Award winning ecoterrace.co.uk project by Axis Design Architects - an overview

Award winning ecoterrace.co.uk project by Axis Design Architects - an overview

Statistics

Views

Total Views
722
Views on SlideShare
721
Embed Views
1

Actions

Likes
1
Downloads
8
Comments
0

1 Embed 1

http://www.slideshare.net 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Ecoterrace Refurb Presentation   Axis Design Ecoterrace Refurb Presentation Axis Design Presentation Transcript

  •  
  •  
  • www.ecoterrace.co.uk The Energy Saving Refurbishment 2008
  • Demolitions? Emissions? diagram courtesy of Casey Cole – carbonlimited.org
    • 160,000 homes in Newcastle/Stoke
    • 90,000 in council tax band A
    • 50% byelaw terrace houses?
    • Approx. 45,000 terraces in area
    • Standard terrace house SAP: 20-30
    • Heating costs: £800-1200 per year
    • CO 2 : 102kg/m 2 per year
    • Approx 6.6 tonnes / year / house
  • The competition bid: a) generic solutions for the typical terrace house...
  • b) design for a specific property…
  • c) proposals for a wider context…
    • Carbon reduction:
    • EPC Band B / Ecohomes Excellent
    • 78 CO kg/m 2 /year reduction
    • 5.3 tonnes CO 2 reduction per year
    • Cash savings:
    • 24 CO 2 kg/m 2 /year new performance
    • Heating costs: approx £200 per year
    • £100 saving per month
  • Comfort improvements: A sustainable house is one that sells!
  •  
  •  
  • ground floor
    • Passive solar gains
    • Recycled plastic loft insulation – U-value: 0.20
    • Heavily insulated floors – U-value: 0.25
    • Kingspan drylined walls – U-value: 0.30
    • Isover sound reduction insulation
    existing new build
  • first floor
    • Nuaire Sunwarm solar panel hot water cylinder
    • Nuaire Sunwarm positive pressure ventilation
    • 100% low energy lights
    • High efficiency ‘Band A’ boiler
    • Tap flow regulators
    existing new build
  •  
  •  
  •  
  •  
  • 2 year post occupancy monitoring in collaboration with Hockerton Housing Project… science + lifestyle
  •  
  •  
  •  
  •  
  • Public open days: 18 th & 25 th April
  •  
    • Working in partnership:
    • Staffordshire Housing Association
    • Newcastle Borough Council
    • Regional Housing Board (RHE)
    • RENEW North Staffordshire
    • Housing Corporation
    • Axis Design Architects
    • Carbon Trust