    1. Santa Maria Groundstation Validation and Support to Ariane-5 ATV OPS-G Forum Gerhard Billig 15 July 2008
    2. Agenda
      • Groundstation Validation
      • Infrastructure
      • Operational Setup and Preparations
      • Launch Operations
      • Outlook
      • - Upgrade of Perth groundstation
      • - Support to other Launcher families
    3. Groundstation Validation - Internally Tested Subsystems -
      • Tracking Tests with Caltower / Satellites
      • Dedicated Autotrack Tests
      • Monitoring and Control
      • TM reception and processing
    4. Autotrack Validation
      • Angular velocity of launcher (as seen from the groundstation) was much higher than that of satellites
      • Autotrack (dual frequency) was mandatory and primary mode of tracking
      • Aircraft was chosen as carrier for transmitters
      • Trajectory was down-scaled to meet aircraft constraints:
        • Height:  1200m
        • Speed:  200km/h
      • Placement of antennas and power connection was difficult
    5. Track of Ariane-5 over SMA
      • 1st pass:
        • Min Slant Range:  180km at elevation 48°
      • 2nd pass:
        • Min Slant Range: 1100 km at elevation 10°
    6. Actual Flightpath
    7.  
    8. Antenna positioning in aircraft
    9. Equipment Installation
    10.  
    11. SMA Infrastructure Development: Original View
    12. Finalised Installation at SMA
    13.  
    14.  
    15. Inauguration
    16. Operations Preparations and Launch Support
    17. Requirements for Launch Support from SMA
      • Tracking:
      • Dual-frequency Autotrack
        • DO-Programtrack
      • TM Reception and Storage
      • TM Extraction and Forward to CSG
      • Event Detection and Forward
      • Voice Communications
    18. Ariane-5 ATV: Mission Overview
    19. Ariane-5 ATV Tracking Network - Drivers -
      • Mission Duration: 1.5 Orbits (0.5 orbits for GTO)
      • Long Cruise Phases complicate accurate orbit prediction (Ariane inertial platform sensors)
      • Inclusion of Radars at Europe resolved predication accuracy problems
      • ISS was used as tracking target to exercise network-wide tracking campaigns
    20. Santa Maria Groundstation: Schedule for Operations
      • March 2007: Meeting with CNES/CSG
      • May 2007: Operational Training with CNES
      • October 2007: Operations KoM with CNES at SMA
              • Start of Operational Preparations
      • November 2007: Stand-Alone Tests
      • January 2008: Operational Qualification with CNES
      • February 2008: Mission Readiness Tests (internal)
      • 9th March 2008: Launch of Ariane-5 ATV
    21.  
    22.  
    23.  
    24.  
    25.  
    26.  
    27. Outlook: Upgrade of Perth groundstation
    28. Outlook: Support to other Launcher Families
      • Vega SSO launch trajectory
      • Vega Maiden Launch
      • Soyuz
    SlideShare Zeitgeist 2009

    + ESA/ESOC & OPS TeamESA/ESOC & OPS Team Nominate

    custom

    139 views, 0 favs, 0 embeds more stats

    This seminar will provide an overview of the new ES more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 139
      • 139 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 1
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories