http://floridawaterdaily.com. Florida Power and Light requested permission to withdraw water from the L-31E canal to augment the cooling water ponds at the Turkey Point Nuclear Power Plant. The request has been opposed by the National Park Service because the L-31E canal provides fresh water to Biscayne Bay National Park. South Florida Water Management District Staff present the issue to the Governing Board at the 4/9/2015 meeting.
Turkey Point Nuclear Power Plant Water Withdrawals from L-31E Canal
1. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
Item 33
Short-Term Water Withdrawals by FPL
April 9, 2015
Sharon M. Trost, P.G., AICP
Director, Regulation Division
South Florida Water Management District
2. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
FPL Cooling Canal
● FPL Cooling Canal System (CCS)
constructed in early ‘70s
● No surface water inflows or
outflows into CCS to maintain
water levels, temperature, or
salinity
● Recharge from direct rainfall and
saline groundwater seepage
● Average annual rainfall at S-20F
is ≈ 50 inches
● 2014 rainfall: ≈ 41 inches
3. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
FPL Operational Issues
● CCS temperatures usually rise beginning
in late spring
● Thermal compliance temperature is 104°F
● Increasing evaporation increases salinity
● SFWMD issued an Emergency Order:
August 2014 through October 2014
● Water inflows resulted in temperature
and salinity reductions
● 14 mgd from Floridan Aquifer intended as
long-term temperature solution
● Awaiting resolution of objections to use
of the Floridan Aquifer
● As a temporary, interim step, FPL seeks
an authorization to provide water to cool
the CCS and reduce salinity
4. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
Nearshore Central Biscayne Bay Reservation
● Effective July 2013
● Reservation based on fish and
wildlife protection criteria
contained in the BBCW CERP PIR
● BBCW phase I infrastructure
● Redistributes freshwater runoff
from the existing canal discharges
● Provides a more natural and
historical overland flow pattern
through existing systems
● Reservation distributed across
several coastal reaches; southern
reach of L-31E is 504 acre-ft/day
5. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
Short-Term Withdrawal Authorization
● FPL is prohibited from withdrawing and
using water from the L-31E Canal system
that is reserved for fish and wildlife for
the Nearshore Central Biscayne Bay.
● The only water available for the purpose
of this Order is that water which is in
excess of the flows reserved for
protection of fish and wildlife.
6. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
● Step 1: Calendar Constraint
● Seasonal withdrawals only: June 1 to November 30
● Step 2: Excess from the L-31E Canal System
● Part 1 – All pumps are off at the start of each day
● Part 2 – Remain off until the sum of discharges from S-20F,
S20G, and S21A meets or exceeds 504 acre-feet
● Part 3 – Withdrawals authorized
● Part 4 – Withdrawals terminated at 11:59 PM
2-Step Criteria for Availability
7. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
Sum of flow from:
• S-20F
• S20G
• S21A
Must exceed 254 cfs
(504 acre-ft/day)
Step 2: Water Availability Criteria
8. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
● Volume of water pumped from the C-103
Basin into L-31E must exceed the daily
volume pumped from the L-31E into the CCS
● North Pumps shall always be started at least
five minutes before the pumps withdrawing
water from the L-31E and discharging into the
CCS (South Pumps)
● South Pumps shall cease first and the North
Pumps shall cease within 5 minutes
Preventing Over-Withdrawal
9. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
S-20F
L-31E Canal
South
Pumps
North
Pumps
C-103
Florida City Canal
North Canal
10. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
● Water Availability Determination
● Flows available on District web page
● FPL responsible for accessing District’s data and performing
calculations
● Monitoring and Reporting
● FPL shall generate detailed reports including:
● Water availability determination for each day
● Pump usage and timing
● The amount of water diverted to the CCS
● Temperature and salinity data
● Weekly summary reports
Order Requirements
11. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
● Special Pump Station Criteria
● The District may require pumping to terminate at any time within
two hours of receipt of any oral or written request
● FPL shall coordinate the pumping at both stations
● Storm/hurricane contingency plan
● Pump Requirements
● Pumps shall be staffed on a 24-hour basis
● Pump discharge rating curves prior to operation
● Calibrated totaling flow meters
Order Requirements
12. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C TS O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
Staff recommends the Governing Board
enter an Order authorizing short-term
water withdrawals by Florida Power and
Light from the L-31E Canal System;
Miami-Dade County, Florida.
Recommendation
12
13. S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T
Thank You