Energy Efficiency in Nepal's Cement Sector
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Energy Efficiency in Nepal's Cement Sector

on

  • 625 views

Based on a GIZ study in 200 Nepalese industry findings on the energy efficiency potentials and energy saving measures for cement sector in Nepal is presented.

Based on a GIZ study in 200 Nepalese industry findings on the energy efficiency potentials and energy saving measures for cement sector in Nepal is presented.

Statistics

Views

Total Views
625
Views on SlideShare
597
Embed Views
28

Actions

Likes
0
Downloads
4
Comments
0

2 Embeds 28

http://eec-fncci.org 26
http://www.eec-fncci.org 2

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Energy Efficiency in Nepal's Cement Sector Presentation Transcript

  • 1. Cement SectorEnergy Intensity 45% of manufacturing cost
  • 2. Cement Manufacturing – technologies• Limestone is the raw material used in the manufacture of cement. The thermal energy consumption average is about 760 kcal/kg of clinker. Based on the study of the latest cement plants, the target energy consumption for a new cement plant could beast below: Specific Electrical Energy consumption : 75 units/ton of OPC – 43 Specific Thermal Energy Consumption : 715 kCal/kg of clinker
  • 3. Area of savingMines and Crusher Raw mill grinding &Short-term storage• Increase operating capacity • Install variable louvre system for of primary & secondary roller mill crusher • Install high efficiency dynamic• Reduce idle run of crushers separator for roller mills and belts • Install belt and bucket elevator• Reduce idle operation of in place of pneumatic conveying dust collection equipment • Installation of efficient millLong-term intervals – diaphragm and liners • Install slip power recovery• Install bulk analyzer for system / VFD for raw mill fan / crushed limestone ESP fan
  • 4. Area of savingCompressors & Electrical System Compressed Air • Use energy efficient lighting System • Distribute load on transformer• Install screw compressors network in an optimum manner with VFD in place of old • Improve power factor compressors. – Individual compensation• Install compressed air traps – Group compensation for receivers – Centralized compensation• Optimise compressor • Replace over sized motors discharge pressure • Replace with energy efficient• Eliminate compressor air motors leakages by a vigorous maintenance programme • Use VFD for low / partial loads• Maintain compressed air filters in good condition