Scrum Methodology At Msme
 

Scrum Methodology At Msme

on

  • 3,262 views

 

Statistics

Views

Total Views
3,262
Views on SlideShare
3,253
Embed Views
9

Actions

Likes
1
Downloads
98
Comments
0

2 Embeds 9

http://www.linkedin.com 5
http://www.slideshare.net 4

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Scrum Methodology At Msme Scrum Methodology At Msme Presentation Transcript

    • SCRUM Overview and step by step guide to Agile Development at Micro, Small & Medium Enterprises Workshop , Chennai - Syed Nazir Razik
    • About : Managing Partner at Fuente Systems Inc Co Founder of The Knowledge Foundation and powering up events like PROTO, Barcamp Chennai, Blogcamp , MoMo Chennai, SearchCamp, WikiCamp so on Serial Entrepreneur and been involved with many organizations like Mecosoft, Numeric Fuente, Kondagan, Fortuna Tech in creating value. Technology Adviser for some organizations like Shamail IT, Fashion Media abroad NiXi Fellow on Internet Governance creating awareness on issues like Intellectual Property rights. ISOC Chennai Chapter campion on Online Child Safety. PMP – Project management Professional since 2005 CSM – Scrum practitioner since 2007
    • The Basics of Scrum S c rum D a ily S c rum M a s ter M eeting 4-W eek S print R eview P ro duc t O w ner T he T ea m 11 Commitment 22 33 44 P o tentia lly 5 No Changes S hippa ble 6 7 P ro duc t 8 (in Duration or Deliverable) 9 10 11 12 13 R etro s pec tive
    • SCRUM – the SCRUM methodology coined by Ken Schwaber at 1996 OOPSLA ( http://jeffsutherland.com/oopsla/schwaber.html )
    • The Stakeholders of Scrum S c rum D a ily S c rum M a s ter M eeting 4-W eek S print R eview P ro duc t O w ner T he T ea m 1 Commitment 2 3 4 P o tentia lly 5 No Changes S hippa ble 6 7 P ro duc t 8 (in Duration or Deliverable) 9 10 11 12 13 R etros pec tive
    • The PRODUCT OWNER – Stakeholder #1 Responsible for the overall project vision and goals  Responsible for managing project ROI vs. risk  Responsible for taking all inputs into what the team  should produce, and turning it into a prioritized list (the Product Backlog) Participates actively in Sprint Planning and Sprint  Review meetings, and is available to team throughout the Sprint Determines release plan and communicates it to upper  management and the customer
    • The TEAM – Stakeholders # 2 T he T ea m 7 people, + or – 2  Has worked with as high as 15, as few as 3  Can be shared with other teams (but better when not)  Can change between Sprints (but better when they don’t)  Can be distributed (but better when colocated)  Cross-functional  Possesses all the skills necessary to produce an increment  of potentially shippable product Team takes on tasks based on skills, not just official “role”  Self-managing  Team manages itself to achieve the Sprint commitment 
    • The SCRUM Master – Stakeholder # 3 S c rum M a s ter The Scrum Master does everything in their power to help the team achieve success This includes: 1. Serving the team The ScrumMaster takes action to help remove impediments to the team’s effectiveness The ScrumMaster facilitates the team’s group interactions, to help the team achieve its full potential 2.Protecting the team The ScrumMaster protects the team from anything that threatens its effectiveness, such as outside interference or disruption The ScrumMaster will need to confront uncomfortable issues, both inside and outside the team 3.Guiding the team’s use of Scrum The ScrumMaster teaches Scrum to the team and organization The ScrumMaster ensures that all standard Scrum rules and practices are followed
    • What The SCRUM MASTER doesn't do ? S c rum M a s ter The ScrumMaster does not manage the team The ScrumMaster does not direct team-members The ScrumMaster does not assign tasks The ScrumMaster does not “drive the team” to hit its goals The ScrumMaster does not make decisions for the team The ScrumMaster does not overrule team-members The ScrumMaster does not direct product strategy, decide technical issues, etc.
    • Manager 's New Roles at Agile as SCRUM Master Decide task assignments among the Provide coaching and mentorship to team members and assign them team-members Keep track of whether team-members Surface issues to the team that they have done the tasks I’ve assigned to might overlook – scaling, performance, them security, etc. Make commitments on behalf of the Provide input on features, functionality, team about how much they can get and other aspects of what’s being done by X date produced Give direction to the team on how to do Do performance evaluations and provide the work, so they can meet the feedback to team-members commitment I made Convince team that the commitments Provide advice and input to the team on made on their behalf are attainable difficult technical issues that come up Monitor the team's progress, to make Plan training for team, and do career- sure they stay on schedule, and aren't development and planning with team- having problems members Conduct weekly update and 1:1 Stay abreast of latest developments in meetings with team, to surface issues, the technology their team uses, industry and provide direction news, etc. Recruit, interview and hire new Plan and oversee budgets and financials, members of the team and think about tools, skills and other future needs Fire team-members who are consistently Help remove impediments that the team not able to perform is not able or well-placed to resolve themselves
    • The Basics of Scrum S c rum D a ily S c rum M a s ter M eeting 4-W eek S print R eview P ro duc t O w ner T he T ea m 1 Commitment 2 3 4 P o tentia lly 5 No Changes S hippa ble 6 7 P ro duc t 8 (in Duration or Deliverable) 9 10 11 12 13 R etros pec tive Product Backlog
    • Product Backlog Product Owner lists items in descending order of priority (highest priority item is listed first, next-highest is second, etc.) Size estimates are rough estimates (can either be arbitrary “points”, or “ideal days”)
    • Product Backlog List of everything that could ever be of value to  the business for the team to produce Ranked in order of priority  Priority is a function of business value versus risk  Product Owner can make any changes they  want before the start of a Sprint Planning Meeting Items added, changed, removed, reordered  How much documentation is up to the team  and Product Owner to decide The farther down the list, the bigger and less  defined the items become ~2 Sprints worth are defined in detail 
    • Sprint Planning Meeting of Scrum S c rum D a ily S c rum M a s ter M eeting 4-W eek S print R eview P ro duc t O w ner T he T ea m 1 Commitment 2 3 4 P o tentia lly 5 No Changes S hippa ble 6 7 P ro duc t 8 (in Duration or Deliverable) 9 10 11 12 13 R etro s pec tive Product Backlog
    • Sprint Planning Meeting of Scrum Takes place before the start of every Sprint Team decides how much Product Backlog it will commit to complete by the end of the Sprint, and comes up with a plan and list of tasks for how to achieve it What’s a good commitment? Clearly understood by all Shared among the team Achievable without sacrificing quality Achievable without sacrificing sustainable pace Attended by Team, Product Owner, ScrumMaster, Stakeholders May require 1-2 hours for each week of Sprint duration 2 week Sprint = 2-4 hours, 4 week Sprint = 4-8 hours
    • Sprint Planning − Team understands the Sprint details of what the Product Pre-Planning Owner has prioritized on Meeting the Product Backlog − Team decides how much productive time it has available during the Sprint Sprint Planning − Team decides how many Product Backlog Meeting items it can commit to complete during the Sprint
    • Sprint Cycle: 2-Week Sprint Mon Tues Weds Thurs Fri 1 2 3 6 7 8 9 10 Sprint First Day 1 2 3 4 Planning of Sprint Meeting 13 14 15 16 17 Last Day 5 6 7 8 Sprint Review of Sprint & Retrospective 20 21 22 23 24 Sprint Planning Meeting 27 28 29 30 31
    • Available Time During Sprint Sprint Length 2 weeks Workdays During 8 days Sprint Team Member Avail Days Avail Hours Total Avail During Per Day Hrs in Sprint Sprint* Tracy 8 4 32 (8 * 4) Sanjay 7 5 35 (7 * 5) Phillip 8 3 24 (8 * 3) Jing 5 5 25 (5 * 5)
    • The Sprint Backlog Day of Sprint Backlog Task Owner Initial Est. 1 2 3 4 5 6 Item Enable all users Design business logic Sanjay 4 to place book in shopping cart Design user interface Jing 2 Implement back-end Tracy 2 code Implement front-end Tracy 6 code Complete Joe 8 documentation Unit testing Philip 4 Regression testing Philip 2 Upgrade Implement back-end Tracy 5 transaction code processing module Complete Joe 6 documentation Unit testing Philip 3 Regression testing Philip 3
    • The Sprint Sprint Length -4 weeks is standard in literature Many teams start with 2 week Sprints Factors in deciding your Sprint length Length of the release Amount of uncertainty How long priorities can stay unchanged Overhead of Sprint Planning and Review Team and Product Owner work together to decide Sprint length Can change during the project
    • Burndown Chart
    • The Sprint Review of Scrum S c rum D a ily S c rum M a s ter M eeting 4-W eek S print R eview P ro duc t O w ner T he T ea m 1 Commitment 2 3 4 P o tentia lly 5 No Changes S hippa ble 6 7 P ro duc t 8 (in Duration or Deliverable) 9 10 11 12 13 R etro s pec tive
    • The Sprint Review of Scrum Purpose of the Sprint Review is Demo what the team has built Generate feedback, which the Product Owner can incorporate in the Product Backlog Attended by Team, Product Owner, ScrumMaster, functional managers, and any other stakeholders A demo of what’s been built, not a presentation about what’s been built no Powerpoints allowed! Usually lasts 1-2 hours Followed by Sprint Retrospective
    • The Sprint Retrospective S c rum D a ily S c rum M a s ter M eeting 4-W eek S print R eview P ro duc t O w ner T he T ea m 1 Commitment 2 3 4 P o tentia lly 5 No Changes S hippa ble 6 7 P ro duc t 8 (in Duration or Deliverable) 9 10 11 12 13 R etro s pec tive
    • The Sprint Retrospective What is it? 1-2 hour meeting following each Sprint Demo Attended by Product Owner, Team, Scrum Master Usually a neutral person will be invited in to facilitate What’s working and what could work better Why does the Retrospective matter? Accelerates visibility Accelerates action to improve
    • Scrum Release Cycle 2 Common Approaches:  Multi-Sprint Release RELEASE SPRINT SPRINT SPRINT SPRINT SPRINT SPRINT Release Every Sprint RELEASE RELEASE RELEASE RELEASE RELEASE RELEASE SPRINT SPRINT SPRINT SPRINT SPRINT SPRINT
    • Scrum Disadvantages It’s hard!  Makes all dysfunction visible  − Scrum doesn’t fix anything: the team has to do it − Feels like things are worse at the beginning Bad products will be delivered sooner, and doomed  projects will fail faster High risk of turnover  − Some people will refuse to stay on a Scrum team − Some people will refuse to stay if Scrum is abandoned Partial adoption may be worse than none at all  If adoption fails, time will have been wasted, and  some people may leave
    • SCRUM – Fuente Flavour Source : http://wordpress.fuentesystems.com/?p=21 http://www.scrumalliance.org/resources