    Prince2 2005 Vs Prince2 2009 - Presentation Transcript

      • PRINCE2 (2005)
      • Vs
      • PRINCE2 (2009)
      • By Mark Percy
      • Firebrand Training
      • PRINCE2 Lead Instructor
      PRINCE2 TM is a Trade Mark of the Office of Government Commerce
    1. Agenda
      • History of PRINCE2
      • Why has it changed?
      • Fundamental differences between 2005 & 2009
      • What the changes mean for students
      • Timescales for changeover
      • Any questions?
    2. History of PRINCE2
      • PRINCE used in UK Public Sector since 1989
      • Became PRINCE2 in 1996
      • Nowadays used in Public & Private Sectors both in UK and abroad
      • Subject to periodic updates by the OGC to keep the methodology in line with Industry Requirements
    3. Why has it changed?
      • The 2005 manual was considered too bulky
      • Some of the terminology was confusing
      • There was a need to acknowledge new business practices/technologies
      • The methodology needed to integrate with other OGC Products
      • More consideration was needed for the soft aspects of project management
    4. Fundamental Differences between 2005 & 2009
      • Manual condensed from over 450 pages to 325 pages
        • Amount of repetition has been reduced
        • Sub-process numbers have been removed
        • There are now 2 manuals:
          • Managing Successful Projects
          • Directing Successful Projects
    5. Fundamental Differences between 2005 & 2009
      • Changes in Terminology
        • 8 Processes become 7
      • PRINCE2 2005
      • Starting Up a Project
      • Initiating a Project
      • Directing a Project
      • Controlling a Stage
      • Managing Product Delivery
      • Managing Stage Boundaries
      • Closing a Project
      • Planning
      • PRINCE2 2009
      • Starting Up a Project
      • Initiating a Project
      • Directing a Project
      • Controlling a Stage
      • Managing Product Delivery
      • Managing a Stage Boundary
      • Closing a Project
      • (Planning is now covered within other processes)
    6. Fundamental Differences between 2005 & 2009
      • Changes in Terminology
        • 8 Components become 7 Themes
      • PRINCE2 2005
      • Business Case
      • Organisation
      • Plans
      • Controls
      • Quality
      • Risk
      • Config Mgmt
      • Change Control
      • PRINCE2 2009
      • Business Case
      • Organization
      • Plans
      • Progress
      • Quality
      • Risk
      • Change (including Config Mgmt)
    7. Fundamental Differences between 2005 & 2009
      • Changes in Terminology
        • Techniques now detailed within applicable Themes
      • PRINCE2 2005
      • Product Based Planning
      • Quality Reviews
      • Change Control
      • PRINCE2 2009
      • Detailed within Plans Theme
      • Detailed within Quality Theme
      • Detailed within Control Theme
    8. Fundamental Differences between 2005 & 2009
      • Terminology aligns much better with the other products within the OGC suite
    9. Fundamental Differences between 2005 & 2009
      • New Business Practices/Technologies are acknowledged
        • Documents have been given clearer/more modern names
        • More examples in the manual of hi-tech projects
        • Some subject areas have been made less prescriptive and more flexible
        • References to ISO have been removed
    10. Fundamental Differences between 2005 & 2009
      • The softer aspects of Project Management are better catered for
        • The “Tailoring” section gives advice on adapting to different project cultures
    11. What the Changes Mean for Students
      • The Exam format has changed as well as the manual
      • The 2005 qualification is still valid
        • Most advertised vacancies don’t specify the version of PRINCE2
        • We teach the subjects that the 2005 manual doesn’t do well “properly” on the course anyway!
        • A 2005 student will easily get to grips with 2009 in a working environment
        • No upgrade is needed to the 2009 methodology – 2005 students will need to sit a 1 hour “Refresh” exam in 5 years
    12. Timescales for changeover
      • First 2009 Course to Run Week Commencing 5 th October
      • Current Plan to then run 2009 format on Alternate Courses
        • Will allow bedding-in of new exam format
        • Some students still requesting 2005
        • Returning 2005 students should attend 2005 course
        • Pre-Course Reading for 2009 version available now
    13. Firebrand Training Prince2 Courses
      • 5 Day Foundation & Practitioner Prince2 2005 Course
      • 5 Day Foundation & Practitioner Prince2 2009 Course
    14. Any Questions?
    SlideShare Zeitgeist 2009

    + Firebrand TrainingFirebrand Training Nominate

    custom

    631 views, 1 favs, 0 embeds more stats

    Learn the differences between the new Prince2 2009 more

    More info about this document

    CC Attribution License

    Go to text version

    • Total Views 631
      • 631 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 1
    • Downloads 37
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories