Your SlideShare is downloading. ×
0
DG Installation Overview
DG Installation Overview
DG Installation Overview
DG Installation Overview
DG Installation Overview
DG Installation Overview
DG Installation Overview
DG Installation Overview
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

DG Installation Overview

95

Published on

Over view description of DG Installation for Plant room

Over view description of DG Installation for Plant room

Published in: Education, Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
95
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Flow of Activities for DG Installation
  • 2. Plant room • Plant room with clear height of 5.5 Meter clearance and the width as per the service consultant drawing. • The final location of HSD tank and the routing of fuel pipe as per the service consultant drawings. • The Cable / Buss bar routing as per the service consultants. • A clear space for the Crain to enter the plant room to shift the DG sets from trucks to the proper location. • The plant room to be fully equipped with the fire extinguishers as lot of insulating material and fire hard material will be used during the installation of complete system. • No water should stop in the Plant room and for that all the drainage system to be ready before DG set arrive to the plant room
  • 3. Civil works DG Installation DG Set plat form casting HSD Tank location Plant Room IPS White wash to the entire plant room
  • 4. DG set plat form IPS @ plant room
  • 5. HSD Tank Construction • As per the service consultants drawing the required height for the HSD tank …… Meters need to be constructed • Plat form for HSD tank • The concrete trench for fuel pipe and LT Cables • Concrete road for the fuel truck to come for refueling Concrete wall for HSD tank Plat form for HSD tank HSD tank
  • 6. Cooling Tower HSD tank Fuel Tank for DG

×