Your SlideShare is downloading. ×
0
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Great Passage Storm Sewer Improvement Project

146

Published on

Great Passage Storm Sewer Improvement Project

Great Passage Storm Sewer Improvement Project

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
146
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Great Passage Storm Sewer Improvement Project Contract Number 14125105 Project Number SD-000032-054 Task Order No. 29 Dranesville District March 26, 2014
  • 2. Great Passage Storm Sewer Improvement Project Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 3. Project Details Great Passage Storm Sewer Improvement Project Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch The Great Passage Storm Sewer Improvement project was substantially completed in May 6, 2014. This project was to provide drainage improvements and mitigate the flood potential in this community. It included installing a headwall structure, yard inlet, and a pedestrian bridge with handrails. Increasing overland relief was achieved by widening the swale, adding the pedestrian bridge and regrading the upstream area. The trash rack installed on the headwall structure will ensure that the maximum amount of flow will enter into the storm sewer system while keeping debris from entering the pipe system. The site was restored with native seeding and a landscaping scheme. Project Overview: • Cleared and grubbed for access to install the proposed structures • Excavated and installed storm structures (headwall, yard inlet and footbridge structure) • Excavated and graded the swale and adjacent areas to provide positive drainage • Installed handrails on both sides of the footbridge • Restored the adjacent driveway and road which provided construction access • Restored the site with native seeding, mulch, and trees Project Team: • Maintenance and Stormwater Management Division – Bill Schell • Maintenance and Stormwater Management Division - Qais Bashir • Utilities Design and Construction Division - Yousef Rayyan • Utilities Design and Construction Division- Keith Ferrell • Land Survey Branch - Gregory Harper
  • 4. Great Passage Storm Sewer Improvement Project Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Dranesville, VA, Tax Map #012-1 PROJECT SITE
  • 5. Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Great Passage Storm Sewer Improvement Project Pre-construction conditions of the site
  • 6. Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Great Passage Storm Sewer Improvement Project Pre-construction conditions of the site
  • 7. Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Great Passage Storm Sewer Improvement Project Installation of the headwall Highway Grade Trash Rack Headwall connecting to new 36” pipe
  • 8. Great Passage Storm Sewer Improvement Project Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Installation of yard inlet New Yard Inlet replacing the 36” End Section Existing 24” Pipe
  • 9. Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Great Passage Storm Sewer Improvement Project Installation of the yard inlet Before After
  • 10. Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch Great Passage Storm Sewer Improvement Project Installation of the footbridge and widening of swale Before After
  • 11. Additional Information For additional Information, please call www.fairfaxcounty.gov/dpwes Ben Boxer, Public Information Officer 703-324-5880, TTY 711 Ben. Ben Boxer, Public Information Officer 703-324-5880, TTY 711 Ben. Ben Boxer, Public Information Officer 703-324-5880, TTY 711 Ben.Boxer@fairfaxcounty.gov Irene Haske, Public Information Officer 703-324-5821, TTY 711 SWPDmail@fairfaxcounty.gov Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

×