Csp today chile 2013 rev 01 CSP - Biomass Hybridization
Upcoming SlideShare
Loading in...5
×
 

Csp today chile 2013 rev 01 CSP - Biomass Hybridization

on

  • 315 views

Hybridization CSP - Biomass

Hybridization CSP - Biomass
LCOE : 120 - 130 $/MWe

Statistics

Views

Total Views
315
Views on SlideShare
315
Embed Views
0

Actions

Likes
0
Downloads
2
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Csp today chile 2013 rev 01 CSP - Biomass Hybridization Csp today chile 2013 rev 01 CSP - Biomass Hybridization Presentation Transcript

  • CSP – BIOMASS HYBRIDIZATIONCSP – BIOMASS HYBRIDIZATION
  • INGETEAM AROUND THE WORLD
  • INGETEAM IN AMERICA Ingeteam S.A. de C.V. Ave. Revolución, 643, Local 9 Colonia Jardín Español Monterrey N LColonia Jardín Español - Monterrey, N.L. 64820 - MÉXICO Tel.: (+52) 81 83 11 48 58ª northamerica@ingeteam.com Ingeteam Ltda. Estrada Duílio Beltramini, 6075 Ingeteam SpA Estrada Duílio Beltramini, 6075 Chácara São Bento CEP 13278-078 – Valinhos – São Paulo Tel.: (+55) 19 30 37 37 73 brazil@ingeteam.com Bandera 883, Piso 211 8340743 Santiago CHILE Tel. (+56) 2 2 672 33 92 chile@ingeteam.com brazil@ingeteam.comchile@ingeteam.com
  • REFERENCES
  • CSP MAIN REFERENCES Scope of Supply Operation Construction Planification Electrical Power • INGETEAM CSP EXPERIENCE EPC Power Block Power Plant Engineering Control System Supply 100 MW Owner Engineering 140 MW Solar Field Control System 150 MW y Supply 150 MW Electrical System Supply 100 MW Feasiblity Studies Conceptual Engineering 360 MW R&D F ibilt St diR&D Feasibilty Studies Conceptual Engineering 19 MW INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS
  • BIOMASS MAIN REFERENCES Scope of Supply Operation Construction Planification Electrical Power • INGETEAM BIOMASS EXPERIENCE EPC Power Plant Engineering Control System Supply 10 MW Basic design & Owner Engineering 32 MW Basic design 32 MW Electrical & Control equipment 27 MW q p Basic design and administrative project 58 MW INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS
  • SOLAR RESOURCE INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS
  • BIOMASS RESOURCE INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS
  • HYBRID POWER PLANT BIOMASS – CSP CONCEPTION RESOURCES USES SOLARSOLAR THERMAL ENERGY HYBRIDIZATION • HTF • STEAM STORAGE • DSG • STEAM CYCLE BIOMASS INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS
  • HYBRIDIZATION CONCEPT BIOMASSBIOMASS POWER BLOCK SOLAR INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS
  • HYBRIDIZATION CONCEPT CSPCSP • ANNUAL POWER PLANT FACTOR BIOMASSBIOMASS • ANNUAL POWER PLANT FACTOR HYBRIDIZATIONHYBRIDIZATION • ANNUAL POWER PLANT FACTOR • 25-40 % • CAPEX • 3 5 €/W • 89 % • CAPEX • 2 5 3 5 €/W • 50 - 80 % • CAPEX • 3 5 €/W• 3 - 5 €/W • 2,5 – 3,5 €/W • 3 - 5 €/W INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS
  • HYBRIDIZATION EXAMPLES DNI 2300 KWh/m2/year SOLAR RESOURCE ± 2300 kWh/m2/year SOLAR – BIOMASS BOILER: 70% - 30% SOLAR - BIOMASS PERCENTAGE: 41% - 59% • Annual Net Electrical Generation: 132,2 GweAnnual Net Electrical Generation: 132,2 Gwe • Turbine gross power: 35 MWe • Biomass consumption: 87,890 ton • LCOE: 123 $/MWh SOLAR – BIOMASS BOILER: 45% - 55% SOLAR – BIOMASS PERCENTAGE: 20% - 80% • Annual Net Electrical Generation: 146,6 Gwe • Turbine gross power: 26 MWe • Biomass consumption: 146,580 ton SOLAR – BIOMASS BOILER: 45% - 55% SOLAR BIOMASS PERCENTAGE 33% 67% • LCOE: 110 $/MWh SOLAR – BIOMASS PERCENTAGE: 33% - 67% • Annual Net Electrical Generation: 175 Gwe • Turbine gross power: 26 MWe • Biomass consumption: 122 385 ton INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS • Biomass consumption: 122,385 ton • LCOE: 123 $/MWh
  • HYBRIDIZATION EXAMPLES DNI 1950 KWh/m2/year SOLAR RESOURCE ± 1950 kWh/m2/year SOLAR – BIOMASS BOILER: 70% - 30% SOLAR – BIOMASS PERCENTAGE: 39% - 61% • Annual Net Electrical Generation: 128,42 GweAnnual Net Electrical Generation: 128,42 Gwe • Turbine gross power: 35 MWe • Biomass consumption: 89,540 ton • LCOE: 130 $/MWh SOLAR – BIOMASS BOILER: 45% - 55% SOLAR – BIOMASS PERCENTAGE: 17% - 83% • Annual Net Electrical Generation: 166,7 Gwe • Turbine gross power: 26 MWe • Biomass consumption: 150,700 ton • LCOE: 120 $/MWh SOLAR – BIOMASS BOILER: 45% - 55% SOLAR BIOMASS PERCENTAGE 30% 70%SOLAR – BIOMASS PERCENTAGE: 30% - 70% • Annual Net Electrical Generation: 173,8 Gwe • Turbine gross power: 26 MWe • Biomass consumption: 128 670 ton INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS • Biomass consumption: 128,670 ton • LCOE: 132 $/MWh
  • LEC or LCOE, LEVELISED COST OF ENERGYPLANTS Plant Type LCOE (USD/MWh) Conventional Coal 110 Conventional Combined Cycle 110 Advanced Nuclear 120 Hydro 100 Biomass 110Biomass 110 Wind 115 Solar PV 120 Geothermal 130 CSP - Geothermal 130 Conventional CSP 140 Micro CSP 200 INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS Source: EIA (Energy Information Administration), NREL
  • HYBRIDIZATION LCOE REDUCTION CSP + TES CSP NUCLEAR LCOE PV COAL GAS BIOMASS WIND HYDRO LOW POWER PLANT FACTOR HIGH POWER PLANT FACTOR RICITYCOST NUCLEAR PV CSP + TESWIND CSPELECTRICITY COST LCOE TRANSMISSION COST ELECTR NUCLEAR COAL GAS BIOMASSHYDRO INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS LOW POWER PLANT FACTOR HIGH POWER PLANT FACTOR
  • THANK YOU FOR YOUR ATTENTION Page.. negoitz.sanmiguel@ingeteam.com Ingeteam Power Plants - Productos y Soluciones Pag. 16Junio 2011