Your SlideShare is downloading. ×
0
City of Rochester, Main Street Makeover
City of Rochester, Main Street Makeover
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

City of Rochester, Main Street Makeover

190

Published on

A timeline of the reconstruction of downtown Main Street between the Clinton River Bridge and Paint Creek Bridge.

A timeline of the reconstruction of downtown Main Street between the Clinton River Bridge and Paint Creek Bridge.

Published in: Design
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
190
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. P R O J E C T T E A M City of Rochester MAKEOVER AIN STREET Owners Michigan Department of TransportationCity of Rochester Rochester DDA Construction Engineer Fishbeck, Thompson, Carr & Huber Inc. Engineers | Architects | Scientists | Constructors What Providing services for over 50 years. Contractor Design Engineers wasAngelo Iafrate Construction Co. NCI Engineering Hubbell Roth & Clark Inc. done? • Reconstruction of downtown Main StreetQuestions? between the Clinton River Bridge and Paint Creek Bridge.Jaymes Vettraino Tom Gray II, P.E. • Water main replacement and utility upgrades.City Manager Vice President/Senior Civil Engineer • Traffic signal and sign upgrades.jvettraino@rochestermi.org tlgray@ftch.com • Streetscape and lighting improvements.248.609.0606 248.324.2133
  • 2. M-150 11.21 RECONSTRUCTION PROJECT OPEN TO TRAFFIC • Full closure opened to traffic. • One lane of traffic in each direction and a center Full closure starts turn lane is opened to traffic between Second • Single lane closures begin Exposed aggregate between Second Street Street and University Drive. along NB and SB M-150. sidewalk complete. • Pavement removal begins and University Drive. Concrete paving begins. Water main complete. • Sidewalk removal begins. • Pedestrian traffic is maintained 07.09 08.02 10.15 04.24 06.01 along sidewalk adjacent to building using temporary fence. 07.17 09.27 11.17 05.15 06.04 04.22 Placement of concrete pavement is completed. Exposed aggregate sidewalk RT construction begins.STA Water main installation begins. Human remains discovered in front of Home Bakery at the NE corner of Third Street and Main Street. Human remains discovered in front of bridal shop at the SE corner of Third Street and Main Street.

×