PARTNERS IN COLLABORATION
Team covers Top Management to skilled worker
 
COLLABORATIVE PRODUCT DEVELOPMENT  TEAMS SHARE KNOWLEDGE
 
BIG BERTHA DETAILS EXPLOSIVE COMPARTMENT DP MECHANISM  /   SAFETY ARMING MECH ELECTRONICS MECHANISM  ACTIVATION
Linking of Drawings / Specs/ Test Procedures What Test M. htm Quality Test Compliance RFP Weight Analysis.doc Weight Analy...
I II III Flow diagram for manufacturing of big bertha IV VII Pneumatic  Test (0.5 day) Hydraulic  Test (1 day) Drop Test (...
THANK  YOU From madhukar_joshi@hotmail.com
Upcoming SlideShare
Loading in...5
×

080416 Presentation From Mj

649

Published on

Presentation made by Madhukar Joshi, one of the retiree experts from Mahindra & Mahindra Group during the eSangathan conference in Mumbai on April 17, 2008

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
649
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "080416 Presentation From Mj"

  1. 1. PARTNERS IN COLLABORATION
  2. 2. Team covers Top Management to skilled worker
  3. 4. COLLABORATIVE PRODUCT DEVELOPMENT TEAMS SHARE KNOWLEDGE
  4. 6. BIG BERTHA DETAILS EXPLOSIVE COMPARTMENT DP MECHANISM / SAFETY ARMING MECH ELECTRONICS MECHANISM ACTIVATION
  5. 7. Linking of Drawings / Specs/ Test Procedures What Test M. htm Quality Test Compliance RFP Weight Analysis.doc Weight Analysis Drawings / Solid Models Forged_Spec. htm SPECIFICATION
  6. 8. I II III Flow diagram for manufacturing of big bertha IV VII Pneumatic Test (0.5 day) Hydraulic Test (1 day) Drop Test (1 day) Tensile Test (0.5 day) VIII IX X XI 1 Day = 16 Hours ( 2 Shifts of 8 Hours each) Finishing Threading LATHE SAGAR OVEN Manpower RTM Process Machine Supervisor - 1 Labor - 1 Inspector - 1 Dome ( 2.5 days) Manpower Extractor MANDRIL Facing Both Ends LATHE SAGAR OVEN Filament Waving M/c CNC Process Machine Supervisor - 1 Labor - 2 Worker - 2 Inspector - 1 Single Large Shell (3.5 days) Manpower Supervisor - 1 Labor - 1 Worker - 1 Inspector - 1 Process Machine SIZING Finishing Threading LATHE SAGAR SHELL FRP - I SHELL FRP - II PARTING FRP SHELL I & II (0.5 days) ASSY TROLLY ASSY BIG BERTHA SHELL INTEGRATION LATHE SPM OVEN Manpower RTM Process Machine Supervisor - 1 Labor - 2 Worker - 1 Inspector - 1 ASSY FRP SHELL- I ( 0.25 days) FLANGE IV FLANGE III VI INTEGRATION LATHE SPM OVEN Manpower RTM Process Machine Supervisor - 1 Labor - 2 Worker - 1 Inspector - 1 ASSY SHELL- II (0.25days) ASSEMBLY ASSY TROLLY Manpower Process Machine Supervisor - 1 Labor - 2 Worker - 1 Inspector - 1 Big Bertha Shell Assembly (0.5 days) INTEGRATION LATHE SPM Manpower Process Machine Supervisor - 1 Labor - 2 Worker - 1 Inspector - 1 ASSY SHELL- I & CONNECTING FLANGE (0.5 days) Mechanical Tests Supervisor - 1 Labor - 2 Worker - 1 Inspector - 1 Manpower Painting (2 days) Supervisor - 1 Labor - 2 Worker - 1 Inspector - 1 Manpower Finishing cut Dia 533+0.04 - 0.00 LATHE SAGAR Manpower Process Machine Supervisor - 1 Labor - 1 Worker - 1 Inspector - 1 Big Bertha Assembly Finishing cut (0.5 days) NAD Ordnance Factory Wooden pack Wooden pack For filling ammunition Assembly Shell – I Assembly Shell - II For electrical modules Packing (1 day) Supervisor - 1 Labor - 2 Inspector - 1 Manpower ASSY CONNECTING FLANGE V
  7. 9. THANK YOU From madhukar_joshi@hotmail.com

×