Your SlideShare is downloading. ×
A maturity model for urban eGovernance<br />eGovernance for Urban Infrastructure<br />eGovernments Foundation<br />eGovern...
Infrastructure life cycle<br />
Good Governance<br />Ingredients of Good Governance<br />Transparency & accountability<br />Participatory Governance<br />...
Participatory Budgeting<br />Community decides the how to allocate the municipal budget<br />Involvement of Ward committee...
Participatory Planning<br />Total Ward Budget: 85 Lakhs<br />Widening of MG Road – 10 lakh. <br />Constr. of SW Drains– 3 ...
Participatory Planning<br />Widening of M.G. Road – 10 lakh. Recommend?<br />YesNo<br />
Execution<br />eTendering and eProcurement<br />Contractor selection based on<br />Performance based feedback from citizen...
Contractor Performance: Acme Constructions<br />* Numbers in red denote Average for the ULB<br />
Real time Information on Execution<br />Work: Widening of MG Road<br />Contractor Name: Acme Constructions<br />%age compl...
Feedback<br />Grievance redressal system <br />Citizen feedback on projects executed<br />Monitoring Contractor/Work perfo...
Feedback on work<br />Complaint Type: _Potholes on Road______<br />Complaint Details: _After the rains, huge potholes have...
Key Message<br />Community Participation for <br />Assessing the needs<br />Allocation of Funds<br />Feedback on the Works...
Thank You<br />
Upcoming SlideShare
Loading in...5
×

Manu Srivastava

1,047

Published on

Presentation given by Manu Srivastava, eGovernments Foundation on August 3rd, 2011 at eWorld Forum (www.eworldforum.net) in the session Urban Governance and Infrastructure

Published in: Technology, Real Estate
1 Comment
0 Likes
Statistics
Notes
  • Manu Srivastava is a fool and this is not his work.
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

No Downloads
Views
Total Views
1,047
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
1
Likes
0
Embeds 0
No embeds

No notes for slide
  • Participatory Budgeting
  • Transcript of "Manu Srivastava"

    1. 1. A maturity model for urban eGovernance<br />eGovernance for Urban Infrastructure<br />eGovernments Foundation<br />eGovernments Foundation<br />
    2. 2. Infrastructure life cycle<br />
    3. 3. Good Governance<br />Ingredients of Good Governance<br />Transparency & accountability<br />Participatory Governance<br />Data Driven Decision making<br />Technology as an enabler in ensuring the above aspects for Quality Urban Infrastructure<br />
    4. 4. Participatory Budgeting<br />Community decides the how to allocate the municipal budget<br />Involvement of Ward committees<br />Open Collaboration platform<br />
    5. 5. Participatory Planning<br />Total Ward Budget: 85 Lakhs<br />Widening of MG Road – 10 lakh. <br />Constr. of SW Drains– 3 lakh. <br />Footpath constr. – 4 lakh. <br />
    6. 6. Participatory Planning<br />Widening of M.G. Road – 10 lakh. Recommend?<br />YesNo<br />
    7. 7. Execution<br />eTendering and eProcurement<br />Contractor selection based on<br />Performance based feedback from citizens<br />Contractor rating<br />Real time information on the work<br />Actual v/s Planned<br />Schedule<br />Cost<br />
    8. 8. Contractor Performance: Acme Constructions<br />* Numbers in red denote Average for the ULB<br />
    9. 9. Real time Information on Execution<br />Work: Widening of MG Road<br />Contractor Name: Acme Constructions<br />%age complete: 60%<br />Planned Date of Completion: August 20<br />Other Works by the same contractor<br />Cost Incurred: 7 Lakh<br />Budgeted Costs: 10 lakh<br />
    10. 10. Feedback<br />Grievance redressal system <br />Citizen feedback on projects executed<br />Monitoring Contractor/Work performance<br />
    11. 11. Feedback on work<br />Complaint Type: _Potholes on Road______<br />Complaint Details: _After the rains, huge potholes have appeared on the road causing accidents and traffic jams_<br />Feedback<br />List of other complaints on this Road<br />List of Works carried out on the Road<br />
    12. 12. Key Message<br />Community Participation for <br />Assessing the needs<br />Allocation of Funds<br />Feedback on the Works<br />Improves the Quality of Infrastructure<br />Positive virtuous cycle <br />Technology is a key enabler<br />Internet<br />Mobile<br />
    13. 13. Thank You<br />

    ×