10,000 kiloliter capacity_bdf_plant-1
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share

10,000 kiloliter capacity_bdf_plant-1

  • 443 views
Uploaded on

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
443
On Slideshare
443
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. CDM Consulting Co., Ltd. 10,000 kiloliter (㎘)/year BDF production plant preliminary cost estimate Plant Specifications 1. BDF Production capacity: 10,000 ㎘/year 30 ㎘/day(360 days operation, 24 hours continuous) 2. Feedstock: Jatropha oil 3. Plant components: Feedstock tank, BDF production tank/storage, methanol tank (electricity and water is provided on site) 4. BDF production Flow: Please refer to the diagram below BDF plant preliminary cost estimate BDF production facility Process Equipment/Specifications Quantity Estimate cost (in Japanese yen) Feedstock tank Feedstock receiving tank 30 ㎘ 2 20,000,000 1. Reaction Methanol tank 20 ㎘ 1 10,000,000 process No.1 decompressor 2 20,000,000 Reaction tank: with agitator 2 20,000,000 Tank capacity 3.0 m3 Catalyst mixing tank: with agitator 1 10,000,000 Tank capacity 0.75m3 Separator container 2. Refining Tank capacity: 2.9m3 15 75,000,000 process Glycerine tank Tank capacity: 15 ㎘ 1 10,000,000 Refining column (with exchange equipment as accessory) 4 8,000,000 Column capacity 0.2m3 2 80,000,000 Centrifuge (automatic blow) 1 10,000,000 No.2 decompressor 2 40,000,000 Product buffer tank mixing line as accessory) 3. Storage Product tank: process Tank capacity: 100 ㎘ 2基 30,000,000 4. Others Mount 20,000,000 Utility 40,000,000 Administration cost 100,000,000 (design, engineering, paperwork) Total 493,000,000
  • 2. CDM Consulting Co., Ltd. BDF production facility Total: 493,000,000 yen CDM Consulting Co., Ltd. BDF Production Flow *The quantity and dimension of equipment may change according to BDF production capacity