Your SlideShare is downloading. ×
HV Testing
HV Testing
HV Testing
HV Testing
HV Testing
HV Testing
HV Testing
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

HV Testing

111

Published on

Electrical & Pumping Services Australia is a privately owned business with accumulated experience spanning over 20 years. Our comprehensive suite of services encompasses involvement in projects from …

Electrical & Pumping Services Australia is a privately owned business with accumulated experience spanning over 20 years. Our comprehensive suite of services encompasses involvement in projects from design, specification, construction, testing, commissioning and energisation to operations and maintenance. We have proven experience in deploying teams of skilled people to provide services and support throughout the life cycle of your project.

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
111
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Suite 1403 Level 14 Tower 2, 101 Grafton Street, Bondi Junction, NSW 2022 SPECIALISED ELECTRICAL SERVICES www.epsgroupaustralia.com.au E info@epsgroupaustralia.com.au P 02 9387 4220
  • 2. Suite 1403 Level 14 Tower 2, 101 Grafton Street, Bondi Junction, NSW 2022 EPS Group Australia provides specialised electrical services for low and high voltage equipment within utility and industry organisations. These services include all facets of testing and commissioning, maintenance services, project management and installation services. EPS Group Australia was established to provide these services as an integrated solution, allowing complex commissioning, maintenance or repair projects to be managed and completed by the one service provider, allowing the simplest solution for the end customer, or plant owner. Our Engineers and Technicians have extensive experience and expertise in all aspects of high voltage plant, protection and control systems, encompassing both commissioning of new systems as well as maintenance of existing systems. EPS Group Australia has been involved with numerous projects throughout Australia, spanning a wide range of project sites and electrical systems. These projects include installation and commissioning of complex protection and control schemes for high voltage electrical generation, transmission and distribution installations, investigative works for fault identification, and maintenance of existing installations to ensure compliance with relevant standards and codes. Our commissioning team has extensive experience and expertise in the installation, testing and commissioning of all facets of LV and HV electrical installations, including, but not limited to: • High Voltage Protection Schemes, including Generation, Transmission and Distribution systems as well as communication assisted protection schemes. • Supervisory Control and Data Acquisition (SCADA) System Commissioning • High Voltage Transformers, with experience in larger units up to 500MVA • Circuit Breakers (LV and HV) • CT’s and VT’s • High Voltage Switchboards • High Voltage Ring Main Units • High Voltage Earthing Systems www.epsgroupaustralia.com.au E info@epsgroupaustralia.com.au P 02 9387 4220
  • 3. Suite 1403 Level 14 Tower 2, 101 Grafton Street, Bondi Junction, NSW 2022 SERVICES AND EQUIPMENT HV Electrical Field Services Electrical Engineering Services Field services provided include all aspects of testing and EPS Group Australia are able to offer the following services, due to commissioning, including equipment used for: our highly skilled personnel, who are complemented by a range of state of the art test equipment. • Automated and manual single and three phase secondary This equipment is used to ensure accurate, effective and timely commissioning and maintenance of electrical power systems, injection, with GPS time synchronizing capability together with provision of accurate and professional test reporting, • Primary Current Injection (up to 800A AC) for all works undertaken. • Primary Voltage Injection (HV Withstand up to 120kV AC) • • • • • • • • HV/LV Circuit Breakers Current Transformers Voltage Transformers Power Transformers HV Cable Testing (Paper/Lead, XLPE) Insulation Quality Assessment (Tan Delta) Thermo-graphic imaging Earth Grid Performance Testing www.epsgroupaustralia.com.au • • • Project management of small and medium size projects HV and LV electrical protection system design verification and high level power protection system review of new and existing systems Condition assessment of plant that has been in service for a long period of time, to determine future service life and recommended maintenance plans. E info@epsgroupaustralia.com.au P 02 9387 4220
  • 4. Suite 1403 Level 14 Tower 2, 101 Grafton Street, Bondi Junction, NSW 2022 COMPLETIONS, COMMISSIONING & OPERATIONS EPS Group Australia has the capability to provide technical staff, proven project management systems and technical services for any project completions, commissioning and operate requirement. Our team will ensure a seamless transition from construction to commissioning and on to operations. www.epsgroupaustralia.com.au E info@epsgroupaustralia.com.au P 02 9387 4220
  • 5. Suite 1403 Level 14 Tower 2, 101 Grafton Street, Bondi Junction, NSW 2022 CURRENT & RECENT PROJECTS EPS Group Australia specialize in multi-disciplined verification, testing, commissioning and completions services on Oil & Gas, Mining and Metals, Utility and Infrastructure projects throughout Australia. EPS Group Australia has more than 30 years’ experience in successfully supporting and delivering major projects. In this time we have developed and refined the resource requirements needed for any project. GE: Solomon Hub Scope: 132KV Scheme Commissioning EPS Group Australia provided Commissioning Management, HV and LV Testing and all required commissioning support for the 132KV Scheme in the Solomon mining hub. Thiess: QCLNG Project Scope: Commissioning Specialised Resources EPS Group Australia is providing specialized engineering resources (junior and senior) and commissioning services to supplement the Thiess management and engineering team to drive project completion in a timely manner Wood Group PSN: Melbourne Water Scope: Commissioning Specialised Resources EPS Group Australia is providing the commissioning labour and project engineering on behalf of PSN Woodgroup for Melbourne Water’s ongoing maintenance and small capital works. FMG: Fire-tail OPF Scope: HV Operations EPS Group Australia provides HV operations support required for the operation of the FMG Solomon mine in the Pilbara. This includes the supervision, labour required and formulating and performance of switching instructions in a safe and timely manner. VISY: Amcor Botany B9 Project Scope: Specialised Resources EPS Group Australia provided a specialised resource on behalf of Visy Pulp and Paper for the instrumentation installation and commissioning on the Tumut VPP10 machine project. www.epsgroupaustralia.com.au E info@epsgroupaustralia.com.au P 02 9387 4220
  • 6. Suite 1403 Level 14 Tower 2, 101 Grafton Street, Bondi Junction, NSW 2022 Leighton Holdings: Mumbida Wind Farm Scope: Transformer Testing and HV/LV Commissioning EPS Group Australia provided all the electrical testing solutions for Leighton Holdings at Mumbida for the construction of the wind farm and associated electrical network. Metso: Amcor Botany B9 Project Scope: Specialised Resources EPS Australia provided a specialised resource on behalf of Metso for the instrumentation installation and commissioning on the Amcor Botany B9 project. GE: Kings Valley OPF Scope: Transformer Testing and HV/LV Commissioning EPS Group Australia provides all the electrical testing solutions for FMG associated with their mining construction in the Pilbara. Thiess: Victorian Desalination Plant Scope: 220kV Cable Installation EPS Group Australia provided construction management for the entire 220kV cable and 220kV substation install from Cranbourne to Wonthaggi. UGL: GTG Power Station Scope: HV Operations EPS Group Australia provide all the HV operations support required for the operation of a Gas Turbine Generated Power Station. This includes the supervision, labour required and formulating and performance of all switching instructions in a safe and timely manner. Thiess: Victorian Desalination Plant Scope: Energisation management for VDP EPS Group Australia provided commissioning management for the energisation and High Voltage operating of the 22kV network at the Victoria desalination plant. Thiess: Victorian Desalination Plant Scope: Completions Management EPS Group Australia provided completions management to allow the handover of all Electrical and Instrumentation work packages from construction to commissioning. www.epsgroupaustralia.com.au E info@epsgroupaustralia.com.au P 02 9387 4220
  • 7. Suite 1403 Level 14 Tower 2, 101 Grafton Street, Bondi Junction, NSW 2022 Sydney Suite 1403 Level 14 Tower 2, 101 Grafton St, Bondi Junction, NSW 2022 P 02 9387 4220 Melbourne Suite 22-24 Level 2, 326 Keilor Road, Niddrie, VIC, 3042 P 03 9938 3812 www.epsgroupaustralia.com.au E info@epsgroupaustralia.com.au P 02 9387 4220

×