• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
newmont mining 3_North_American_Overview_Final
 

newmont mining 3_North_American_Overview_Final

on

  • 752 views

 

Statistics

Views

Total Views
752
Views on SlideShare
741
Embed Views
11

Actions

Likes
0
Downloads
0
Comments
0

1 Embed 11

http://www.slideshare.net 11

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    newmont mining 3_North_American_Overview_Final newmont mining 3_North_American_Overview_Final Presentation Transcript

    • North America Overview Brant Hinze, Vice President, North American Operations 1
    • Nevada Overview February 8, 2008 North America Overview 2
    • 2007 Sales by Process Two mills produce 60% of Nevada sales Carlin Mill 6 Roaster LTree Leach: 1% Twin Ca rl Leach 3% in Ca NA rli n Mi L: 5% : 5% 2% da SA :3 s: ill 6 4% L: M LTre e Au to: 4 % Juniper: 5% % ke: 2 nsta e Que : 3% LTFoat l : 0% Twin Creeks Sage Autoclave ill 5 % M :8 ix en ho Sage P : 28% February 8, 2008 North America Overview 3
    • 2007 Sales by Process Type Refractory Mills Grind + Oxidize + Leach Chemistry blending 4% :1 ch ea Flotation Mills LTree Le ach: 1% L T wi n Ox Ca rl i n Leach 3% Grind + Float Concentrate + Leach Tails 13% Ca NA rli n Mi L: 5% : 5% % da SA : 32 ills: s: Phoenix: Concentrates Smelter ill 6 L: 4% M LTre e Au Ox M to: 4% Mill 5: Concentrates Mill 6 and Sage Juniper: 5% % % ke: 2 0 nsta s: 6 Quee Oxide Mills % Toll: 2 % LTFoa: l t 5: 3 0% Mill Mill % :8 Flo ix en Grind + Leach at rac ho Sa g e P M Ref ills : 28% Oxide Leach :1 1% Leach directly on pads February 8, 2008 North America Overview 4
    • 2007 Sales by Process by Mine Twin Creeks Lone Tree Leeville/Carlin East Carlin NA Surf Carlin SA Surf 4% Chukar 1 h: ac Le LTree Le ach: 1% T wi n Midas Ox Ca Carlin SA Surf rl i n Leach 3% Twin Creeks 13% Ca NA rli n Mi Lone Tree L: 5% : 5% % da SA : 32 ills: s: ill 6 4% L: M LTre e Au Ox M to: 4% Twin Creeks Carlin NA Surf Juniper: 5% % : 2% 0 take eens s: 6 Qu % Toll: 2 % LTFoa: l t 5: 3 0% Carlin NA Surf Mill Mill % :8 Flo ix en Mill 5 Cons at rac ho Sa g e Carlin SA Surf P M LT Float Cons Ref ills : 28% :1 1% Phoenix Deep Post LT Float Cons TRJV Equity Mill 5 Cons Twin Creeks February 8, 2008 North America Overview 5
    • Regional Alignment with Strategic Foundation Operational Execution: Executed against mine plans ex-Phoenix Experienced employees and supply chain management Continued employee development and training programs Project Execution: Power plant completion Phoenix optimization and crusher completion Exploration and Growth: Maintain reserves with near-mine exploration Nevada land position Leverage, Scope and Scale: Complex infrastructure and processing facilities Continuous Improvement February 8, 2008 North America Overview 6
    • Continuous Improvement Example - Reduced LTAFR & TRFR Nevada Safety Rate Improvement Trends Accidents per year per 100 people AIFR - All Injuries 6 TRFR - Total Reportable Injuries 4.8 LTAFR - Lost Time Accidents 5 4 3.3 3 2.2 1.8 2 0.61 1 0.18 0.23 0 2005 2006 2007 February 8, 2008 North America Overview 7
    • Continuous Improvement Example - Mill Tonnage Increases Mill Tonnage Improvements 16,000 14,000 12,000 Mill Tons/day 10,000 8,000 6,000 4,000 2,000 - 96 97 98 99 00 01 02 03 04 05 06 07 n- n- n- n- n- n- n- n- n- n- n- n- Ja Ja Ja Ja Ja Ja Ja Ja Ja Ja Ja Ja Mill 6 Sage Mill 5 (Float Configuration) February 8, 2008 North America Overview 8
    • Continuous Improvement Example - Phoenix Drill & Blast Before After February 8, 2008 North America Overview 9
    • 2008 Outlook Summary Q4 YTD Outlook 2007 2007 2008 Equity gold sales (000 ozs) 666 2,341 2,275 – 2,400 Costs applicable to sales – Gold ($/oz) $385 $444 $400-$430 Consolidated capital expenditures ($m) $135 $588 $350-$400 Production Highlights Leeville at design production capacity (Q4: 3,281 tons/day) Midas operating near full capacity (Dec: 606 tons/day) Twin Creek leach pad expansion on line February 8, 2008 North America Overview 10
    • Phoenix Update Higher mill throughput (up 15%) Re-drilling nearly complete (93%) Crusher replacement (mid-2008) Copper leach project (Stage 3) SAG Mill Screen Phoenix Mill Tons 3,500 3,000 2,500 Mill tons (M) 2,000 1,500 1,000 500 0 1Q 2Q 3Q 4Q Floatation Froth Mill Tons February 8, 2008 North America Overview 11
    • Equity Gold Sales (000 ozs) 2,100 2,200 2,300 2,400 2,500 2,600 February 8, 2008 2,341 2007 Actual Twin Creeks Leach ~ 90 Midas ~ 70 ~ 30 Phoenix Mill Carlin South Area Leach ~ 30 Carlin North Area Leach ~5 2008 Equity Sales Phoenix Leaching ~ (5) Carlin Mill 5 ~ (5) North America Overview Twin Creeks Juniper Mill ~ (5) Lone Tree Leach ~ (5) Carlin Mill 6 Roaster ~ (10) Toll Milling ~ (30) Twin Creeks Sage Autoclave ~ (90) Lone Tree Autoclave ~ (90) 2,275 - 2,400 2008 Outlook 12
    • 2008 Costs Applicable to Sales $490 ~ $5 ~ ($5) ~ $10 ~ ($10) $470 ~ $10 ~ ($20) ~ $10 Consumables Diesel $450 $444 ~ ($30) Electricity Production Parts and Supplies $400 - $430 Labor CAS ($/oz) Other $430 Contract Services $410 $390 $370 $350 2007 Actual 2008 Outlook February 8, 2008 North America Overview 13
    • Beyond 2008 Maintain Reserve Base Large land position in Nevada (1.9 million acres) Underground reserve potential Open pit extensions at higher gold prices Phoenix copper leach La Herradura opportunities (JV with Peñoles) Focus on Cost Containment Power plant (~$25/ounce) Integration of larger trucks (added 25% pay load) People, training and supply chain February 8, 2008 North America Overview 14
    • Questions & Answers 15