Your SlideShare is downloading. ×
0
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Ppt eric antoons
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
77
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. 6 Agenda • Introductie Parkwind • Belgische off shore wind sector : stand van zaken en evolutie • Wat komt er allemaal bij kijken? • Opportuniteiten . • Uitdagingen op de korte termijn.
  • 2. Introductie Parkwind • Parkwind ontwikkelt , bouwt en exploiteert offshore windenergie projecten, in België maar bestudeert ook projecten in het buitenland. • Aandeelhouders : • Belangrijkste participaties tot nu toe : • Volgende projecten : – Belwind fase 2 ( 2015-2017) – Northwester 2 7
  • 3. Offshore wind België • C-Power (325,2 MW): operational • Belwind (330 MW): phase 1 (165 MW) operational • Northwind (216 MW): under construction • Norther (350 /450 MW): under development(Stevin) • Rentel (288 MW) : under development(Stevin) • Seastar (246 MW) : under development(Stevin) • Northwester 2 (224 MW) : under development (Stevin) • Mermaid (266 MW) : under development(Stevin) 8
  • 4. 9 Offshore Wind: Europe 2020
  • 5. 10 Capacity: 165 MW Distance to shore: 46 km Sea Depth: 18 – 31 m Area: 17 km² Export Cable: 54 km - 150 kV Turbine type: 55 Vestas V90 Turbine capacity: 3MW Financial Close: 24 July 2009 Belwind I
  • 6. 11 Output: 216 MW Distance to shore: 37 km Sea Depth: 16 – 29 m Area: 14,5 km² Export Cable: 43 km - 220 kV Turbine type: 72 Vestas V112 Turbine capacity: 3MW Financial Close: 27 June 2012 Northwind
  • 7. Situatie Northwind 20/03/2014 12
  • 8. 1. Monopile 2. Transition piece 3. Windturbine Windfarm componenten Connection to transmission grid 1 2 3 4 5 6 4. Infield cables 5. OHVS (transformation station) 6. Export cable
  • 9. Funderingen: Stalen monopiles • : 5 m • Lengte: 50 to 72m • Gewicht: 350 tot 500 ton Constructie Insertion plug Transport to location
  • 10. Funderingen In zeebodem gehamerd tot 35m in de bodem Constructie Raising monopile Hammered into the seabed
  • 11. Installatie fundering
  • 12. WTG installatie
  • 13. OHVS installatie
  • 14. Constructie 19 Infield cables Interconnectie turbines en OHVS 33kV
  • 15. Export & Land kabel Constructie fase
  • 16. 21 Partners Legal Financial Insurance Legal Legal Legal
  • 17. Exploitatiefase 22
  • 18. Exploitatiefase • Windturbines : 15 jaar overeenkomst met de OEM van de WTG’s – “all in” • BOP : diverse kleinere contracten : surveys , paint ,”civil” • Elektrisch : een onderhoudscontract met een lokale contractor. 23
  • 19. Research partners Ontwikkeling van een specifiek monitoring programma voor de funderingen en de wind turbine aandrijving in samenwerking met universiteiten , research instituten en Original Equipment Manufacturers. 24 - Vestas - Zensor (spin off university of Brussels) - University of Leuven KUL - Mechanical department - University of Brussels VUB - Acoustics and Vibrations Research group - Electrochemical and surface engineering - Research center WTCB - Department geotechnical and execution techniques - Research center Sirris - OWI-lab - Research center Bruwind - In-CT (spin off university of Gent) - 3E
  • 20. Uitdagingen voor de offshore sector • Twee elementen zijn bepalend voor de verdere ontwikkeling van de off shore windenergie in België – De beslissing van de regering omtrent het ondersteuningsmechanisme voor de toekomstige offshore parken. – De realisatie van een hoogspanningsverbinding tussen Zeebrugge en het Belgische 380kV – net (Stevin project). 25
  • 21. Waar ons te vinden ? • Hoofdzetel : – Leuven , Vital Decosterstraat 44 • Exploitatiezetel : – Oostende , Esplanadelaan 10b. 26 Bedankt voor uw aandacht!

×