production, transport and social
infrastructure, forming of large industrial infrastructure complexes. We create the Baikal Haven Tourism & Recreation Zone as well as
regional zones of economicfavor.
Buryatia has all conditions for development of investment cooperation. These are its advantageous transport and geographic position
in relation to domestic and foreign markets, rich and highly explored mineral resources base, vast tourism and recreation resources,
strategic reserve of pure drinking water, and high scientific, labor and cultural potential.
The Republic of Buryatia is open for implementation of new significant economic and social projects. We are constantly working
at arrangement of the most favorable, beneficial and comfortable conditions for business development and attraction of potential
investors. I would like to invite you to take a closer look at our Republic. I wish you rewarding work, effective mutually beneficial
cooperation with the Republic of Buryatia and success to your business!
The Deputy Chair of the Government of the Republic of Buryatia for economic development,
the Investments Officer of the Republic of Buryatia
Alexander E. Chepik
Nowadays the Republic of Buryatia is one of the most fast-growing regions of Russia. All the measures of government support to
market players have become a kind of accelerator for omnidirectional development of the Republic.
The Board of Investment Activity is affiliated with the Head of the Republic Buryatia, the institution of the Investment Officer of the
Republic of Buryatia was introduced, and the Fund for regional development of the Republic of Buryatia was established. The Republic
of Buryatia supports investors intending to put up money for its capital investment projects. The Government of the Republic of Buryatia
constantly works at arrangement of the most favorable, beneficial and comfortable conditions for business development.
All that facilitates reduction of the way of an investor to solving of specific problems depending on thestate authorities.
Minister of Economy of the Republic of Buryatia
Tatiana G. Dumnova
For the Government of Buryatia support of investors is one of the priority areas of development of social and economicpotential
of the region. Legal, infrastructural and informational framework for attraction of investors, as well as the administrative and financial
tools of investment support were created in the Republic.
In particular, the laws focused on investment support were passed. Thus, the Law of the Republic of Buryatia «On the government
support for investment activity in the Republic of Buryatia» provides seven forms of the government support including financial and
property government support for organizations entered into the investment agreement implementing investment projects.
3
4. RUSSIA
Republic of Buryatia
Mongolia
China
Germany
Spain Turkey
Kazakhstan
Lake Baikal
Ulan-Ude
5. CONTENTS:
BURYATIA - TERRITORY INVESTMENT
6
TRANSPORT AND LOGISTICS SECTOR
MINERAL RESOURCES SECTOR
8
24
AGRO-INDUSTRIAL SECTOR
48
INDUSTRY AND RESIDENTIAL CONSTRUCTION
70
TOURISM AND RECREATION SECTOR
92
REGIONAL DEVELOPMENT FUND
126
6. BURYATIA -
TERRITORY INVESTMENT
• Guaranteed support of the Government of
the Republic of Buryatia
• Up-to-date legislative framework
• Investment projects support based on “one-stop-
shop” principle
• Effective development institutions
• Full set of financial instruments
Favorable investment policy:
7. GENERAL INFORMATION ABOUT THE REPUBLIC OF BURYATIA:
• Area - 351 300 km2
• Population - 971.8 thousand people
• Administrative center - the city of Ulan-Ude
1,100 MW
Gusinoozyorskaya TPP
(Termal Power Plant)
7
Р258
Р258
А340
А164
Р436
Р437
Р438
148 МW
CHPP-1 (Central Heating
and Power Plant)
М55
А165
The distance from Ulan-Ude:
• Moscow - 5631 km
• Beijing - 2013 km
• Ulan - Bator - 584 km
• Seoul - 2200 km
• Tokyo - 3115 km
The Baikal-Amur Railway
20% of the world’s fresh
water reserve
Lake Baikal
Logistics:
• Р-258 Moscow-Vladivostok
• А-340 Ulan-Ude - Kjahta -
Ulaanbaatar
• The Trans-Siberian Railway
• The Baikal-Amur Railway
• International Airport «Baikal» in
Ulan-Ude
railroad
federal
highways
Ulan-Ude
TYVA
IRKUTSK
REGION
Zabaikalsky Krai
MONGOLIA
8. INVESTMENTS PROPOSALS
OF THE REPUBLIC OF BURYATIA
Transport and logistics sector
Ulan-Ude
Ulaanbaatar
Peking
Moscow
9. Euro-Asian transport corridors
10
The auto-tourism cluster “Kyakhta”
12
The production and logistic center in Gusinoozersk town
14
Setting-up of an international trans-asian logistic company in Gusonoozyorsk
16
logistics center, station «sulfate»
18
The auto-tourism cluster “Baykalskiy”
20
Logistic center in Ulan-Ude
22
10. Moscow
Ulan-Ude
Ulaanbaatar
Peking Tokyo
Novosibirsk
Rotterdam
Dalian
Title Distance
Peking - Ulaanbaatar -
Ulan-Ude - Moscow 9 500 km 12 days
The Trans-Siberian
Railway 11 000 km 14 days
Northern Sea Route 13 500 km 35 days
South Sea Route 20 700 km 49 days
EURO-ASIAN TRANSPORT CORRIDORS
Usage of the international
transport corridor for cargo
carriage through Buryatia along
the route «Ulan-Ude - Kyakhta
- Ulan Bator - Beijing» allows to
reduce time of delivery up to 23
days.
10
11. 100
89,2 92
83,5
59,3
39,5
55,9
40,3
28,7
Goods turnover between Russia and
China(bln. U.S. dollars)
The relevance of establishment of logistics centers
in the Republic of Buryatia is based on the feasibility
of use of the transit and transport potential of the
Republic in the context of stable growth of the goods
turnover and cargo carriage between Russia and
China, the countries of the Asia-Pacific Region.
Factors of development of cargo carriage through the transport corridor
Construction and reconstruction of the Zamyn-Uud - Ulan-Bator - Altan-Bulak motorway
that is to be opened for traffic in 2015.
Expansion of the road border crossing Zamyn-Uud from the side of Mongolia on the border
with China.
The reconstruction of the multiway road border crossing «Kyakhta» that allows to increase
its capacity up to 1200 vehicles per day.Completion date is 2015.
Reconstruction and expansion of the Ulan-Ude – Kyakhtamotorway. Work performance
period is 2012-2015.
88,2
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Construction and reconstruction of the
Beijing - Zamyn-Uud(China) motorway
Construction of the Zamyn-Uud - Atan-
Bulak - Kyakhta (Mongolia) motorway
Construction of the Kyakhta - Ulan-Ude
(Russia) motorway
11
12. Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
THE AUTO-TOURISM CLUSTER “KYAKHTA”
Irkutsk
Mongolia
lake Baikal
Naushki Kjahta
It is proposed to implement the investment
projects of development and operation of transport
and logistics complexes located on two land plots 12
and 19 ha in area in the territory of the automobile
tourist cluster “Kyakhta” and bordering with the
multiway road border crossing «Kyakhta».
Service station for trucks
Open air parking for trucks
Cargo terminal including temporary
storage warehouses
Transport and logistics sector
Ulan-Ude
12
13. Altan-Bulak
The multiway road border crossing
«Kyakhta»
Offered vacant lots Highway Electrical sub-station
TIC – to $45 mln
А340
А340
Station «Naushki»
35 km
Ulan-Ude
224 km
Kjahta
19 hectares 12 hectares
13
MONGOLIA
RUSSIA
14. Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
THE PRODUCTION AND LOGISTIC CENTER
IN GUSINOOZERSK
Irkutsk
Mongolia
lake Baikal
It is proposed to implement the project of production
and logistic centers with reloading and container yard
within the territory of Gusinoozyorsk nearbyZagustay
railway station.
Two plots, each of which is 20 ha in area, nearby
the Ulan-Ude – Naushki railway were prepared for the
construction purposes.
There is a water power plant with a capacity of
1100MW within the territory of Gusinoozyorsk, and free
capacity for setting-up of power-consuming industries
is available.
Loading yards
The production and logistics centers
Gusinoozyorsk
Transport and logistics sector
Ulan-Ude
14
15. Offered vacant lots Electrical sub-station
Railroad
Highway
Projected railway branch
TIC – to $14 mln
TIC – to $14 mln
logistics center
The production and
logistics center
Goosenoe lake
Ulan-Ude
125 km
Gusinoozyorsk
1,100 MW
Gusinoozyorskaya TPP
(Termal Power Plant)
20 hectares
20 hectares
station
Zagustay
15
16. Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
SETTING-UP OF AN INTERNATIONAL TRANS-ASIAN
LOGISTIC COMPANY IN GUSINOOZYORSK
Irkutsk
Mongolia
lake Baikal
Setting-up of an international trans-asian logistics
company within the territory of the industrial special
economic zone in Gusinoozyorsk nearby the railway
station Zagustay is proposed for joint implementation
with the project initiator (OJSC «ANMET»).
Investment area - 146 hectares.
Implementation period: 2012 - 2016 years.
Indicators: TIC – to $84 mln
Trucking - 820 thousand tons per year
The number of vehicles - 400 cars with trailers, 100 units
of machinery
Gusinoozyorsk
Transport and logistics sector
Ulan-Ude
16
17. Projected railway branch
Offered vacant lots
Railroad
Highway
Ulan-Ude
125 km
Gusinoozyorsk
1,100 MW
Gusinoozyorskaya TPP
(Termal Power Plant)
146 hectare
station
Zagustay
Zone of economic favor
TIC – to $84 mln
17
18. А340
Р258
Р441
Р258
Р258
А164
А340
Р440
LOGISTICS CENTER, STATION
«SULFAT»
Irkutsk
Ulan-Ude
Mongolia
lake Baikal
Sulfate station
It is proposed to implement the project of multimode
container and reloading yard in the territory of the
village ofof Tokhoy nearby Sulfat railway station.
Free plot area is 20 ha. The plot is situated along the
Ulan-Ude – Naushki railway.
The Gusinoozyorskaya TPP (Termal Power Plant)
with a capacity of 1100 MW is located 9 km from the
proposedplot .
Multimode container and reloading yards Logistics center
Transport and logistics sector
Logistics center
18
19. Naushki
139 km
Gusinoozyorskaya TPP, 9 km
TIC – to $14 mln
TS «Tohoy»,
1 km
village
Tohoy
Offered vacant lots Highway Electrical sub-station
Ulan-Ude
116 km
20 hectares
Lake Solenoye
Projected railway branch
Sulfate station
TIC – to $14 mln
Railroad
19
20. А165
Р258
Р441
Р258
Р258
А164
А340
Р440
THE AUTO-TOURIST CLUSTER “BAYKALSKIY”
Irkutsk
Mongolia
lake Baikal
It is proposed to construct a service station for trucks
and cars.
The service station for passenger cars 700 m2 in area
as well as the service station for heavy vehicles, tourist
coaches, camping cars 3700 m2 in area.
Warehouse complex including trading facilities and
temporary storage warehouses with different storage
conditions.
Warehouse complex
Parking
Lower
Ivolga
Transport and logistics sector
Service station
Ulan-Ude
20
21. 35/10 КW
10/04 КW
2Х630,4 U.
А340
А340
Р258
Р258
village Nizhnyaya
Ivolga
Nur-Selenie
village
Offered vacant lots Highway Electrical sub-station
20 hectares
Ulan-Ude
2 km
Railroad, 9 km
Airport «Baikal», 3 km
TIC – to $14 mln
21
22. А340
Р258
Р441
Р258
Р258
А164
А340
Р440
LOGISTIC CENTER IN ULAN-UDE
Irkutsk
Ulan-Ude
Mongolia
lake Baikal
It is proposed to implement the project of setting-up
of industrial and logistic center and cargo terminal
within the territory of Ulan-Ude nearby Baikal airport.
The total area of 17.5 hectares of vacant land.
Multimode container and reloading yards
Transport and logistics sector
Industrial and logistic centers
+
22
25. Share of mineral resources of the Republic of Buryatia in the national mineral resources
26
Investments proposals, unlicensed stock
27
Mukhalskoye deposit Al2O3, Na2CO3, K2O
28
Vitimkonskoye ore field TiO2, FeO, V2O5
29
Mokhovoye deposit Sn
30
Synnyrskoye potassium-alumina deposit (Kalyumny site)
31
Chayskoye deposit Ni, Cu
32
Malo-Oynogorskoye deposit W, Mo
33
Dovatkinskoye polimetallic ore field
34
Chulbonskoye high-purity raw quartz deposit
35
Ozyorninskiy ore cluster
36
Soukhusan deposit Fe
38
Egitinskoye deposit CaF2
39
Kharanurskoye deposit P2O5
40
Aiktinskoye and Bolaiktinskoye raw cement deposits
41
Mukhor-talinskoye deposit, perlite and zeolite
42
Facing stones
43
Common minerals
44
Basalt
45
Mineral springs
46
26. Mineral resources sector
SHARE OF MINERAL RESOURSES OF THE REPUBLIC
OF BURYATIA IN THE NATIONAL MINERAL
RUSSIA
Buryatia
90%
nephritis fluorite asbestos apatite
16% 15% 13%
nonmetals
Zn Mo Pb W U
48%
32%
24%
20%
10%
metals
26
27. Cu, Ni
Sn Ti, Fe, V
Quartz
Al2O3, Na2CO3, K2O
Fe, Cu, Mn
Fe
Zn, Pb
Fluorite
W, Mo
P
P
INVESTMENT PROPOSALS
UNLICENSED STOCK
lake Baikal
Ulan-Ude
Al2O3, K2O
27
28. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Mukhalskoye deposit
Ust-Dzhilinda
Mineral resources sector 28
№ Data Alumina Cement Na2CO3 Potash
1 Period of coverage, years 31
2 Stock С1+С2, mln. t. ore 427,4
3 Resources Р1, mln. t. ore 273,1
4 Production output, th. t. per year 650 3 300 454 280
5 Selling price, $/t. 11 160 5 700 9 100 36 000
6 Cost of production, $mln. 7 254 18 810 4 131 10 080
7 Capex, $mln. 50 900
8 Specific production costs per ton of ore, $/t. 2 000
9 Net present value (NPV), $mln. 33 190
10 Internal rate of return, % 20
11 Capital investments payback period, years 6,6
Electrical transmission line
(110 Kw), 75 km
MUKHALSKOYE DEPOSIT
Al2O3, Na2CO3, K2O
Ulan-Ude
380 km
CONTENTS:
Al2O3 -25,1 %
K2O - 4,2 %
Na2O - 10,4 %
29. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
29
№ Data TiO2 FeO V2O5
1 Resources P2 -ore, mln. t. 1 097
2 Resources P2 , mln. t. 78 219 1,37
3 Content in the ore, % 7,1 20 0,125
4 Annual output: for the ore, mln. t. 20
5 Annual output, th. t. 1422 4 000 25
6 DPP, years 6,3
7 Return on investments, % 23
8 Approximate volume of investments, млн. руб. 9 380, 0
Vitimkonskoye
ore field
Electrical transmission line
(110 Кw) 30 km
VITIMKONSKOYE ORE FIELD
TiO2, FeO, V2O5
Irokinda
IRKUTSK
REGION
ZABAIKALSKIY
REGION
REPUBLIC
OF BURYATIA
The project provides for geological exploration works, development of Magnitny prospective area,
construction of mining-and-processing works
Ulan-Ude
700 km
Taksimo
30. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
№ Reserves
category
Ore
reserves,
th. t.
The average content, % Stocks of metal, th. t.
Sn Cu FeO Fe2O3 Sn Cu FeO Fe2O3
1 С2 1 105,53 1,146 0,412 7,254 11,548 12,66 4,55 80,31 127,67
2 Р1 1 105,53 12,66 4,55 80,31 127,67
3 Р2 308,48 5,53 0,78 30,45 66,17
4 In all: 2 519,54 30,85 9,88 191,07 321,51
Mineral resources sector 30
MOKHOVOYE DEPOSIT Sn
MOKHOVOYE
DEPOSIT Sn
Electrical transmission line
(110 ), 15 km
Irokinda
IRKUTSKY
REGION
ZABAYKALSKY
REGION
REPUBLIC OF
BURYATIA
Ulan-Ude
700 km
Taksimo
31. Новый Уоян
№ Data Ore Cement K2O Al2O3
1 Approximate volume of investments, млн. руб. 71 000,00
2 Output, th. t. /год - 3 300 1 820 650
3 Stock С2, mln. t. 679 - 123 152
4 Resources Р1, mln. t. 1 850 - 331 414
5 Content, % - - 17-18 22-23
6 DPP, years 5,8
7 Return on investments, % 41
Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
31
Novy Uoyan
Severobaikalsk
Nizhneangarsk
Synnyrskoye deposit
Electrical transmission line
(220 kW), 80 km
SYNNYRSKOYE POTASSIUM-ALUMINA DEPOSIT
(KALYUMNY SITE)
32. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Novy Uoyan
Severobaikalsk
Chayskoye deposit
Electrical transmission line
(220 kW), 45 km
№ Data Ni Cu Co
1 Annual output ore , th. t. 2 000
2 Stock С2 of ore, th. t. 51 100
3 Stock С2, th. t. 260 86 10,7
4 Resources, th. t. 800 270 33
5 Content, % 5,58 1,7 0,19
CHAYSKOYE DEPOSIT Ni, Cu
Mineral resources sector 32
Nizhneangarsk
33. MALO-OYNOGORSKOYE DEPOSIT W, Mo
Annual production, t/year:
Ore - 12 mln
Molybdenum concentrate – 8 490;
Tungstic anhydride – 2 543;
Pyrite concentrate – 178 000;
Acid ammonium molibdate – 159. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
33
№ Data Ore Mo WO3 S Re
1 Approximate volume of investments, млн. руб. 2625,0
2 Stock А+B+C1+C2, th. t. 305 014 154 922 122 602 4 790 2,5
3 Non-commercial reserves, th. t. 46 309 8 993 11 558 76
4 Resources Р1, th. t. 67,3 51,4
5 Content, % 0,066
6 Discounted payback period, years 4
7 Return on investments, % 36
34. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Maila village
Horinsk
Dovatkinskoye
deposit
DOVATKINSKOYE POLIMETALLIC ORE FIELD
Ulan-Ude
165 km
№ Data Ore Pb Zn Cd Ag Lead
concentrate
Zinc
concentrate
1 Approximate volume of
investments, млн.руб. 1500,0
2 Stock C1+C2,th. t. 1 720,7 83,9 123 549,2 230,5
3 Resources Р1+Р2,th. t. 23 225,3 850,5 1 397,1 5 382,82 2 913,5
4 Annual output,th. t. 300 10,2 16,4 28,7 16,9 32,7
5 Discounted payback period, years 4,2
6 Return on investments 39 %
Electrical transmission line
(110 kW), 42 km
Mineral resources sector 34
35. CHULBONSKOYE HIGH-PURITY RAW QUARTZ DEPOSIT
Sakhuli
Kurumkan
CHULBONSKOYE
HIGH-PURITY
Electrical transmission line
(220 kW), 110 km
Ulan-Ude
165 km
It is envisaged the development of a deposit, production of quartz concentrate, high-quality refined
silicon, multisilicon,and photoelectric systems.
THE LARGEST DEPOSIT
Quartz content from 99.96 to 99.98%
Light transmission coefficient 30-60%
Annual output:
• quartz grit – 5 000 t.;
• metallulgical refined silicon – 18 000 t.;
• quartz crucibles – 18 pcs.
• multisilicon – 10 000 t.
• Photoelectric systems – 200 MW.
Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
35
36. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Ulzytuyskoye
Solong
Oktyabrskoye
Mayskoye
Ozyorny
town
Yuzhno-Arishinskoye
Ozyornoye
Severno-Gurvunurskoye
Gurvunurskoye
Arishinskoye
Gunduyskoye
Turkulskoye Zvyozdnoye
Ozyorninskiy ore cluster
OZYORNINSKIY ORE CLUSTER
Distance to the city of Ulan-Ude - 300
km.
Distance to the nearest railway station
– 160 km.
Routed to the Ozyorny deposit 110 kW
transmission line and road paved.
110 kW transmission line also runs
along the road Ulan-Ude - Bagdarin.
Mineral resources sector 36
38. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
SOUKHUSAN DEPOSIT Fe
Sosnovo-Ozyorsk
Electrical transmission line
(110 kW), 35 km
Ulan-Ude
320 km
SOUKHUSAN
deposit
№ Data
1 Stock: С1+C2 , th. t. 67 000
2 Prognosticresources P1, thousand t. 300 000
3 Content Fe 49,3%
4 CAPEX , $ mln. 84,5
5 Annual cast iron production, th. t. 884,1
Mineral resources sector 38
39. № Data
1 Stock С1, th. t. 3 922
2 Stock С2, th. t. 445,8
3 Prognostic resources of ore cluster, th. t. of ore 5 800
4 Content, % 53,3
Egitinskoye Сосново-Озерск
deposit
Ulan-Ude
250 km
Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
39
Sosnovo-Ozyorsk
EGITINSKOYE DEPOSIT CaF2
40. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Sorok
Kharanurskoye
deposit
Electrical transmission line
(35 kW), 17 km
Ulan-Ude
470 km
№ Data Ore P2O5
1 Annual phosphorite meal production, th. t. 300
2 Common stock С1, th. t. 300 000
3 Easy-to-extract secondary rock phosphate reserve C1, thousand t. 3 292,5 588
4 Easy-to-extract secondary rock phosphate reserve C2, thousand t 652,6 107,3
5 Average content, % 17,9
6 Forecast resourses, th. t. 84 000 15 300
7 Discounted payback period, years 3,4
8 Assessment of investments profitability, % 32,4
9 Approximate volume of investments, млн. руб. 1750,0
Mineral resources sector 40
KHARANURSKOYE DEPOSIT P2O5
41. Taksimo
Aiktinskoye
deposit
Electrical transmission line
(220 kW), 24 km
Ulan-Ude
700 km
The deposits are developed for raw materials base for projected cement plant with a capacity of 2 mln.t. of cement
per year. The Aiktinskoye and Bolaiktinskoye deposits’ balance reserves of limestone and siltstone for portland cement
production by dry mix process for open mining were approved by the State Committee for mineral reservesof the
USSR as of 01.06.1989.
Bolaiktinskoye
deposit
Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
41
№ Data
Aiktinskoye deposit Bolaiktinskoye deposit
Limestones Limestones Siltstones
1 Stock А, th. t. 46 668 - -
2 Stock В, th. t. 37 950 - 12 531
3 Stock С1, th. t. 65 881 27 185 44 987
4 Reserves C2 outside the project quarries, th.t. 667 335 - -
AIKTINSKOYE AND BOLAIKTINSKOYE RAW CEMENT DEPOSITS
42. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Mineral resources sector 42
MUKHOR-TALINSKOYE DEPOSIT, PERLITE AND ZEOLITE
Reserves and resources of zeolitized rock 169,5 million t., including:
Reserves C2 – 63,7mln.t., P1 – 105,8mln.t.
Required basic investments amount – - $20 mln.
• PRODUCTION USE:
• Zeolites of market grades (0-1 mm, 1-3 mm, 3-5 mm, > 5 mm) for industries, agriculture, environment protection (1st
stage – up to 20 th. t./year)
• Perlites of market grades for construction enterprises (1st stage - up to 25 th. m3/year)
• Expanded perlite (sand and macadam)produced by using of the mobile facilities of Ukrainian Research and Development
Institute on construction materials and products (Ukr NIISMI);
• Cementless lime-perlitic and lime-zeolitic binders;
• Wall blocks with expanded perlite;
• Sand-lime bricks with zeolitic and perlitic components;
• Light porous materials, such as sponge glass, vitrophire, agroperlite;
• Organomineral fertilizer based on poultry-breeding biowaste
• and natural zeolites;
• Organomineral fertilizer based on urban waste water sludge and natural zeolites;
• Zeolite-mineral fertilizer based on natural zeolites and nitrogen-containing substances -
ammonium nitrate, carbamide;
• Household and industrial filters with natural zeolites for natural and waste water
purification (after-purification);
• Mineral dietary supplements, premixes, preparations, food supplements, deodorants,
fillings, substrates for animal breeding, veterinary,
agriculture, vegetable growing, household activities;
43. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
43
FACING STONES
Located in the Pribaikalsliy district 47 km north-west of Ulan-Ude on the right bank of the Selenga river. The nearest railway stations are Tataurovo (7
km) on the left bank of the river Selenga and the Mostovoy passing place (12 km) – on the right bank. The deposit is connected by the ferry line across
the Selenga river. On the right bank of the Selenga river the Ulan-Ude – Shergino crushed-rock road passes in the vicinity to the deposit. The deposit is
connected with the administrative center of the Pribaikalskiy district – the village of Tataurovo (24 km) as well as with the village of Koma (6,5 km) and
Ostrozhskoye (6 km) by dirt road suitable for all-year-round traffic.
1. Ostrozhskoye deposit
Located in the territory of Bichurskiy district, on the left bank of the river Ara-Kiret, 16 km south-west of the village of Bichury, 10 km
south of the village of Ara-kiret. The deposit is connected with the nearest localities Ara-Kiret, Elan and with the Ulan-Ude – Bichura –
Kudara motorway by trafficable dirt roads. Was explored by the production geological association “Buryatgeologia” (Reutova, 1980).
2. Ara-Kiretskoye deposit
Located in the territory of Dzhidinskiy district, 10 km north-east of the Dzhida railway station,
2.5 km north-west of the Butikhinskiy way station.
Based on the data available, the trachyandesites are recommended for the application in
construction.
3. Butikhinskoye deposit
2
1
3
Decorativeness level 10-11
COMMERCIAL RESERVES:
facing slabs B + C1 – 142 th.m2
Macadam for roads and concrete B + C1 – 515 th.m2
4. Doschatoye deposit
44. Mineral resources sector 44
COMMON MINERALS
32 DEPOSITS
А+В+С1 - 709 861 th. t.
limestone
55 DEPOSITS
А+В+С1 - 55 521 th. t.
Brick and tile raw materials
39 DEPOSITS
А+В+С1 - 152 645 th. m3
Sand and gravel mix
24 DEPOSITS
А+В+С1 - 12 270 th. m3
Sapropel
46. Mineral resources sector 46
MINERAL SPRINGS
District Spring name
1. North-Baikal district
(thermal waters)
Spring Goudzhekit, 6 l/s Spring Dzelinda, 22 l/s
Spring Irkaninskiy, 5 l/s
2. Kurumkan area
(thermal waters)
Spring Kuchiger, 10 l/s Spring Alla, 10 l/s
Spring Umkhey, 30 l/s Spring Garga, 5 l/s
3. Muyskiy district (thermal waters) Spring Tolmachevskiy, 15 l/s Spring Muyskiy, 15 l/s
4. Bauntovskiy district (thermal waters) Spring Bauntovskiy, 10-12 l/s
5. Barguzinskiy district (thermal waters) Spring Tolstikhinskiy, 6 l/s
6. Okinskiy district
(Cold water) Spring Zhoygan, 1 l/s
(Thermal water) Spring Khoyto-Gol, 13 l/s
7. Tunkinskiy district (thermal water) Spring Tunkinskiy, 6.7 l/s
8. Ivolginskiy district(Cold water)
Spring Arshan UtaBulag, 1-3 l/s
Spring Khalyutinskiy, 10 l/s
9. Kabanskiy district (thermal water) Spring Zagza, 2 l/s
10. Bichurskiy district (Cold water) Spring Shibertuyskiy, 100 l/s
11. Zakamenskiy district (thermal water) Spring Engorboyskiy arshan 2 l/s
12. Pribaykalskiy district Spring Pitatelevskiy, 3.13 l/s
47. 1
2
3
4
5
12
9 8
11
7
10
The Republic of Buryatia is rich in unique
mineral springs (more than 360 springs).
The main indications for therapy are:
• diseases of the circulatory system;
• diseases of the nervous system
• diseases of digestive organs;
• diseases of genitourinary system;
• endocrine diseases;
• metabolic disorders;
• skin disease;
• diseases of musculoskeletal system;
• gynecological diseases;
• pediatrics.
1
2
3
4
5
12
9 8
11
7
10
Kurumkansky
district
Severo-baikalskiy
district
Bauntovskiy district
Barguzinskiy district
Okinskiy district
Tunkinskiy
district
Muyskiy
district
Bichurskiy
district
Zakamenskiy
district
Kabanskiy district Pribaykalskiy district
6
lake Baikal
Ulan-Ude
Ivolginskiy
district
47
49. Agricultural park “Ilkinskiy”:
50
Poultry farm
52
Commercial dairy farm
53
Greenhouse facility
54
Vegetable store and vegetable processing shop
55
Goat farm
56
Biogas station with disposal facilities, boiler station, electrical sub-station, water intake facilities
57
Construction of greenhouse complex in Gusinoozyorsk
58
Commercial dairy farm of 1000 animal units in the village of Zagustay
60
Construction of the fattening complex for 2000 cattele unitsin the village of the ust-altasha and the village of Tsolga
62
Fattening complex for 3000 cattle units in the village of of Nizhniy Torey
64
Construction of the fattening complex for 1000 cattle units in the village of of Dyrestuy of the Dzhidinskiy district
66
Construction of the fattening complex for 1000 cattle units in the village of of Novaya Bryan of the Zaigraevskiy district
68
50. Objects of the agricultural park “Ilkinskiy”
№ name Land area
1 Poultry farm 36,7 hectares
2 Commercial dairy farm 13,6 hectares
3 Vegetable store 9,8 hectares
4 Greenhouse facility 18,4 hectares
5 Goat farm 7 hectares
6 Vegetable processing shop 2,9 hectares
7 Biogas station with disposal facilities, boiler station, electricalsub-station 12 hectares
8 Water intake facilities 6,3 hectares
9 Farm machinery production and service integrated plant with trading facility and
trading pavilion 10,08 hectares
50 Agro-industrial sector
AGRICULTURAL PARK “ILKINSKIY”
lake Baikal
Р258
Р258
Р258
А340
Ulan-Ude
Investment site the Agricultural park “Ilkinskiy”
in the territory of the rural village Ilkinskoye of
the Zaigraevskiy district. Total project cost $143
mln.
Ilka
51. Offered vacant lots Railroad Electrical sub-station
Highway
Ulan-Ude
84 km
Ilka station
150 hectare
1
2
3
9
8
4
5
Site plan of the Agricultural park
“Ilkinskiy”
6
7
51
52. Agro-industrial sector
AGRICULTURAL PARK “ILKINSKIY”:POULTRY FARM
Project cost – $45 mln
Area – 36,7 hectare
Egg production capacity – 1.25 mln. p/year
Meat production capacity – 5000 t. per year
PbP – 7,5 years
IRR – 26,5%
AARR – 18%
Payback – 5,6 years
1 – poultry house for 1000 purebred hens;
2 –hatcheries for 50 thousand chicks;
3 – poultry houses for laying hens of breeding stock;
4, 27 – bedding storage; 5 –parking boxes; 6 – car wash; 7 – petrol station;
8 – service buildings suite with sanitary inspection room for eggs and poultry
containers; 9 - autoweight; 10 - administrative and amenity building with control
room; 11 – slaughterhouse, packing department, 12 –hatcheriesfor chicks feed for
36 thousands bird places; 13 - egg-handling plant for 140 – 160 thousand eggs per
shift;14 – feed room; 15 – feedstuff store for 1000 t.; 16 – silage store; 17 – root
vegetables store; 18 – brigade house for 10 persons; 19 – tuber corps store; 20 –
veterinary; 21 – poultries for chicks of breeding stock for 12 thousand animal units;
23 –electrical substations; 24 – acclimatizators for 12-15 thousand youngsters; 25
– solarium; 26 - brigade house for 25 persons; 27 – hatchery.
24 26
25
27
1
21
2
23
26
23 3
18
18
22
4
5
8
9 10
6
13 7
14
15
16
19 17
12 11
20
52
53. AGRICULTURAL PARK “ILKINSKIY”:COMMERCIAL DAIRY FARM
3 2 1
4
6
7 8
5
5
5
5
5
5
5
5
Project cost – $ 10,5 mln
Area – 13,6 hectares
Production capacity – 3 500 t. per year
PbP – 3,8 years
IRR – 61%
1 – muck storage;
2 – hay and chaff storage;
3 – silostorage;
4 – auxiliary department, machinery storage and
maintenance, feed room with hoppers;
5 – cow sheds;
6 – administration, sanitation unit;
7 – truck scales;
8 – sanitary inspection station and farmerhouse..
53
54. Agro-industrial sector
AGRICULTURAL PARK “ILKINSKIY”:GREENHOUSE FACILITY
Construction of multispan greenhouses is proposed.
Project cost – $47,5 mln;
Area – 18,4 ha;
Production capacity – 10 000 t. per year.
1 – multispan greenhouse;
2 – production department;
3 – gate house, administration unit.
1 1 2 3
1 1
1 1 1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
54
55. AGRICULTURAL PARK “ILKINSKIY”:VEGETABLE STORE AND
VEGETABLE PROCESSING DEPARTMENT
Construction of 8 vegetable stores 12x105 m in size is
proposed.
Peeling and packing of fresh vegetables as well as
advanced processing – fermentation, conservation – are
to be performed at the vegetable processing shop.
Стоимость проектов – $8,5mln and $5mln;
Area – 9,8 ha и 2,9 ha;
Production capacity – 64 000 t. per year;
PbP – 1,6 years;
IRR – 28,7%.
1 – auxiliary building;
2 – vegetable store;
3 – gate house, administration unit..
1
2 3
2
2
2
2
2
2
2
55
56. Agro-industrial sector
Project cost - $7,3 mln;
Area - 7 ha;
Production capacity 4000 t. per year;
IRR – 82,76 %;
AARR – 44,09 %;
Payback – 2,6 years.
Proposed layout:
-production shop;
-5 stabling farms for 2500 goats;
-administration building.
AGRICULTURAL PARK “ILKINSKIY”:GOAT FARM.
1-buildings for goats handling
2-feedstuff stores;
3-production department;
4-gate house, administration
unit.
56
57. AGRICULTURAL PARK “ILKINSKIY”:BIOGAS STATION WITH DISPOSAL FACILITIES, BOILER
STATION, ELECTRICAL SUB-STATION, WATER INTAKE FACILITIES
7 7
1
1
Project cost - $20,5 mln;
Площадь участка 12 ha;
IRR – 17,01 %;
AARR – 15,34 %;
Payback – 6,6 years.
Advantages of biogas station:
- Independence from increasing rates as well as from
possible gas and electric power supply disruption;
- Simultaneous availability of multiple energy:
electric power, heating, gas, motor fuel;
-Complete resolving of the problem of organic
recycling with its division into pure water, biohumus
and mineral fertilizers rich in nitric and phosphoric
components. 1
1 1
2
4 8 5
3
6
1 – biogas unit;
2 – electricalsubstation;
3 – gate house, administration unit;
4 - fertilizers production shop;
5 – storage yard;
6 – disposal facilities;
7 – absorption fields;;
8 – boiler station.
57
58. 5588 Greenhouse complex Agro-industrial sector
CONSTRUCTION OF GREENHOUSE
COMPLEX IN GUSINOOZYORSK
Greenhouse complex for growing of hydroponic
vegetables.
Area (полезная) – 10 ha
The total land area – 20 ha
Production capacity – 10 000 t. per year
Project cost – $36,5 mln
PbP – 5 years
Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
Irkutsk
Mongolia
lake Baikal
Gusinoozyorsk
Ulan-Ude
ADMINISTRATIVE
BUILDING
WAREHOUSES
GREENHOUSE
FACILITIES
59. Offered vacant lots Electrical sub-station
Railroad
Highway
The lake Gusinoe
Ulan-Ude
125 km
Gusinoozyorsk
Gusinoozyorskaya TPP
(Thermal Power Plant)
Capacity 1100 MW
20 hectares
Required systems for commercial
greenhouses:
• Drop irrigation system;
• Environmental system;
• Carbon dioxide fertilization system;
• Curtain system;
• Drain return and check system;
• Greenhouse heating system;
• Air ventilation system;
• Power supply system.
59
60. 60 Agro-industrial sector
COMMERCIAL DAIRY FARM FOR 1000
ANIMAL UNITS IN THE VILLAGE OF OF
Commercial high-tech production dairy farm for
1000 animal units in the village of of Zagustay of the
Kizhinginskiy district.
The total land area – 2 500 ha (expandable to 10 000
ha).
Production capacity – 5 600 t. per year
Project cost – $13,5 mln
NPV – $2,1 mln
PbP – 8,8 years
lake Baikal
Zagustay
MILKING ROOM
COW SHEDS
CALF SHEDS
Р258
Р258
Р258
А340
Ulan-Ude
ARTIFICIAL INSEMINATION
CENTER
MATERNITY BARN
VETERINARY STATION
GARAGE AND VEHICLE REPAIR
SHOP
SILAGE PIT
ADMINISTRATION
BUILDING
61. Offered vacant lots Highway Electrical sub-station
the lake
Sagan-Thorom
Ulan-Ude
187 km
COMMERCIAL DAIRY FARM: 2 500
• 2 cow sheds for 500 animal units
each;
• 2 calf sheds for 1 154 animal units;
• Maternity barn for 68 animal units;
• Milking room 2 x 20 (Europarallel);
• Veterinary station;
• Artificial insemination center;
The village of
Zagustay
Auxiliary production facilities:
• Barn floor, feed processing shop
and feedstuff store;
• Silage pit;
• Garage and vehicle repair shop;
• Administration building;
• Muck storage tanks;
• Biogas unit.
61
62. 62 Agro-industrial sector
CONSTRUCTION OF THE FATTENING COMPLEX FOR
2000 CATTLE UNITSIN THE VILLAGE OF OFS UST’-
ALTASHA AND TSOLGA
The total area of farmland – 8249,37 ha
Project cost – $19,5 mln
NPV – $2 mln
PbP – 8 years
IRR – 13,1 %
lake Baikal
Р258
Р258
Р258
А340
Ulan-Ude
Tsolga
STORAGES
FEED YARD
HAY AND SILAGE PITS
64. Feedlots (top view)
Agro-industrial sector
FATTENING COMPLEX FOR 3000 CATTLE UNITS
IN THE VILLAGE OF NIZHNIY TOREY
Livestock breeding complex for cattle feed and raising
for 3000 cattle units, rural village “Nizhnetoreyskoye”
in the village of Nizhniy Torey of the Dzhidinskiy
district.
Project cost - $14 mln
РВР - 8 years
Land areas - 11000 ha
Production capacity - 6000 t. per year
MUCK STORAGE
LOAFING FEED YARD
CATTLE FATTERING BUILDING
FOR 230 ANIMAL UNITS
Feedlot layout
Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
Irkutsk
Mongolia
lake Baikal
Village Nizhniy Torey
Ulan-Ude
HEIFER FARM FOR 360
ANIMAL UNITS
HAY PIT
HAY AND CHAFF LAND
STORAGE YARD
AGRICULTURAL VEHICLES
SHED
HAY AND CHAFF STORAGE
YARD
64
65. • open feed yards
• own
• fodder in stock
• products processing management
• government support
Setting-up of beef and
breeding stock-rearing
farm:
Village Nizhniy Torey
Ulan-Ude
Auxiliary production facilities:
• Barn floor, feed processing shop
and feedstuff store
• Silage pit
• Garage and vehicle repair shop
• Administration building
• Muck storage tanks and biogas unit
272 km.
Land boundaries
65
66. CONSTRUCTION FATTENING COMPLEX ON 1,000 HEAD OF
CATTLE IN THE VILLAGE DYRESTUY DZHIDA DISTRICT
Necessary investments,
$ mln. 10,5
Area, ha 1500,5
Category of land Agricultural
land
Possibility of extension Available
The distance to a highway, km 2
The distance to a railway station, km 5
The distance to an airport, km 230
The distance to the nearest residential
area, km
2
Labor resources, persons 1246
Agreed discounting rate, - D,% 2,85
Net present value – NPV, mln. rub. 68,56
Internal rate of return – IRR, % 8,08
Pay-back period – PBP, years 7,75
Agro-industrial sector
А165
М55
Р441
М55
М55
А165
Р440
А340
Р258
Р258
Р258
А164
Р440
lake Baikal
Irkutsk
Mongolia
Ulan-Ude
Dzhida
А340
Dyrestuy
66
67. Land areas Railroad
Highway
nomad camp
Dyrestuy
the village
of of Zarubino
331,3 hectares
362,6 hectares
806,6 hectares
• open feed yards
• own fodder in stock
• government support
• products processing
management
Setting-up of beef and
breeding stock-rearing
farm:
Ulan-Ude
230 km
67
68. CONSTRUCTION FATTENING COMPLEX BY 1000 HEAD OF
CATTLE IN NEW BRJAN ZAIGRAEVSKY DISTRICT
Necessary investments , $ mln. 10,5
Area, ha 2500
Category of land Agricultural land
Possibility of extension Available
The distance to a highway, km 0,5 km
The distance to a railway station, km 5 km
The distance to an airport, km 70 km
The distance to the nearest residential
area, km
2 km
Labor resources, persons 4431
Agreed discounting rate, - D,% 2,85
Net present value – NPV, mln. rub. 68,56
Internal rate of return – IRR, % 8,08
Pay-back period – PBP, years 7,7
agro-industrial sector
The lake Baikal
Р258
Р258
Р258
А340
Ulan-Ude
Novaya Bryan
68
71. Comprehensive residential development in Ulan-Ude
72
Research park “Biotekhnopolis”
74
The zone of economic favor in Ulan-Ude
78
The industrial zone of economic favor in Gusinoozyorsk
80
Farm machinery production in the agricultural park “Ilkinskiy”
82
Construction of industrial and logistic center, Sulfat railway station
84
Industrial park in Ulan-Ude
86
Construction of cement plant
88
Ceramic bricks production plant
90
72. South-Eastern district of Ulan-Ude
South-West district of Ulan-Ude
COMPREHENSIVE RESIDENTIAL DEVELOPMENT IN
ULAN-UDE
Industry and residential construction
А165
М55
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
lake Baikal
Irkutsk
Mongolia
Ulan-Ude
Quarter 115 116
Area of land,hectares 20,4 26,8
Residential area, m2 116,744 146 398
Office and commercial area, m2 3 509 4 610
kindergarten, locations 140 200
school, locations 700
The volume of investments, тыс.
руб. 4 192 196 5 322 542
Quarter 140 6 146 а 146 б 148 a 148 б
Area of land,hectares 21,3 19 20,3 17,7 17,5
Residential area, m2 110 813 98 848 105 611 110 501 109 253
Office and commercial area, m2 3 664 3 268 3 492 3 044 3 010
kindergarten, locations 140 130 140 140 140
school, locations 1400
The volume of investments, $ thousand. 113 107 102 010 108 386 110 595 109 460
72
73. Airport «Baikal»
Railway station
South-Eastern district of Ulan-Ude
(140б; 146а,б; 148 а,б quarters)
Offered vacant lots
47,2 hectares
Highway
Ulan-ude
Railroad
South-West district of Ulan-Ude
(115, 116 quarters)
95,8 hectares
73
74. Biotekhnopolis
А165
М55
Р441
М55
М55
А165
Р440
А340
Р258
Р258
Р258
А164
А340
lake Baikal
Industry and residential construction
RESEARCH PARK “BIOTEKHNOPOLIS”
Irkutsk
Mongolia
Ulan-Ude
74
We invite you to become a resident of the
“Biotekhnopolis” high tech research park being
created in Ulan-Ude.
The priority sectors of the research park are:
• information technology and software;
• Energy efficiency and energy saving;
• Biopharmaceutical and medical technologies.
•
The research park project is initiated by the
Government of the Republic of Buryatia and the
Buryat scientific center ofthe Russian Academy of
Sciences, Siberian branch.
The site for the research park development is
located in the south-east part of Ulan-Ude, in the
zone of economic favor.The land plot area is 21 ha.
75. 12345
1.
Residential complex
2.
Data-center
3.
Production building
4.
Multifunctional center
5.
Medical high technology center
Starting up of production in this territory the companies for 5 years will enjoy the following tax reliefs: property tax and land tax exemption, reduced corporate tax rate.
75
76. Industry and residential construction
Construction of the first start-up facility of the research park is funded from the federal and
regional budgets.Businesses will be located at a site of 31600 m2 in area:
• medical hightechnology center (6600 m2);
• production premises (9000 m2);
• data-center (8000 m2);
• multifunctional service center for the research park residents;
• business-incubator.
We invite pharmaceutical enterprises, medical
device and equipment manufacturers, as well as
energy-saving goods manufacturers to start up their
production in the research park.We also welcome
companies working in the field of alternative energy
and information technology. The enterprises will
be provided with production shops, laboratories,
warehouse, office and amenity premises.
Biotekhnopolis
76
78. Electric power supply
Available capacity of the transformer substation
“Stroitelnaya” 35/10 12.6 MVA
Including free capacity 11.2 MVA
Wastewater disposal.
Wastewater disposal is performed through a free-flow tank to the
municipal sewerage, the networks length – 8000 meters.
Heating supply
Available capacity Boiler house with 4 boilers, with nominal capacity of 4x13,3MMkcal/hr,
including free capacity 3 reserve boilers,with a capacity of about 50 MMkcal/hr
Transport availability
Railwayembankment (9.8 km). Dirt road (900 meters).
It is possible that access roads (900 meters of automobile road) will be built and railways will be restored (7,8 km).
Watersupply
Available capacity 5 artesial water wells with total
well yield 47,5 m3/hour
Including free capacity 4 reserved water wells with total
capacity of 40 m3s per hour
А165
М55
Р441
М55
М55
А165
Р440
А340
Р258
Р258
Р258
А164
А340
EXISTING INFRASTRUCTURE
lake Baikal
Industry and residential construction
THE ZONE OF ECONOMIC FAVOR IN ULAN-UDE
Irkutsk
Mongolia
Ulan-Ude
78
79. Legend:
Biotekhnopolis
Railway (embankment)
Boiler station
Water intake facilities (5 water supply wells)
Water conduit
Water conduit (project)
Sanitation
Sanitation (project)
Power line (project)
Heating line
Heating line (project)
Electric power supply
Existing
Transformer substation 3510KW
Transformer substation 22010 (project)
А B
D C
Zone of economic favor Offered vacant lots Distributed sites
Privileges provided to residents of the zone of
economic favor for 5 years:
• Reduced land rental (from 1 rub. / 1 m2 per
year)
• Property tax exemption
• Land tax exemption
• Reduction of corporate tax rate
ABCD outline
25 hectares
8 hectares
20 hectares
20 hectare
79
80. Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
THE INDUSTRIAL ZONE OF ECONOMIC FAVOR IN GUSINOOZYORSK
Irkutsk
Mongolia
lake Baikal
The projects of the building materials production,
processing industry and assembling in the territory of the
industrial zone of economic favor in Gusinoozyorsk nearby
Zagustay railway station are proposed.
The investment site №1 (free and clear of any claims
from third parties) 52 ha in area for industrial production
development.
The investment site №2 (the project initiator “PIK” LLC)
100 ha in area for joint implementation of the project of the
mini-plants complex in the construction industry with total
investment up to $14 mln.
Gusinoozyorsk
Industry and residential construction
Ulan-Ude
THE CONSTRUCTION OF A HYDROCARBONS DEEP
CONVERSION PLANT
THE CONSTRUCTION OF A BUILDING MATERIALS
PRODUCTION PLANT
80
81. Offered vacant lots
Site №2
100 hectares
Railroad
Highway
Ulan-Ude
125 km
Gusinoozyorsk
Gusinoozyorskaya TPP
(Thermal Power Plant)
Capacity 1100 MW
Site №1
52 hectares
Zagustay
station
Zone of economic favor Distributed sites
TIC – to $14 mln
81
82. Industry and residential construction
FARM MACHINERY PRODUCTION IN THE
AGRICULTURAL PARK “ILKINSKIY”
lake Baikal
Ilka
Р258
Р258
Р258
А340
Ulan-Ude
The project for organization of small farm
mechanization assembling, repair, maintenance of the
machinery and equipment for agriculture and forestry.
The market: the Republic of Buryatia, Irkutsk Region,
Transbaikalia territory, Krasnoyarsk Territory, and other
regions of Siberia and the Far East, in the long term –
the opportunities to export to Mongolia.
• The buyers of the farm machinery are entitled to a compensation for a share of the cost of high tech
machinery and equipment.
GOVERNMENT SUPPORT MEASURES
82
83. Offered vacant lots
Railroad Electrical sub-station
Highway
Ulan-Ude
84 km
Ilka station
150 hectares
83
1
1 3
4
2
Site Plan
1 – administrative and amenity building;
3 – production shop; 4 – trading pavilion;
2 – the site for fairs and public events.
4
4 4 4 4
84. А340
Р258
Р441
Р258
Р258
А164
А340
Р440
CONSTRUCTION OF INDUSTRIAL AND LOGISTIC
CENTER, SULFAT RAILWAY STATION
Irkutsk
Ulan-Ude
Mongolia
lake Baikal
It is proposed to implement the project of industrial
and logistics center construction in the territory of
the village of Tokhoy nearby Sulfat railway station.
Free plot area is 28 ha. The plot is situated along the
Ulan-Ude – Naushki railway.
Gusinoozyorskaya TPP (Termal Power Plant) is 9
km from the proposed plot.
Multimode container and reloading yards
Sulfat railway
station
Industry and residential construction
The production and logistics
center
84
85. Naushki
139 km
Gusinoozyorskaya TPP
(Thermal Power Plant)
9 km
Railroad
TIC – до 500 млн. рублей
“Tokhoy”
transformer
substation
1 km
The village of
Tokhoy
Offered vacant lots
Highway
Electrical sub-station
Ulan-Ude
116 km
28 hectares
озеро Солёное
Projected railway branch
Sulfat railway
station
TIC – to $14 mln
85
86. А165
М55
Р441
М55
М55
А165
Р440
А340
Р258
Р258
Р258
А164
А340
It is planned the creation of the building materials
production cluster with the development center of
high construction technologies.
The site of the industrial park has a number of
advantages:
• near the park is a railroad «Moscow - Ulan Bator -
Beijing»(1 km);
• federal highway R258 – Moscow-Vladivostok (10
km);
• the proximity to the key market (Ulan-Ude)
lake Baikal
Industry and residential construction
INDUSTRIAL PARK IN ULAN-UDE
Irkutsk
Mongolia
Ulan-Ude
The services for the industrial park residents
• provision of production areas;
• provision of office premises;
• provision of design services;
• equipment maintenance engineering Services;
• additional services (security, legal, IT services).
The residents are offered the entire complex of logistic service
:
• truck parking;
• warehouses;
• the rolling stock of freight rail cars with 4 rail tracks;
• storage yard;
• the services of the logistics center for registration, shipment and
receipt of cargo.
86
87. Airport «Baikal» Offered vacant lots Highway
Ulan-Ude
Railroad
The site has all the necessary infrastructure:
The total area of the park – 15hectare
Area Offices and
business premises – 5 000 m2.
Area of industrial building –25 000 m2
Water supply – 350 m3 per
day
Electricity power - 1,8 Megawatt
Distance to the highway R258 – 10 km
Distance to railway station – 1 km
Railway station
15 hectares
Production shops
Material handling cranes
Administration building
Finished goods warehouse
Parking
87
88. Industry and residential construction
CONSTRUCTION OF CEMENT PLANT
А165
М55
Р441
М55
М55
А165
Р440
А340
Р258
Р258
Р258
А164
Р440
lake Baikal
Irkutsk
Mongolia
Ulan-Ude
Jida
The project involves the construction of a cement
plant.
There are large limestone deposits in the Republic
of Buryatia providing the raw material for cement
production. Total reserve equals to 150 000 – 200 000
th. t.
А340
88
89. Barun-Toreyskoye limestones
deposit, C1 reserves ≈ 25,717
thousandt.
Toreyskoye limestone deposit,
C1 and C2 reserves ≈ 40,000
thousand t.
Barun-Sarastuyskoye limestones
deposit, C1 reserves ≈ 63,932
thousand t.
Barun-Alsagskoye limestones
deposit, C1 reserves ≈ 22,214
thousand t.
The chemical composition in
respect to the content of CaO >
50% and MgO > 2% in the deposits
Jida
Offered vacant lots Highway
Ulan-Ude
240 km
Р440
deposit of
limestone
Mongolia
89
90. Industry and residential construction
CERAMIC BRICKS PRODUCTION PLANT
А165
М55
Р441
М55
М55
А165
Р440
А340
Р258
Р258
Р258
А164
lake Baikal
Irkutsk
Mongolia
Ulan-Ude
Orongoy
The projectinvolves the construction of a ceramic bricks
production plant with a capacity up to 60 mln.units per
year.
Land plot for the construction of the plant is 60 km from
Ulan-Ude, close to the Moscow – Ulan-Ude – Ulan-Bator –
Beijing railway and the Ulan-Ude – Ulan-Bator motorway.
The clay deposit (the stocks of 1427 thousand m3s) is
located 10 km from the plot.
There is a technical capability for power supply
connection, capability for well drilling.
The indicators of economic efficiency of the project
The volume of investments $21,2 mln.
NPV $1,7 mln.
IRR 13 %
PBP 4,68 years
DPBP 4,62 years
Profitability of the investment
project 6,54 %
90
93. The Baikal Haven special economic zone
94
The site “Bukhta Bezymyannaya”
96
The site “Gora Bychya”
98
The tourist and recreational cluster “Podlemorye”, the site “Zarechye”
100
Key development indicators of the tourist and recreational cluster “Podlemorye”
102
The automobile tourist cluster “Baykalskiy”
104
Infrastructure and key indicatorsof the automobile tourist cluster “Baykalskiy”
106
The automobile tourist cluster “Tunkinskaya dolina”
108
Infrastructure and key indicatorsof the automobile tourist cluster “Tunkinskaya
110
The automobile tourism cluster “Kyakhta”
112
Infrastructure and key indicatorsof the automobile tourist cluster “Kyakhta”
114
“Adrenalin” (the alpine ski resort on Orlinaya mountain)
116
Infrastructure and key featuresof the park “Adrenalin”
118
Development of the medical recreational complex “Ilyinka SPA”
120
Sports and health complex at Lake Baikal in the Enkheluk village
122
Key indicators of the project in the Enkheluk village
124
94. А340
Р258
the site «Турка»
ADVANTAGES:
Provision of the investment site with utility infrastructure
Provision of tax benefits and state guarantees of the Republic of
Buryatia;
The capability of buyout of the land plots by the owners of the
facilities.
№ Specialty A year-round world class
resort
1 Term of existence 49 years
2 Area 5 areas - 3658 ha
3 Arrivals per year 1 000 000
4 Locations 22 000
lake Baikal
THE BAIKAL HAVEN SPECIAL
ECONOMIC ZONE
Ulan-Ude
Турка
Пески
Гора Бычья
(1771 м.)
Бухта Безымянная
Tourism and Recreation Sector
Горячинск
94
95. Особая экономическая зона туристско-рекреационного типа «Байкальская гавань»
The sites of the first stage of
development:
• Turka
• Peski
The sites of the second stage of
development:
• Goryachinsk (460,9 ha)
• Bychya mountain (2341 ha)
Ulan-Ude
110 km
Bay Bezymyannaya
Goryachinsk
Peski
Turka
Gremyachinsk
Bychya mountain (1771 м.)
lake Baikal
lake
Kotokel
95
96. А340
Р258
lake Baikal
THE BAIKAL HAVEN SPECIAL ECONOMIC ZONE
THE SITE “BUKHTA BEZYMYANNAYA”
Ulan-Ude
Bay Bezymyannaya
1. Recreational and entertainment complex
“Mir Baikala”
2. Park “Baikalskaya Venezia”
3. Stadium, sports playgrounds
4. Trading area
5. First-aid post
6. Boiler station, disposal facilities
7. Parking and logistics
8. Parks and recreation zones
9. Fire station
10. Entertainment zones
11. Electrical substation
12. Sports playgrounds
13. Luxury pensionates and hotels
14. Midscale pensionates and hotels
15. Equestrian centre
6
7
7
7
8
8
8
9
10
10
11
12 12
13 13
14
14
14
14
1
2
3
4
3
3
4
5
Total investment – 7,320 bln.rub., including:
• 2,115 bln.rub. of investments in engineering
andtransport infrastructure;
• 5,205 bln.rub.of investments in tourism and
recreation facilities.
Tourism and Recreation Sector
15
96
97. Offered vacant lots
Highway
270 ha
Goryachinsk
Bezymyanka
lake Baikal
Besymianyi Cape
The coastal park “Baikalskaya Venezia” with
wood bridges and small forms
SPA-center
Ski tours,snowkiting, sledding
Types of recreation and
entertainment:
• Skating, skiing, sledding,
snowmobile driving;
• Ice boat driving, snowkiting;
• Winter and summer fishing,
diving, hourse riding;
• Beach, SPA, boating,
yachting;
• Oriental medicine practice.
97
98. lake Baikal
Ulan-Ude
А340
Р258
the Bychya
mountain
(1771 м.)
98
THE BAIKAL HAVEN SPECIAL ECONOMIC ZONE
THE SITE “GORA BYCHYA”
• 7 lifts;
• 16 runs the length of 28,77 km;
• Snowmaking system;
• 10 000 holidaymakers;
• The resort town with shopping,
entertainment, and sports centers.
Tourism and Recreation Sector
Economic indicators:
IC – $224 bln;
SR – $70 bln;
ROS – 65%;
ROI – 22%;
Types of recreation and entertainment:
• Alpine and cross-country skiing,
freestyle, mogul skiing, ski-cross;
• Tubing, halfpipe, skiing slopestyle,
freeride skiing;
• Toboggan, mountain bike,
skateboard,
the Bychya mountain
99. Legend:
The zone for the ski runs widening
The optimal zone for ski runs
slopes
lighting point
Freeride
Profile cross-country
SKI SLOPES
lake Baikal
the Bychya
mountain
the lake
Bychye
99
100. А340
Р258
lake Baikal
• Health-improving and family vacation with children;
• Romantic yacht tours, cruise for married couples without
children seeking a different vacation experience;
• Event tourism;
• Beach vacations;
• Year-round weekend tourism;
• Outdoor activity and extreme tourism for trained persons
and sportsmen;
• Ecotourism for those who desire to spend time in the
countryside with small physical activity;
• Business tourism; (MICE).
THE TOURIST OFFER:
The layout chart of the tourist and recreational
cluster “Podlemorye” in the planned structure
of the rural village municipality of Sukhinskoye
Tourism and Recreation Sector
THE TOURIST AND RECREATIONAL CLUSTER
“PODLEMORYE”, THE SITE “ZARECHYE”
Zarechye
Ulan-Ude
The site “Zarechye”
The site “Sukhaya”
The site“Enkheluk”
The total area of the cluster – 139,52 ha
lake Baikal
100
101. OFFERS FREE SITES:
1. The forested plot 2,9628 ha in area is located 1,250 m north-west from the Zarechye village, to the north of the complex of
buildings on the right side of the projected haven, bordering with the Lake Baikal coast line.
2. The forested plot 1,6277 ha in area is located 1,300 m north-west from the Zarechye village, to the north of the complex of
buildings on the right side of the projected haven, bordering with the Lake Baikal coast line.
3. The treeless plot 2,3408 ha in area is located 1,500 m north-west from the Zarechye village
4. The treeless plot of the coast line of Lake Baikal nearby Cape Sukhinskiy, 2,3128 ha
1
2
3
4
10
Ulan-Ude
180 km
Railroad, 84 km
station Selenga
1. The guest center “Tengri”
2. Family boarding house
3. Tourist complex
4. Beach area “Baikalskie peski”
5. Reserve area
6. Golf club “Golfstrim”
7. Hotel and entertainment complex
“Zarechye”
8. Waste recycling station
9. Disposal facilities
10. Water intake facilities
1
The village of of
Zarechye
The village of
of Sukhaya
Offered vacant lots Electrical sub-station
Highway
The lake Baikal
Harbor
Water intake facilities
Water intake
facilities
2
4
3 10
5
10 6
10
8
7
8 9
101
102. Total volume of investments - 4 790,3 млн. рублей, including:
-1 632,3 млн. руб. - government investments in engineering and transport infrastructure
- 3 158 млн. руб. - private investments in tourism facilities
№ Title Capacity
1 Area of claster 139,5 ha
2 Area of tourist and service infrastructure 64,5 th. m2
3 Capacity hotels 1400 locations
4 Increase in employment to 2500 jobs
5 Increased flow of tourists to 450 th. people per year
6 Project implementation period 2013-2017 years
7 Construction of overhead power lines ВЛ-35 kW with substation 35/10 kW;
hvl-10 kW ; vl-0,4 kW
8 Construction of the transfer station with elements of separate waste
collection 10 t. per year
9
Construction of treatment facilities, including installation works,
construction and laying of sewer with sewage pumping stations,
installation and commissioning of sewerage systems, drainage;
construction and installation of sewage treatment plants.
500 m3/day
10 Construction of intake structures 2 buildings m3/day
11 Construction of internal paved roads 30 km long, 4 category 30 km
12 Work on bank protection 5000 m2
Tourism and Recreation Sector
KEY DEVELOPMENT INDICATORS OF THE TOURIST AND
RECREATIONAL CLUSTER “PODLEMORYE”
102
103. SCHEME OF ENGINEERING SUPPORT TRC «PODLEMORYE»
The site“Enkheluk”
The site “Sukhaya”
The site “Zarechye”
The lake Baikal
EXPLICATION
The site “Sukhaya”
1. ТFamily boarding house – 1,68 ha
2. Tourist complex – 9,1525 ha
3. The guest center “Tengri” – 0,2247
ha
4. Haven – 11,4 ha
5. Reserve area – 10,2 ha
The site “Zarechye”
1. Tourist complex – 23,7 ha
2. Hotel and entertainment complex
– 4,2 ha
3. Golf club “Golfstrim” – 2,2 ha
The site“Enkheluk”
1. Tourist camp “Enkheluk” – 4,7 ha
2. Guest house – 0,27 ha
3. Guest house “Sakura” – 0,25 ha
4. Guest house – 0,26 ha
5. Guest house “Baikalskiy dvorik” –
0,25 ha
6. Capm “Teremki” – 0,3 ha
7. Tourist complex – 7,5 ha
Legend:
Inhabited areas
Specially protected natural
areas
Forest reserve lands
Agricultural areas
Facilities ofthe tourist and recreational
cluster “Podlemorye”
Projected havens
Disposal facilities
Waste transfer station
Voltage transformer substation;
Electrical transmission line VL – 35 kW
103
104. А165
М55
Р441
М55
М55
А165
Р440
А340
Р258
Р258
Р258
А164
А340
Tourism and Recreation Sector
THE AUTO-TOURIST CLUSTER
“BAYKALSKIY”
Ulan-Ude
Irkutsk
Mongolia
lake Baikal
The Lower
Ivolga village
THE TOURIST OFFER:
PEAK SEASON:
• sports tourism;
• adventure tourism
• automobile tourism
• ecotourism.
OFF-SEASON OFFER:
• business tourism;
• cultural and educational tourism;
• event tourism;
• religious tourism;
• active tourism.
The Buddhist monastic complex, the center of the Buddhist Traditional
Sangha of Russia, historic and architectural monuments. The place of
104 stay of the incorruptible relics of Pandito Khambo lama Itigelov.
105. The Lower Ivolga
village
Nur-Selenie village
Ulan-Ude
2 km
Railroad, 9 km
Airport «Baikal», 3 km
Ivolginsky datsan, 15 km
А340
Р258
Р258
Offered vacant lots Distributed sites Highway
1.Hotel complex
2. Fast food café
3.Camping “Yurtochny gorodok”
4. Laundry of 5 washing-machines
5. Motel
6. Café
7. Hypermarket
8. Information center
9. Water park
10. Motel
11. The theatre of folk art
12. Recreational and entertainment center
13. Summer café
14. The outdoor area for playings and parties
15.Shopping and entertainment center
16. Fitness complex
SPA-center17. Farm products mimimarket
18. stable yard
19. Service station
20. Production and warehouse premises
21. Automobile showroom
22, 23. Truck parking;
24, 25. Wholesale-retail trade warehousing
complex
26. Petrol station
27. Camping sites, motel
28. Water intake facilities
29. Gas boiler house
31. Electrical substation 35/10 kW
32. Public toilet
33. Stadium
35. Police centre
36. Administrative office
37. Tea house
38. Railway station
39. Heated car parking
41. The buildings on the sports area
42. Sewerage pump station
43. Waste transfer station
44. Gas storage holder
1
26
25
24
39
20
19 22
21
23
39 35
29
44
28
43
18
31
3 2
4
5
6 42
32
17 36 37
7
8
9 11
12 14
13
10
15
16
105
106. №
Name
Capacity
1
Construction of the water conduit “Tapkhar – the automobile tourist cluster “Baykalskiy”
9,8 km
2
Construction of the electric power supply facilities.
The total length is 7,35 km. Capacity of the electric substation is 6,3 MW
3
Construction of the heating supplysystem
6 km
4
Construction of the gas boiler house
16 MW
5
Construction of the wasrewater disposal line,
9,5 km
6
Construction of the on-site information, communication and computer network
6 km
7
Construction of internal automobile roads with parkings,
the total length is 30 km
8
Construction of sites for waste receptacles,
0,1 km
9
Construction of street lighting,
6 km
10
Increase of the tourists flow to the region
to 400 thousand people per year
11
Increase of the total area of the tourism infrastructure facilities
by 170,41 thousand m2
12
Increase of the total area of the hotel infrastructure facilities
by 26,0 thousand sq. m .
13
Increase of the number of beds in group accommodation establishments
to 1165 units
14
Increase of the number of workplaces
to 1200
Total investment- 2182 mln.rub., including:
government investments in engineering and transport infrastructure – 751,6 mln.rub.;
private investments in tourism facilities – 1430,4 mln.rub. Free land plots area is 206 ha.
INFRASTRUCTURE AND KEY INDICATORSOF THE AUTO-TOURIST CLUSTER “BAYKALSKIY”
Tourism and Recreation Sector 106
107. Free land plots area is
206 hectares
The sites 1 – 3: transport and logistics zone (bus station, camping sites
and motels, fast food restaurants)
The sites 4 – 9: mixed development zone (shopping, public catering,
leisure and entertainment, and culture and educational facilities)
The sites 10-14: social and business zone (the center of exhibition and
congress activities; multiplex cinema, food court, café and restaurant, bowling,
fitness-club, billiard and shopping malls)
The sites 15-25: recreation and sports zone (sport complex, water park,
carting, entertainment park and equestrian center)
1 2
4 3
5
6
7
8
9 10
11
12
14 13
15
16
17
21
18 19
20
22
23
24
25
107
108. PETROL STATION
HALTING POINT
BATH-HEALTH COMPLEX
SERVICE STATION, PETROL
STATION FOR TRUCKS
CAR WASH TRUCK PARKING
MOTEL CAFÉ
TRADING FACILITY WITH
MARKET PLACE
HEATED CAR
PARKING
Tourism and Recreation Sector
THE AUTO-TOURIST CLUSTER
“TUNKINSKAYA DOLINA”
lake Baikal
Р258
А164
Р258 Kyren
Total investment- 2063,1mln.rub., including:
government investments in engineering and
transport infrastructure – 717,1 mln.rub.;
private investments in tourism facilities – 1346
Auto-tourist cluster mln.rub.
“Tunkinskaya
dolina”
Irkutsk
Mongolia
Republic of
Buryatia
Irkutsk region
THE TOURIST OFFER:
• Medical and health tourism based on thermal
water and mineral springs, spa-tourism;
• Mountain hiking;
• Religious tourism.
108
109. site А
- bath-health complex
site B
- the tourist and recreational complex
site С
- service station and convenience
retailing
Disposal facilities
1
2
3
4 10 7 5
11
12
13
Ulan-Ude
430 km
Mongolia
100 km
Railroad, 100 km
Offered vacant lots Distributed sites Electrical sub-station Highway
13,4 hectares
Water intake
facilities
1,2,3. Hotel complex
4. Sport tourist complex
5. Tourist complex
6. Yurt complex
7. Sports and health complex
8. Culture and entertainment complex
9. Tourist complex
10. Hopping center
11. Rental center
12, 13, 14. Auto parts store, petrol station, car-wash,
service station
15. Motel
1
7
6
8
9
109
110. № Name Мощность объекта
1 Free land plots area is 11,2 ha
2 Tourist flow 300,000 arrivals
3 NPV $21,5mln
4 PbP 8 years
5 Pi 1,37
6 The construction of the access road from the federal motorway to the
automobile tourist cluster “Tunkinskaya dolina” 4 km
7 The construction of water intake facility and water supply system 1250 m3/day
8 The construction of disposal facilities 2000 m3/day
9 9The construction of electric power network system 10 kW, 0,4 kW and
electrical sub-station 400 kW 18 km
10 The construction of waste sorting station 10000 t. per year
11 The construction of intraresort automobile road 2,5 km
INFRASTRUCTURE AND KEY INDICATORSOF THE AUTO-TOURIST
CLUSTER “TUNKINSKAYA DOLINA”
Tourism and Recreation Sector 110
111. 4
7 8
8
8
1 2
3
2 2
1
5
6
3
EXPLICATION
1. PETROL STATION
2. SERVICESTATION. CAR WASH.
3. HEATEDCARPARKING
4. BUS STOP PAVILION
5. MOTEL
6. CAFÉ FOR 50 PERSONS
7. TRUCK PARKING
8. TRADING FACILITY WITH MARKET
Type Codes
Boundaries of the facilities of the
automobile tourist cluster
Water protection area
Residential area
Service objects area
Outdoor activity area
Recreational area
Utility area
Engineering infrastructure area
Rural tourism area
Car service area
Projected building development
Projected sidewalks, roads
Driveways and parkings;
SPECIFIC LAND USE LAYOUT AND FREE LAND PLOTS OF THE AUTO-TOURIST
CLUSTER “TUNKINSKAYA DOLINA”
111
А
А
112. А165
М55
Р441
М55
М55
А165
Р440
А340
Р258
Р258
Р258
А164
А340
The cluster is perceived as the first reception point for
tourists arriving in Russia, as well as the largest border
crossing and customs point for freights imported in Russia
from the countries of the Asia-Pacific Region.
The freight traffic coming through Mongolia is predicted
to increase significantly due to the construction of the Ulan-
Bator - Beijing motorway that has already been completed on
the side of China.
lake Baikal
Tourism and Recreation Sector
THE AUTO-TOURIST CLUSTER
“KYAKHTA”
TOURIST OFFER:
• Religious tourism (Buddhism in Russia);
• Medical and health tourism (pelotherapy);
• Cultural and educational tourism (Tea Road);
• Historical tourism
Irkutsk
Mongolia
Ulan-Ude
Naushki Kjahta
Ulan-Ude
Irkutsk
Ulaanbaatar
Peking
Krasnoyarsk
Russia
Mongolia
China
112
113. Offered vacant lots
Highway Electrical sub-station
МАПП «Кяхта»
Altan-Bulak
RUSSIA
MONGOLIA
Station «Naushki»
35 km
Ulan-Ude
224 km
Город Kjahta
the site С
12 ha
the site В
19 ha
А340
А340
the site А
1,34 га
113
114. № Наименование Мощность объекта
1 Construction of water intake and water supply networks ATK «Kjahta» 80,0 m3/h
2 Construction of boiler and heating systems 7,5 Gcal/h
3 Construction of substation 110/10 kW, Vl-6 kW (10 km.), VL-0,4 kW (3
km.) And 2-transformer substation 2 x 1000 kW. 4000 kW
4 Construction of sewer networks 3 km
5 Construction of a telephone exchange and cable ducts 1500 phone numbers
6 Construction of internal roads with parking and sidewalks 5 km
7 The increase in tourist flow to 350 000
8 The increase in the total area of facility tourist infrastructure by 92,5 th. m2
9 The increase in the total area of the hotel infrastructure by 25,5 th. m2
10 Increase of seats in collective accommodation facilities to 1020
11 The increase in jobs to 1000
INFRASTRUCTURE AND KEY INDICATORSOF THE
AUTO-TOURIST CLUSTER “KYAKHTA”
Tourism and Recreation Sector 114
115. OFFERED VACANT LOTS (FIG. P. 113)
•
A. The flat grass covered plot (1,34 ha) with no bushes and trees, located within the city of Kyakhta,bordering to the north with the Ulan-Ude – Ulan-Bator federal road. Investors are proposed to develop shopping and social center in this plot (refer to fig.), which includes–along with shopping an catering facilities–multiplex cinema, bowling and billiard center, fitness center, children’s playing area, family entertainment complex with a shooting gallery, lasertag (Lasermaxx), gaming machines, etc.The proposed project is targeted at tourists and citizens of Kyakhta.
•
B. The flat plot (19 ha), partially bushy, located within the city of Kyakhta at the 1st kilometer of the Kyakhta – Bichura motorway. Investors are proposed to develop customs and logistics terminal of the 1st category with “A”-class warehouse complex. The capacity of the terminal allows to store simultaneously more than 300 vehicles.
•
C. The sloping grass covered plot (12 ha) with no bushes and trees located at the 2nd kilometer of the Kyakhta – Bichura motorway. Investors are proposed to develop a complex of ancillary services facilities (service station wih car parking, catering, hotel, insurance companies, etc). 234561 1 – petrolstation; 2 –Shopping and entertainment complex; 5 – hotel and office complex; center; 3 – shopping mall; 4 – hotel Complex; 6 – open air parking. 115
116. А165
М55
Р441
М55
М55
А165
Р440
А340
Р258
Р258
Р258
А164
А340
The site is 10 km from the center of Ulan-Ude.
The maximum natural elevation of the runs reaches
to 924 meters, with the natural skiable elevation
difference of 230-220 meters and the runs length
up to 820 meters.
The maximum capacity of the complex – 6200
people per day.
the lake Baikal
Tourism and Recreation Sector
“ADRENALIN” (THE ALPINE SKI RESORT
ON ORLINAYA MOUNTAIN)
Irkutsk
Mongolia
Ulan-Ude
SKI RESORT FACILITIES:
• the complex of ski runs, toboggan runs and ski lifts;
• service infrastructure (hotels, cafes, restaurants, shops);
• baths and spa-complex;
• equestrian center;
• service center;
116 • day and night parkings.
118. № Наименование Мощность объекта
1 The total area of the ski slopes 27,47 ha
2 Ski runs length 6925 м
3 Total chairlifts length 784 м
4 Ski tows length 1358 м
5 Unsupported ski lifts length 717 м
6 Infrastructure development area 20,6 ha
7 Proposed ski area capacity in terms of Persons at One Time (PAOT) 1500 человек
8 Simple pay-back period 7,62 years
9 Net present value (NPV) $5,5 mln
10 Internal rate of return (IRR) 16,4 %
11 Profitability index (PI) 1,14
12 Modified internal rate of terurn (MIRR) 15 %
13 Income reinvestment rate 14 %
14 Investment cost discounting rate 14 %
INFRASTRUCTURE AND KEY FEATURES OF
THE PARK “ADRENALIN”
Tourism and Recreation Sector
Total investments – 2278 mln.rub., including:
• 145 mln.rub. – investments in engineering infrastructure;
• 2 133 mln.rub. – investments in tourism and recreation facilities.
118
120. Tourism and Recreation Sector
lake Baikal
Ilyinka
Р258
Р258
Р258
А340
Ulan-Ude
TOURIST OFFER:
• Medical and health tourism (treatment of polyarthritis,
diseases of the nervous system and others)
• Hippotherapy
• Family recreation
• Sports tourism
DEVELOPMENT OF THE MEDICAL RECREATIONAL
COMPLEX “ILYINKA SPA”
The volume of investments - $14 mln.
Facility:
• Hotel for 100 guests;
• Bath building;
• Sports complex’
• Restaurants complex and
entertainment center.
120
121. Ulan-Ude
60 km
Highway
Offered vacant lots
The total land area
6,7 hectares
The site is situated nearby the
bank of the Selenga river and
shares a land border to the west
with the working health resort
“Ilyinka” of the Republican
Exercise Therapy Centre.
The water well of the
Pitatelevskoye thermal mineral
water deposit (chloride-sulphate-sodium
and sodium-calcium
mineral water)
Источник Railroad
минеральных вод
121
122. ТУРИСТСКОЕ ПРЕДЛОЖЕНИЕ:
• sports tourism;
• business tourism;
• beach and water tourism;
• family recreational tourism.
Tourism and Recreation Sector
А340
Р258
SPORTS AND HEALTH COMPLEX AT LAKE
BAIKAL IN THE ENKHELUK VILLAGE
Ulan-Ude
lake Baikal
Enkheluk
“Enkheluk” means “calm, blessed” in Buryat. There
are natural sand beaches at the sites proposed to
investors.
The mountain slopes of the Morskoy ridge covered
in mixed softwood forest appear in the vicinity of the
proposed sites (the highest point of the ridge – the
Davydov bald peak 1 707 meters high).
Asphalt road distance to Ulan-Ude – 170 km.
The Davydov
bald peak
122
123. Enkheluk
3 land plots 16 ha in area
are offered to investors
Offered vacant lots Highway Electrical sub-station
Ulan-Ude
170 km
The lake Baikal
123
124. KEY INDICATORS OF THE PROJECT IN THE ENKHELUK VILLAGE
№
Title
Capacity
1
Development area
4000 м2
2
Total floor area
6200 м2
3
Construction volume
22 000 м3
4
Maximum tourist flow (on condition of full house)
90 000 peoples/day in year
5
Winter season occupancy
40% (22 050 peoples/day)
6
Summer season occupancy
85% (19 550 peoples/day)
7
Estimated cost of the project
$7,65mln
8
Construction period
9 months
9
Payback period
84 months
10
The period of achievement of full project capacity
12 months
11
NPV
$500 th.
12
Number of created workplaces
60 units
Tourism and Recreation Sector 124
125. • ahotel with 80 rooms, three VIP cottages for 6
guests,three cottages for 8 guests, a motel for
32 guests and a camping for 54 guests – total
accommodation for up to 250 guests;
• parking for 100 cars;
• restaurant, bistro and open-air café for 300
persons;
• conference hall for 100 persons;
• concert venue;
• cimena-bar;
• billiard room;
• water sports center (gym, swimming-pool
(mini water park), fitness center, sauna, mini
football and volleyball courts, tennis court,
equipment rental);
• bath, barbeque area and bonfire site;
• children’s playground; skatepark and
rollerdrom.
PROPOSED FACILITIES OF THE COMPLEX
125
126. Primary objectives:
• development and promotion of the investment projects of the Republic of Buryatia;
• attraction of investors for projects implementation in the territory of the Republic;
• creation of favorable environment for investors supporting investment projects
based on one stop approach.
REGIONAL DEVELOPMENT FUND REPUBLIC BURYATIYA
Objective: attraction of investments to the economy of the
Republic of Buryatia.
Founder: the Government of the Republic of Buryatia represented by the Ministry of
Economy of the Republic of Buryatia.
The Regional Development Fund of the Republic of Buryatia is an organization authorized by
the Government of the Republic of Buryatia in the field of application of government investment
policy seeking to attract investments to the economy of the Republic, create favorable environment
for investors and business, and reduce the administrative barriers
126
127. FIVE DEVELOPMENT PRIORITY AREAS
Mineral resources sector
Agro-industrial sector
Tourism and Recreation
Sector Transport and logistics
sector
Action plan for development and promotion of the investment
project:
1. Development of investment proposal based on forming of
investment sites and developing a business plan of the project;
2. Promotionoftheinvestmentproject. Targeting of potential
investors. Organization and participation in investment projects
presentations;
3. Signing the agreement of understanding to implement an
investment project between the Government of the Republic
of Buryatia and the Investor;
4. Individual support of the investment project based on one stop
principle (23 stages).
Industry and residential
construction
Ulan-Ude
Ulaanbaatar
Peking
Moscow
127
128. REGIONAL DEVELOPMENT FUND REPUBLIC BURYATIYA
Ulan-Ude, st. Babushkena, 14 а, off. 35-38
tell. (3012) 45-50-46, 45-54-85;
www.invest-buryatia.ru
Е-mail: fondreg@gmail.com