Your SlideShare is downloading. ×
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive

159
views

Published on

Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive …

Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive

Sully District Project No. SD-000034


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
159
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Cider Barrel Circle & Orr Drive Storm Sewer Pipe Rehabilitation Sully District Project No. SD-000034 Cider Barrel Circle Orr Drive
  • 2. Project Details Description: The Maintenance and Stormwater Management Division completed a total of 48 linear feet of stormwater conveyance system pipe replacement for these two projects. The reinforced concrete pipe segments (RCP) were severely separated at the joints. To extend the service life and minimize further failures of the storm pipes and nearby ground surfaces, the separated segments were excavated and replaced with new reinforced concrete pipe segments. Project Overview: • Excavated and removed the separated 15” RCP. • Installed new RCP and connected with existing storm sewer system. • Backfilled and reestablished the disturbed areas, which included resurfacing the trail above the pipe and seeding common areas. DPWES Project Team: • Project Manager: Matthew Adams • Construction Manager: Qais Bashir • Project Inspector: Thomas Cameron
  • 3. Project Location Cider Barrel Circle & Orr Drive - Tax Map No. 56-3-11-C Cider Barrel Circle Pipe Rehabilitation Location Orr Drive Pipe Rehabilitation Location
  • 4. Pre-Construction Conditions Large Separated Joint Cider Barrel Circle Large Separated Joint Orr Drive
  • 5. Construction: Work included excavating and replacing the separated segments. Separated Joint
  • 6. For additional Information, please call Irene Haske, Public Information Officer 703-324-5821, TTY 711 SWPDmail@fairfaxcounty.gov www.fairfaxcounty.gov/dpwes

×