Your SlideShare is downloading. ×
Hatem El Karnshawy . BSc, PMP, MASCE
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Hatem El Karnshawy . BSc, PMP, MASCE

252
views

Published on

RESUME

RESUME

Published in: Business, Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
252
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
13
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Hatem Abd Alla El Karnshawy Projects Manager BSc, PMP, C.Eng, CP, M.ASCEContact Information:……………………….Current Address: KuwaitTel: 0965- 97879753 (Kuwait) + 20103104100 (Egypt)E-mail: Hatem.Abdalla@windowslive.comWebsite: www.Eng-Hatem.netSummary :Well qualified Civil and Construction Engineer with extensive experience in Project Management, worked in variousconstruction projects. Following safety procedures .Extensive knowledge and skills in Contract Procurement, ContractManagement, Contract Administration, Claim Analysis, Dispute Resolution, Pre-contract Documentation, ContractualArrangement, Project Cost Control and Cost Plan, Price Analysis etc. gained in a wide range of Public and PrivateSector with Multi-disciplinary Contract environment. , Delays Analysis, Payments and reporting to client.Education:  Graduation: Bachelor of Civil Engineering, June 2002 Alexandria University, Egypt – Faculty of Engineering  Graduation Project: Waste Water Treatment - Grade: Excellent, (Awarded the Magia Prize)  Certified Project Management Professional – PMP - from Project Management Institute – USA  Current: Diploma in Arbitration 2010-2011 Cairo University, Egypt – Faculty of Law,  Pass Preliminary Certificate (Principles of law and contract theory, Commercial Law, Law of Civil and Commercial Procedure) , Arbitration Diploma from Cairo University, Egypt – Faculty of Law  CEUs Awarded= 4.35 Hours, PDUs Awarded= 43.5 Hours in Project Management (PMI course ID – P102 & P106) IT and Computer Capabilities:  Planning/Scheduling: Primavera Project Planner 6 Planning/Scheduling: (Project Management Client Server– Advanced Project and Resource Management) Primavera Project Planner 3.1 (48 Hrs), SureTrak Project Manager 3 , MS Project, Claim Digger  Contract Manager: Expedition Contract Manager  Microsoft Office Specialist (MOS) Level Expert  (ICDL) International Computer Driving License (ICDL)  Engineering: AutoCAD Structure Design: SAP 2000 Engineering: Design: Syndicate & Societies :  Full Member M.ASCE of American Society of Civil Engineers Membership ID No. 441499  Project Management Institute, PMI- USA, Membership PMI ID No. 1217305  Full Member of Kuwait Society of Engineers – Kuwait, Membership ID No. 17763  Full Member of Engineers Syndicate, Alexandria –Egypt, Membership ID No. 25/2290  Member of Federation of Arab Engineers Safety and Health:  CERTIFIED BY American Heart Association First Aid & CPR, AED – Accredit BY Occupational Safety and Health Administration (OSHA)-USA. (OSHA)-USA.  CERTIFIED BY Occupational Safety and Health administration (OSHA) -USA Construction– 30 Hr. Construction–  CERTIFIED BY Hyundai Heavy Industrial- Explosive Ordinance Disposal Awareness Session (EOD) and Health, Industrial- SAFETY and Environment Induction (HSEI) - Oil Field SafetyLanguage Ability:  Arabic (Mother Tongue)1/4 Pages www. Eng-Hatem.net Hatem Abd Alla El Karnshawy
  • 2.  English Fluent (Reading, Writing, Speaking), TOFEL course at Kuwait UniversityPersonal Information: Information: Nationality: EgyptianWork experience:State of Kuwait: NAKHEEL UNITED REAL ESTATE COMPANY, FROM 24 January 2010 UP TO DatePROFESSIONAL: Projects ManagerDesign Projects 1. CLIENT Kuwait Finance Bank - Local Real Estate Department – KuwaitPROJECT TITLE • Residential complexes Residential complex in Dasman project - 15,000 m2 Offices complex in Al Watya project – 20,000 m2 Residential complex in Jabriya 8,000 m2 Residential complex in Jabriya – 4,000 m2 Residential complex in Mahboula – 4,000 m2 • Commercial complexes Commercial complex in Dejeej – 5,000 m2 Commercial complex in Jleeb al Shukh – 4,000 m2 • Residential buildings Residential building in Bneed al kar – 1,000 m2 (9) Residential buildings in various area in Kuwait (6) Residential buildings in various area in Kuwait • Villas (11) Private Residential villa in Funatees • Others Permits for 21 building in various area in Kuwait 2. CLIENT Nakheel United Real Estate CompanyPROJECT TITLE • Towers Nakheel tower – Bahrain • Resorts Al Khiran Resort – 21 villa • Residential buildings Aknan residential building – SalmiyaRESPONSIBILITIES 1. Prepare contracts between Nakeel united and Kuwait financial bank for design and permits phase. 2. Following up the process of design and permits phase till singing contact with the owner contractor. 3. Review all the drawing and documents submitted by consultants. 4. Value engineering and cost saving for the projects. 5. Prepare terms of references TOR for the projects.Execution Projects 6. Prepare list of (Kuwait) AND AIRWAYS (new STANLEY (USA), JASSIM QABAZARD recommended consultant’s offices.Zealand)(JOINT VENTURE)CLIENT 7. Collect the financial and technical offers form consultant’s offices and open it with client. Nakheel United Real Estate CompanyPROJECT TITLE 8. KHIRAN RESORT submit recommendation to the client of all submissions from the consultant. AL Follow up, study andSCOPE OF WORK: 9. Study time extensions and Maintenance of 21 No. Furnished Villa And Landscape, Swimming Construction, Completion submitted by consultant and issue recommendations to client. 10. Study Payments submitted by consultant and issue recommendations to client. Pools…CONTRACT VALUE 11. Prepare Nakeel united companyPlus contract)my projects. ٨٠٠,٠٠٠ KD , ٣,200,000 $ ( Cost payments for ٨٠٠,RESPONSIBILITIES 12. Prepare projects closeout payments between Main contractor and subcontractor. 1- Review for approvals the contracts and documentations. 2- Follow up the progress at site. 3- Review for approvals the submitted payments and CPM program. 4- Meet supplies, obtain quotations, study the submissions and submit a recommendation to higher managements at the company. 5- Review for approvals the any quotations submitted by contactor m study the recommendation and finalize the subject. 6- Follow up the progress at site and direct the contractor to avoid delays and keep high level of safety. 7- Finalize architecture, swimming pools, drawing obtain approvals from higher management.2/4 Pages www. Eng-Hatem.net Hatem Abd Alla El Karnshawy
  • 3. FROM 2 MARCH 2008 TO 04 November 2009CLIENT Directorate General Of Civil Aviation –Planning & Control Department KUWAIT AIRSPACE SYSTEM PLAN (KASP) including subproject as: 1- Kuwait control & metrological center 2- Electrical Infrastructure &South Power Building Project 3- Communication System ProjectPROJECT TITLE 4- Air Traffic Management System Project 5- Surface Movement Radar Project 6- Airport Surveillance Radar Project 7- Instrument Landing System Project 8- Kuwait Airport Data Interchange Network Consultancy For The Project Management And Supervision Of Works Involved In TheSCOPE OF WORK: Implementation Of The Kuwait Airspace System Plan At Kuwait International AirportPOSITION: Senior Planning Engineer / Cost ControlCONTRACT VALUE 234,300,283 KD , 937,200,000 $RESPONSIBILITIES Creating, following up &updating KASP overall program & overall monthly report, tentative schedule for projects under tendering. Detecting delays in each subproject and to the overall, Review each subproject CPM program, analyses critical path for each subproject after/before updates, Cost loading, Resource loading, Method of Statement, Payments, Variations, Monthly Reports submitted by contractor. Monitor the progress at site. Attending & participate at progress meetings. Review and validate extension of time claims submitted by contractors. Analysis all delays in the KASP project and Subprojects. TOTAL MANAGEMENT CONSULTANCY PROJECT MANAGEMENT & FEASIBILITY STUDIES FROM 2 JULY 2007 UP TO 30 DECEMBER 2007 – Position Planning EngineerPROJECT TITLE : CRYSTAL TOWERSCOPE OF WORK: Construction, Completion and Maintenance of the CRYSTAL Tower -50flr + Podium +ParkingCONTRACT VALUE 17,400,000 KD , 70,000,000 $PROJECT TITLE : HOLYDAY INN HOTELSCOPE OF WORK: Renovation of the three Hotel towers – 4 TowersCONTRACT VALUE 2,500,000. KD , 10,000,000 $PROJECT TITLE : WARBA HEAD QUARTER TOWERSCOPE OF WORK: Construction, Completion and Maintenance of the WARBA TOWER-24flr + Podium +ParkingCONTRACT VALUE 2,199,947.892 KD , 8,800,000 $ THE NEW CENTRAL VEGETABLE & FRUIT MARKET IN SULAIBIYA -BID PACKAGE - MEPPROJECT TITLE : WORKSSCOPE OF WORK: Elect Mechanical WorksCONTRACT VALUE 8,441,551 KD , 34,000,000 $PROJECT TITLE : RESIDESIAL COMPLEX – FARAWANIASCOPE OF WORK: Construction and CompletionCONTRACT VALUE 1,718,376.5 KD , 6,500,000 $ Creating, following up &updating CPM program, Cost loading, Resource loading, Method of program,RESPONSIBILITIES Statement, prepare & submit monthly reports, Attending & participate at progress meetings. Monitor the progress at site. BADER AL MULLA & BROS. CO. FROM 25 DECEMBER 2006 UP TO 2 JULY 2007 Position Planning & Cost Control Engineer THE NEW CENTRAL VEGETABLE & FRUIT MARKET IN SULAIBIYA -BID PACKAGE - MEPPROJECT NAME: WORKSSCOPE OF WORK: Elect Mechanical WorksCONTRACT VALUE 8,441,551 KD , 34,000,000 $PROJECT TITLE : KUWAIT REGENCY HOTEL PALACE RE-DEVELOPMENTSCOPE OF WORK: Elect Mechanical WorksCONTRACT VALUE 2,900,979.913 KD , 12,000,000 $RESPONSIBILITIES Creating, following up &updating CPM program, Cost loading, Resource loading, Prepare & submit monthly reports, Attending & participate at progress meetings. Monitor the progress at site. Prepare & submit monthly payments, variations. MUSHRIF COMPANY FOR TRADING & CONSTRUCTION3/4 Pages www. Eng-Hatem.net Hatem Abd Alla El Karnshawy
  • 4. FROM 15 MAY 2004 UP TO 08 OCTOBER 2006 Planning Engineer- Site EngineerPROJECT TITLE : EXPORT CRUDE OIL FACILITIES-TANK NTF- KOC - HYUNDAI HEAVY INDUSTRIALSCOPE OF WORK: Foundations for crude Oil tanks –Earth WorkCONTRACT VALUE 5,250,000 KD , 21,000,000 $PROJECT TITLE : ZAKAT HOUSE HEADQUARTER PROJECT IN SOUTH SOURASCOPE OF WORK: ZAKAT HOUSE HEADQUARTER-BUILDINGCONTRACT VALUE 4,198,000 KD , 17,000,000 $ Creating, following up &updating CPM program, Prepare & submit monthly reports, Attending &RESPONSIBILITIES participate at progress meetings. Monitor the progress at site. Prepare & updating all types of logs, submittals and daily reports.PROJECT TITLE: AHMADY PROJECT – RA/34SCOPE OF WORK: ROADS {HIGHWAYS-RAMPS}-PRE-CAST YARD {GALLEYS- MANHOLES}PROFESSIONAL: Site EngineerCONTRACT VALUE 6,000,000 KD , 24,000,000 $PROJECT TITLE : NORTH DOHA PROJECT - RA/97SCOPE OF WORK: BOX CULVERTS –COFFER DAM- DEWATERINGCONTRACT VALUE 4,250,000 KD , 17,000,000 $ Prepare & submit daily reports, responsible for casting concrete at Pre-Cast yard, calculating requiredRESPONSIBILITIES steel and concrete. Assistant in prepare materials submittals, prepare & submit daily reports , responsible for casting concrete, calculate productivities to maintain the CPM dates, calculating required steel and concrete. Maintain & updating ISO requirement at site.Egypt:  Alexandria Petroleum Company  Mamdoh Hamza office-San Stefano Hotel Project  RAYD Company for Construction in Arab Academy for Science & Technology & Maritime Transport site (Building)4/4 Pages www. Eng-Hatem.net Hatem Abd Alla El Karnshawy