Shinkansen Sushi Bar - Project Management Class Project
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Shinkansen Sushi Bar - Project Management Class Project

on

  • 2,801 views

 

Statistics

Views

Total Views
2,801
Views on SlideShare
2,788
Embed Views
13

Actions

Likes
0
Downloads
33
Comments
0

2 Embeds 13

http://www.slideee.com 8
http://www.slideshare.net 5

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Shinkansen Sushi Bar - Project Management Class Project Presentation Transcript

  • 1. Build Your Own Shinkansen Sushi Bar (a Project Planner demonstration) Class Project for Project Management (WCUMBA24) Erwin Sumargo (erwinsumargo@telkom.net)
  • 2. Shinkansen Sushi Bar
    • In the last few years there is a new style of sushi restaurant that is having a lot of success: Kaitenzushi.
    • Kaitenzushi are restaurants where conveyor belts are installed, the Taisho is in the middle of the conveyor belts and he puts on them the sushi he prepares, the conveyor belts are going around the restaurant and when you see something you like you simply take the plate that is going around when it is passing in front of your table, eat your sushi and keep the plates on your table.
    • The newest trend on the Kaitenzushi is the Shinkansen Sushi , which have another conveyor line for delivering special ordered sushi to the customer (order is transmitted via a computer-based control panel direct to the kitchen).
  • 3. General Sushi on a Rail
  • 4. The Cook (Taisho)
  • 5. Shinkansen Sushi (custom made sushi, riding on mini Shinkansen ‘bullet train’)
  • 6. The Class Project Tasks
    • Set up your own "Sushi Shinkansen" based on the video clip you got from class.
    • Set up the complete network.
    • Solve by using Smartworks Project Planner software.
  • 7. The Plan
  • 8. Plan Gantt
  • 9. Resource
  • 10. Gantt Chart
  • 11. Calendar – October 2008
  • 12. Calendar – November 2008
  • 13. Calendar – December 2008
  • 14. Calendar – January 2009
  • 15. Calendar – February 2009
  • 16. Calendar – March 2009
  • 17. And Finally, The Network Diagram
  • 18. Thank You…