Ethnic Cultural Center Expansion                Mural Preservation                           April 11, 2011UNIVERSITY OF W...
Update          •         BOLA Architects have completed their work and are                     finalizing their report   ...
Mural InventoryUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office                      April 11, 2011
Mural InventoryUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office                      April 11, 2011
Mural InventoryUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office                      April 11, 2011
Mural InventoryUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office                      April 11, 2011
Mural Locations in Existing BuildingUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office                   ...
Peeling Technique Tests    Peeled Drywall from Remodel Construction        Results on Remodel ConstructionUNIVERSITY OF WA...
Wall Removal InvestigationUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office                             ...
Technique Evaluation Matrix                                               Peeling       Wall Removal                      ...
Recommendations          •       All the murals in the building to be saved (24 total)          •       The murals should ...
Building Section                              • Red indicates potential mural locations                                 • ...
Potential View ‐ Central Stair Ground FloorUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office            ...
Potential View ‐ North End Second FloorUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office                ...
Potential View ‐ Stair Opening Second FloorUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office            ...
Potential View ‐ North End Third FloorUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office                 ...
Schedule   •       Separate Bid Packages:  April ‐ June 2011   •       Bid Mural Removal/Bldg.:  Demolition Package – June...
Steps Forward          •       Concurrence on approach          •       Group to help decide on location of murals within ...
Upcoming SlideShare
Loading in …5
×

2011 04 11 ECC CP Presentation - Murals

743 views
685 views

Published on

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
743
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

2011 04 11 ECC CP Presentation - Murals

  1. 1. Ethnic Cultural Center Expansion Mural Preservation April 11, 2011UNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office
  2. 2. Update • BOLA Architects have completed their work and are  finalizing their report • All the murals have been catalogued • The four main artists have been interviewed  • Representatives from the State Department of Archaeology and  Historic Preservation (DAHP) and the Washington Trust               for Historic Preservation have visited the site • Several methods of removal have been tested in further detail • Potential hazardous materials abatement procedures have been  reviewed and refined • The Capital Projects Office has better defined the costs and time  impact associated with preserving the muralsUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  3. 3. Mural InventoryUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  4. 4. Mural InventoryUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  5. 5. Mural InventoryUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  6. 6. Mural InventoryUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  7. 7. Mural Locations in Existing BuildingUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  8. 8. Peeling Technique Tests Peeled Drywall from Remodel Construction Results on Remodel ConstructionUNIVERSITY OF WASHINGTONFINANCE & FACILITIES Results on Original ConstructionCapital Projects Office April 11, 2011
  9. 9. Wall Removal InvestigationUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  10. 10. Technique Evaluation Matrix Peeling  Wall Removal  Technique Technique Damage Potential High Medium Duration of Mural Removal 7 months 1 ‐ 2 months Hazardous Materials Impact High Low ‐ Medium Reinstallation Medium Medium Cost $800 ‐ $900K  $500 ‐ $650KUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  11. 11. Recommendations • All the murals in the building to be saved (24 total) • The murals should be saved using wall removal method • Display the four main murals in the roof monitors of the  new building • Display the medium and smaller size murals in common  areas of the new building • The meeting rooms would be available for new student  art  • Delete reproduction of the murals in glass panels along  Brooklyn Avenue from the projectUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  12. 12. Building Section • Red indicates potential mural locations • Yellow indicates atrium openingsUNIVERSITY OF WASHINGTON • Dots are locations for the images that followFINANCE & FACILITIESCapital Projects Office April 11, 2011
  13. 13. Potential View ‐ Central Stair Ground FloorUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  14. 14. Potential View ‐ North End Second FloorUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  15. 15. Potential View ‐ Stair Opening Second FloorUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  16. 16. Potential View ‐ North End Third FloorUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  17. 17. Schedule • Separate Bid Packages:  April ‐ June 2011 • Bid Mural Removal/Bldg.:  Demolition Package – June 2011 • Mural Removal/Bldg. Demolition:  July ‐ September 2011 • Bid Main Construction Package:  July 2011 • Building Construction:  September 2011 ‐ December 2012 • Occupancy of New ECC:  January 2013 (Winter Quarter)UNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011
  18. 18. Steps Forward • Concurrence on approach • Group to help decide on location of murals within the  new building • We will review our findings with the State Department of  Archaeology and Historical Preservation (DAHP) and the  Washington State Arts CommissionUNIVERSITY OF WASHINGTONFINANCE & FACILITIESCapital Projects Office April 11, 2011

×