Your SlideShare is downloading. ×
Location Recce
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Location Recce

1,278

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,278
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
8
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Sample RecceACTIVITY IS THE ADDITIONAL LOCATION COMMENTS SUITABLE FOR PRODUCTION?Look around the location. Yes Back GardenTalk to people there, organise filming Yes Back gardenpermissions.Identify the equipment you need to use. Yes Digital Camera, costumes. PropsExamine and identify any potential health Yes Tripping/ falling overand safety issues something due to(Both people and equipment related issues uneven floor.e.g. crowd numbers being controlled; usingsafe cabling practices and video equipmentbeing set up in a sensible location that doesnot block access points or that damages theenvironment or frightens livestock)Check the position of the sun and lighting Yes Time of day,conditions. additional lightingLook for interesting shots and camera Yes I’ll use a low angle toangles. shot to make the artist seem more importantCheck the electricity supply. (For the Yes No electricity neededmajority of exterior locations you will be because it is outside.using battery power)Do a test sound/video recording and check Yes No potential noisefor potential noise problems (traffic noise problems.may be a problem; is a location on a mainflight path to an airport?)Confirm times and dates with technical Yes Saturday 13th 1pmcrew/actors or anybody you areinterviewing, etc.Arrange car parking, access, loading, Yes Nearby car parksecurity, where possible.Make sure everybody concerned with your Yes They know what theyvideo production knows what is happening and are doingwhat is expected of them when on location.

×