International Journal of Engineering Inventions
e-ISSN: 2278-7461, p-ISSN: 2319-6491
Volume 4, Issue 8 [January 2015] PP: 23-26
www.ijeijournal.com Page | 23
Challenges Regarding Management Practice Of Cement On
Construction Sites North-Eastern Nigeria
1
arinze N. A.;2
Dammo.M. N.; 2
Isa A.;2
Deborah, J. M.; 3
Aji. A.Band
2
G. B. YUSUF
1
Department of Building Engineering, Ramat Polytechnic Maiduguri, Nigeria
2
Department of Civil Engineering, Ramat Polytechnic Maiduguri, Nigeria
3
Department of Civil Engineering, Federal Polytechnic Damaturu, Nigeria
Abstract: Cement management is particularly problematicby selected contractors in Maiduguri.This paper is
written to fill a void created by the absence of proper cement management on construction sites. To managing a
productive cost efficient and site efficient cement management is very essential.Research showed that, 89%, of
the contractors manage and concentrate on cement operations on the site; 37.1% of the contractors employ
qualified stores operation officers; 71% of the contractors calculate the quantity of cement required before
purchasing; 27.7% of the contractors have poor mechanisms in place to engage cement suppliers; 78.9% of the
contractors experience delay in cement delivery; 90.6% of the contractors inspect cement on arrival to site;
78.9% of the contractors s in terms of protecting cement from damage during storage; 41.2% of the contractors
have average mechanisms in place to reduce wastage of cement on site; 86.6% of the contractors have enough
mechanisms in place to protect cement from theft on site. From the results, it was concluded generally,
management practices of cement is poor. The poor performance were resulted from contractors profits are
eroded and they devise sharp practices using poor quality and inadequate quantity of materials to execute jobs.
This practices lead to project failures, early maintenance needs and cost overruns from the clients‟
stance.Therefore the proper management can improve the productivity and cost efficiency of acement
management to achieve better project delivery.
Keywords: Management practice,Cement, Construction Site,North-eastern Nigeria.
I. INTRODUCTION
Materials management is the scientific method of procuring, storing, safeguarding, transporting and
utilizing materials on site in order to ensure economy and achieve waste minimization (Charlett, 1982).
Materials management, from a scientific perspective, had been a „Cinderella‟ activity in the construction
industry, especially in Nigeria (Adeagbo and Kunya, 2003).Materials are the lifeblood of many industries and it
constitutes more than 50% of the total annual expenditure of a typical manufacturing industry (Fajemilua, 1997).
In the construction industry, Adeagbo and Kunya (2003) noted that materials constitute a large percentage of the
costs that go into the building production, claiming it occupies about 63% in relation to labour contribution of
37% in a typical traditional building construction.The concept of materials management is geared towards
providing the right materials in the right quantity and quality at the right place and time as well as minimizing
waste levels and ensuring profit maximization. However, a study conducted by Adeagbo and Kunya (2003)
revealed that construction professionals pay little attention to the value of materials on site, and they see waste
as the inevitable consequences of the construction process.
Where poor materials management are exercised, some negative consequences include over-
consumption of construction materials resulting from poor material accountability and record keeping; damage
caused by mishandling, undue exposure to weather and vandalism; and excess materials after job is completed
(Greenwood, 2004).
Today‟s construction industry demands prudence in all aspects of materials management, especially on
cement. This is because contract acquisition is becoming increasingly competitive; hence the need for
contractors to be more prudent in handling and utilization of materials. Several projects experience cost and time
overruns in Nigeria due to several factors such as clients‟ behavior, contractors‟ faults, material price
fluctuations, poor material management practices, etc (Achuenu and Kolawole 1988). Materials constitute more
than 60% of the total cost of projects (Adeagbo and Kunya, 2003). Cement is one of the most expensive, easily
stolen and unstable construction materials in Maiduguri today, owing to the fact that most of the cement used
comes from Ashaka cement factory with its attendant high cost. Also, several buildings are collapsing due to
poor quality of work. The project sets out to appraise the general level of compliance of selected contractors in
Maiduguri towards cement management practices. This is targeted to assess by how much compliance or
Challenges Regarding Management Practice Of Cement On Construction Sites North-Eastern
www.ijeijournal.com Page | 24
otherwise this affects the general cost of projects.Fajemilua (1997) advocated that materials management should
embrace the coordination of purchasing, storing, inventory control, production control, scheduling, traffic,
warehousing, distribution and other related functions within a single department which is headed by a materials
manager. This offers such advantages as improved coordination and control of material flow; elimination of
buck passing and conflicting objectives; greater opportunity for cost reduction in the purchased items and
increased prospect for application of modern management tools such as operational research, computer
technology to solve material problems; improved services to sites and enhanced inter-site co-operation; and
avoidance of wasteful duplication of efforts.
Poutpouri (2000) maintained that project managers must, amongst other functions, perform the task of
materials procurement of the right quantity and quality and at right time. Poutpouri (2000) further stated that
materials management should consist of preparing material procurement schedule (MPS), developing the
required materialsdeciding appropriate quantity for procurement, budgeting and arranging approvals and
purchases, preventing waste during site handling, and supplying on time the appropriate quantity and quality of
materials for effective project delivery.According to Fajemilua (1997), materials constitute more than 50% of
the total annual expenditure in a typical manufacturing industry. This figure is however lower than that
presented by Adeagbo and Kunya (2003). According to Adeagbo and Kunya (2003), materials constitute about
63% of cost in comparison to labour‟s input of 37% in a typical building construction, with contribution from
other resources ignored.Tersine (2002) stressed that materials management is a technique of improving
productivity of industrial production, suppliers‟ facilities and distribution warehouses. Tersine (2002) also
noted that the complexity of materials management depends on the type of product, quality and reliability levels
demanded, storage capabilities for purchased items and the level of knowledge of users of the material
management system.
Bred (1981) relates waste level to materials management practice on site, deriving a somewhat inverse
relationship between the two. Although waste occurs at all stages of material-handling operations, proper
materials management practices will help to reduce its level. Bred (1981) further noted that direct and indirect
wastes can occur due to poor materials management practices on site. Direct wastes include complete lost of
materials due to damage on site while indirect wastes occur when materials are either used for purposes other
than those specified or in excess of measured quantity in order to meet the dictates of production. Greenwood
(2004) identified common causes of waste as over-consumption of material resources, damage of materials due
to exposure to inclement weather or inadequate storage, vandalism,poor material recording and poor accounting
system. Sepa and Ciria (2008) advised the use of proactive approach towards waste minimization rather than a
reactive one. It also adopted the use of „partnering‟, which is a concept where designers, contractors, suppliers
of materials and tradesmen on site are duly integrated towards overall material waste reduction.Kolawole (2004)
identified decrease in productivity as another consequence of poor materials management. Bred (1981)
maintained that unaccounted and uncontrolled material wastage, decreased profitability and improper store
management are some of the negative consequences of poor materials management practice on construction
sites.). Orlicky (2005) identified increased profitability, availability of right quantity and quality of materials on
site as well as provision of concise and timely report to management through accurate inventory control.
Charlett (1982) noted that proper materials management has an indirect effect in deterring site accidents and
vandalism through site tidiness.In regard to the above expectations, several materials flow diagrams have been
identified. Farrow (1992) advocated for a material flow in the construction site where material acquisition is
initiated upon successful acquisition of contract. Here, the supplier (or vendor) delivers the required materials
upon receipt of „an order‟ by the buying department. On the overall, the materials manager oversees the whole
flow of material procurement as depicted in Figure 1.
Fig 1. Material supply chain
Challenges Regarding Management Practice Of Cement On Construction Sites North-Eastern
www.ijeijournal.com Page | 25
(Source: Farrow (1992)
Fajemilua (1997), Baily (1982) and Lee (2005) identified some basic components of materials flow
process as including initiating material purchases: sourcing of suppliers, enquiry stage; placement of order,
delivery, reception and inspection; material storage; disbursement and utilization.The aim of this project is to
appraise the level of cement management practices by contractors in Maiduguri, and the objectives are toassess
the current cement management practices amongst some selected contractors in Maiduguri, in terms of
acquisition of materials on sites, daily stores operation; cement delivery by suppliers, cement inspection onsite,
protection of cement from damage during storage and cement wastage during site utilization on site. As well
asidentify factors militating against the areas enumerated and Proffer solution(s) using results generated.
II. METHODOLOGY
Study Area
Maiduguri, the capital of Borno State lies within latitude 10˚N and longitude 11˚30΄E and 14˚ 45́E.
Borno State has an area of 61,43559km and is one of the largest states in the Federation in terms of land mass. It
is located in the North Eastern corner of Nigeria and occupies the greatest part of the Chad basin, sharing
borders with the Republic of Niger to the North, Chad to the North- East and Cameroun to the East (NPN 2006).
Provisional census figures put Borno state to have a population of 4,151,193 and population density of
approximately 60 inhabitants per square kilometer. Maiduguri is populated by civil servants, business men and
women, though there are farmers, herdsman and fishermen living near and far.
Types of Data Collected
Data relating cement management practices were collected using questionnaires. 100 questionnaires were
distributed randomly to selected contractors, out which 85% were recovered, and 15% were lost. The data
collected were analyzed, using simplestatistical technique.
Table 1 Response to questionnaires
Challenges Regarding Management Practice Of Cement On Construction Sites North-Eastern
www.ijeijournal.com Page | 26
III. DISCUSSION OF RESULTS
Results in table 1 showed, majority (81.2%) of the contractors engage in construction work, for many
years. The absence of lack of experience observed were due to lack of interest and commitment. This trend, over
time, had forced contractors to either close or expand their businesses to accommodate construction work, since
buildings are usually on high demand by the government, corporate bodies and private individuals alike.
Statistically average experience of the respondents in construction works is 4.72 years with a standard deviation
of 2.63 years. The experience is very impressive as to construction management practice.78.8% experience
delay in supply, these inadequacies are not in conformity with accepted practice of cement management and
could create financial losses to the contractors and 78.8% of the contractors experiencedelay in cement
delivery and therefore suffer losses which include cost of keeping from damage.90.6%) of contractors perform
satisfactorily in terms of inspecting cement on arrival to site before they are accepted. This practice conforms to
accepted practice on cement management practice and saves cost of inadequate quantity and poor quality of
cement. 95.3% of the contractors have mechanisms in place which minimize cement damage. Because direct
contact of cement with moist environment could cause setting of cement which deteriorate quality of cement,
thus leading to financial losses to the contractors. 95% of the contractors lack themechanisms to minimize
cement wastage on site during utilization, these result fromlack of incentives and poor supervision.
IV. CONCLUSIONS
 The study showed most contractors are ignorant of the importance of efficient and effective cement
management practices on site. The contractors are just interested in their profit margin and not the quality of
work.
 The study also reveals that the contractors lack competent personnel to oversee cement utilization activities
on site.
 The relevance safe-guarding cement on site is clearly supported by the current findings to correctly locate
stores on site, to determine the conditions of storage and the types of systems used in controlling stores
materials.
Recommendations
 Head offices should monitor site cement management practices effectively in order to discourage any sharp
practice from the site operatives. This will ensure that the contractors finish jobs with expected profits not
unduly affected.
 Efforts must be made in order to train store officers in modern store-keeping best practices. This will ensure
cement is not lost due to inefficiency. It will also ensure that adequate inventory management of cement on
site. These practices will prevent undue claims from the contractors who exploit technically ignorant
clients.
 Adequate supervision and incentives given to site operative should be aimed at discouraging wastage of
cement during concreting and other activities on site. This will reduce the level of contractors‟ losses,
thereby protecting the clients to some extent.
REFERENCES
[1] Achuenu, E. andKolawole, J.O. (1988).Assessment of Cost Overruns in Public Projects in Nigeria”,
Nigerian Journal of Construction Technology and Management (1), p 8.
[2] Adeagbo, D. O. andKunya, S. U. (2003).Review of Waste Reduction Strategies on Nigerian Construction
Sites, ATBU Journal of Enviromental Technology, Vol. 2, pp 49- 50.
[3] Baily, P. J. H. (1987). Purchasing and Supply Management, 4th
Ed., London: Chapman and Hall, pp 251-
413.
[4] Bred. (1981). Waste of Building Materials, T 6, No. 247, Building Research Station, pp 2-8.
[5] Charlett, A. J. (1982). Deterring Vandalism on Building Sites, The Chattered Institute of Building
Technical Information Service, No. 1, pp 1-8.
[6] Fajemilua, B. (1997). Introduction to Purchasing and Supply Management, Ile Ife, ObafemiAwolowo
University Press Ltd, pp 18-218.
[7] Farrow, T. (1992). Modern Construction Management, London, Prentice Hall, pp 76-85.
[8] Greenwood, R. (2004): “Construction Waste Minimization – Good Practice Guide”,www.cf.ac.uk/arci,
pp 8-10.
[9] Lee, L. (2005): Purchasing and Materials Management---Text and Cases, New Delhi, McGraw-Hill Co.
Inc., pp 16-420.
[10] Orlicky, J. A. (2005): Material Requirement Planning, New York, McGraw-Hill, pp 102, 146.
[11] Tersine, R. J. (2002): Principles of Inventory and Materials Management, 2nd
Ed., Amsterdam, Elsevier, p
20.

More Related Content

What's hot

IRJET- A Case Study of Cement Manufacturing Process : A Review
IRJET- A Case Study of Cement Manufacturing Process : A ReviewIRJET- A Case Study of Cement Manufacturing Process : A Review
IRJET- A Case Study of Cement Manufacturing Process : A ReviewIRJET Journal
 
Construction waste management plan
Construction waste management planConstruction waste management plan
Construction waste management planMohd Azmi
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...IRJET Journal
 
Waste management on construction sites
Waste management on construction sitesWaste management on construction sites
Waste management on construction sitesAli Hasan
 
Time, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsTime, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsIRJET Journal
 
Work study might be the paramount methodology to improve productivity in the ...
Work study might be the paramount methodology to improve productivity in the ...Work study might be the paramount methodology to improve productivity in the ...
Work study might be the paramount methodology to improve productivity in the ...Alexander Decker
 
Infrared Monitoring of Aluminium Milling Processes for Reduction of Environme...
Infrared Monitoring of Aluminium Milling Processes for Reduction of Environme...Infrared Monitoring of Aluminium Milling Processes for Reduction of Environme...
Infrared Monitoring of Aluminium Milling Processes for Reduction of Environme...IRJESJOURNAL
 
Suggestions on the Methodology of Parameters in Fused Deposition Modeling Pro...
Suggestions on the Methodology of Parameters in Fused Deposition Modeling Pro...Suggestions on the Methodology of Parameters in Fused Deposition Modeling Pro...
Suggestions on the Methodology of Parameters in Fused Deposition Modeling Pro...IRJESJOURNAL
 
Cost Analysis for Management Decisions
Cost Analysis for Management DecisionsCost Analysis for Management Decisions
Cost Analysis for Management Decisionsprofessionalpanorama
 
Cost analysis for management decisions
Cost analysis for management decisionsCost analysis for management decisions
Cost analysis for management decisionsTapasya123
 
Logistic support
Logistic supportLogistic support
Logistic supporttick_tick
 

What's hot (15)

Biotech Facility Modular Construction
Biotech Facility Modular ConstructionBiotech Facility Modular Construction
Biotech Facility Modular Construction
 
IRJET- A Case Study of Cement Manufacturing Process : A Review
IRJET- A Case Study of Cement Manufacturing Process : A ReviewIRJET- A Case Study of Cement Manufacturing Process : A Review
IRJET- A Case Study of Cement Manufacturing Process : A Review
 
Construction waste management plan
Construction waste management planConstruction waste management plan
Construction waste management plan
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
 
Y4201162171
Y4201162171Y4201162171
Y4201162171
 
H0341034041
H0341034041H0341034041
H0341034041
 
Waste management on construction sites
Waste management on construction sitesWaste management on construction sites
Waste management on construction sites
 
Time, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsTime, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast Buildings
 
Work study might be the paramount methodology to improve productivity in the ...
Work study might be the paramount methodology to improve productivity in the ...Work study might be the paramount methodology to improve productivity in the ...
Work study might be the paramount methodology to improve productivity in the ...
 
Infrared Monitoring of Aluminium Milling Processes for Reduction of Environme...
Infrared Monitoring of Aluminium Milling Processes for Reduction of Environme...Infrared Monitoring of Aluminium Milling Processes for Reduction of Environme...
Infrared Monitoring of Aluminium Milling Processes for Reduction of Environme...
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
 
Suggestions on the Methodology of Parameters in Fused Deposition Modeling Pro...
Suggestions on the Methodology of Parameters in Fused Deposition Modeling Pro...Suggestions on the Methodology of Parameters in Fused Deposition Modeling Pro...
Suggestions on the Methodology of Parameters in Fused Deposition Modeling Pro...
 
Cost Analysis for Management Decisions
Cost Analysis for Management DecisionsCost Analysis for Management Decisions
Cost Analysis for Management Decisions
 
Cost analysis for management decisions
Cost analysis for management decisionsCost analysis for management decisions
Cost analysis for management decisions
 
Logistic support
Logistic supportLogistic support
Logistic support
 

Viewers also liked

Article supply chain magazine
Article supply chain magazineArticle supply chain magazine
Article supply chain magazineLogicités
 
Article supply chain magazine
Article supply chain magazineArticle supply chain magazine
Article supply chain magazineLogicités
 
Panoramic Around the World
Panoramic Around the WorldPanoramic Around the World
Panoramic Around the Worldmaditabalnco
 
Zones à risques
Zones à risquesZones à risques
Zones à risqueslavenir
 
ORANGE CITY & ITS RELEVANCE FOR BUSINESS
ORANGE CITY & ITS RELEVANCE FOR BUSINESSORANGE CITY & ITS RELEVANCE FOR BUSINESS
ORANGE CITY & ITS RELEVANCE FOR BUSINESSShruti Parate
 
A case on air india’s pilot strike
A case on air india’s pilot strikeA case on air india’s pilot strike
A case on air india’s pilot strikeSonali Garwal
 
Reasons for change in crude oil price
Reasons for change in crude oil price Reasons for change in crude oil price
Reasons for change in crude oil price Gurjit Kaur Kaler
 

Viewers also liked (20)

B0480613
B0480613B0480613
B0480613
 
E0482732
E0482732E0482732
E0482732
 
A0480105
A0480105A0480105
A0480105
 
F0483340
F0483340F0483340
F0483340
 
C0481422
C0481422C0481422
C0481422
 
Article supply chain magazine
Article supply chain magazineArticle supply chain magazine
Article supply chain magazine
 
Article supply chain magazine
Article supply chain magazineArticle supply chain magazine
Article supply chain magazine
 
The castle of justice
The castle of justiceThe castle of justice
The castle of justice
 
Panoramic Around the World
Panoramic Around the WorldPanoramic Around the World
Panoramic Around the World
 
Zones à risques
Zones à risquesZones à risques
Zones à risques
 
kalkulus2
kalkulus2kalkulus2
kalkulus2
 
ORANGE CITY & ITS RELEVANCE FOR BUSINESS
ORANGE CITY & ITS RELEVANCE FOR BUSINESSORANGE CITY & ITS RELEVANCE FOR BUSINESS
ORANGE CITY & ITS RELEVANCE FOR BUSINESS
 
A case on air india’s pilot strike
A case on air india’s pilot strikeA case on air india’s pilot strike
A case on air india’s pilot strike
 
CONTROLINGs
CONTROLINGsCONTROLINGs
CONTROLINGs
 
Reasons for change in crude oil price
Reasons for change in crude oil price Reasons for change in crude oil price
Reasons for change in crude oil price
 
B04 06 0918
B04 06 0918B04 06 0918
B04 06 0918
 
H04025057
H04025057H04025057
H04025057
 
E04023144
E04023144E04023144
E04023144
 
E04012533
E04012533E04012533
E04012533
 
C04021319
C04021319C04021319
C04021319
 

Similar to D0482326

Assessment of materials waste in the construction industry: A view of Constru...
Assessment of materials waste in the construction industry: A view of Constru...Assessment of materials waste in the construction industry: A view of Constru...
Assessment of materials waste in the construction industry: A view of Constru...theijes
 
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRYA REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRYIRJET Journal
 
Management for Construction Materials and Control of Construction Waste in Co...
Management for Construction Materials and Control of Construction Waste in Co...Management for Construction Materials and Control of Construction Waste in Co...
Management for Construction Materials and Control of Construction Waste in Co...IJERA Editor
 
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...IRJET Journal
 
IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET Journal
 
IRJET- Efficient Techniques of Construction Material Management in Constr...
IRJET-  	  Efficient Techniques of Construction Material Management in Constr...IRJET-  	  Efficient Techniques of Construction Material Management in Constr...
IRJET- Efficient Techniques of Construction Material Management in Constr...IRJET Journal
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...IRJET Journal
 
Identification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIdentification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIRJET Journal
 
The Impact of Materials Management on Profitability of Manufacturing Companie...
The Impact of Materials Management on Profitability of Manufacturing Companie...The Impact of Materials Management on Profitability of Manufacturing Companie...
The Impact of Materials Management on Profitability of Manufacturing Companie...Dr. Amarjeet Singh
 
Factors_Affecting_Material_Management_on (1).pdf
Factors_Affecting_Material_Management_on (1).pdfFactors_Affecting_Material_Management_on (1).pdf
Factors_Affecting_Material_Management_on (1).pdfGsFds
 
IRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
Factors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction SiteFactors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction SiteIRJET Journal
 
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...IRJET Journal
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriaNewman Jonathan
 
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET -  	  Causes, Effects and Minimizing Methods of Construction Projects D...IRJET -  	  Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...IRJET Journal
 
Corporate profitability through effective management of materials, the case
Corporate profitability through effective management of materials, the caseCorporate profitability through effective management of materials, the case
Corporate profitability through effective management of materials, the caseAlexander Decker
 
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...IJAEMSJORNAL
 
An assessment of material management on building construction sites
An assessment of material management on building construction sitesAn assessment of material management on building construction sites
An assessment of material management on building construction sitesAlexander Decker
 

Similar to D0482326 (20)

Assessment of materials waste in the construction industry: A view of Constru...
Assessment of materials waste in the construction industry: A view of Constru...Assessment of materials waste in the construction industry: A view of Constru...
Assessment of materials waste in the construction industry: A view of Constru...
 
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRYA REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
 
Management for Construction Materials and Control of Construction Waste in Co...
Management for Construction Materials and Control of Construction Waste in Co...Management for Construction Materials and Control of Construction Waste in Co...
Management for Construction Materials and Control of Construction Waste in Co...
 
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
 
IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...
 
IRJET- Efficient Techniques of Construction Material Management in Constr...
IRJET-  	  Efficient Techniques of Construction Material Management in Constr...IRJET-  	  Efficient Techniques of Construction Material Management in Constr...
IRJET- Efficient Techniques of Construction Material Management in Constr...
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
 
Identification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIdentification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building Construction
 
The Impact of Materials Management on Profitability of Manufacturing Companie...
The Impact of Materials Management on Profitability of Manufacturing Companie...The Impact of Materials Management on Profitability of Manufacturing Companie...
The Impact of Materials Management on Profitability of Manufacturing Companie...
 
Factors_Affecting_Material_Management_on (1).pdf
Factors_Affecting_Material_Management_on (1).pdfFactors_Affecting_Material_Management_on (1).pdf
Factors_Affecting_Material_Management_on (1).pdf
 
IRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction Projects
 
Factors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction SiteFactors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction Site
 
D013152126
D013152126D013152126
D013152126
 
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeria
 
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET -  	  Causes, Effects and Minimizing Methods of Construction Projects D...IRJET -  	  Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
 
Corporate profitability through effective management of materials, the case
Corporate profitability through effective management of materials, the caseCorporate profitability through effective management of materials, the case
Corporate profitability through effective management of materials, the case
 
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
 
Ijmet 10 01_190
Ijmet 10 01_190Ijmet 10 01_190
Ijmet 10 01_190
 
An assessment of material management on building construction sites
An assessment of material management on building construction sitesAn assessment of material management on building construction sites
An assessment of material management on building construction sites
 

More from International Journal of Engineering Inventions www.ijeijournal.com

More from International Journal of Engineering Inventions www.ijeijournal.com (20)

H04124548
H04124548H04124548
H04124548
 
G04123844
G04123844G04123844
G04123844
 
F04123137
F04123137F04123137
F04123137
 
E04122330
E04122330E04122330
E04122330
 
C04121115
C04121115C04121115
C04121115
 
B04120610
B04120610B04120610
B04120610
 
A04120105
A04120105A04120105
A04120105
 
F04113640
F04113640F04113640
F04113640
 
E04112135
E04112135E04112135
E04112135
 
D04111520
D04111520D04111520
D04111520
 
C04111114
C04111114C04111114
C04111114
 
B04110710
B04110710B04110710
B04110710
 
A04110106
A04110106A04110106
A04110106
 
I04105358
I04105358I04105358
I04105358
 
H04104952
H04104952H04104952
H04104952
 
G04103948
G04103948G04103948
G04103948
 
F04103138
F04103138F04103138
F04103138
 
E04102330
E04102330E04102330
E04102330
 
D04101822
D04101822D04101822
D04101822
 
C04101217
C04101217C04101217
C04101217
 

Recently uploaded

UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1DianaGray10
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxMatsuo Lab
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Will Schroeder
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostMatt Ray
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfAijun Zhang
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPathCommunity
 
UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8DianaGray10
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationIES VE
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsSafe Software
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaborationbruanjhuli
 
UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6DianaGray10
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioChristian Posta
 
VoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXVoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXTarek Kalaji
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1DianaGray10
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-pyJamie (Taka) Wang
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?IES VE
 

Recently uploaded (20)

UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptx
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdf
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation Developers
 
20150722 - AGV
20150722 - AGV20150722 - AGV
20150722 - AGV
 
UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
 
UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and Istio
 
VoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXVoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBX
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-py
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?
 

D0482326

  • 1. International Journal of Engineering Inventions e-ISSN: 2278-7461, p-ISSN: 2319-6491 Volume 4, Issue 8 [January 2015] PP: 23-26 www.ijeijournal.com Page | 23 Challenges Regarding Management Practice Of Cement On Construction Sites North-Eastern Nigeria 1 arinze N. A.;2 Dammo.M. N.; 2 Isa A.;2 Deborah, J. M.; 3 Aji. A.Band 2 G. B. YUSUF 1 Department of Building Engineering, Ramat Polytechnic Maiduguri, Nigeria 2 Department of Civil Engineering, Ramat Polytechnic Maiduguri, Nigeria 3 Department of Civil Engineering, Federal Polytechnic Damaturu, Nigeria Abstract: Cement management is particularly problematicby selected contractors in Maiduguri.This paper is written to fill a void created by the absence of proper cement management on construction sites. To managing a productive cost efficient and site efficient cement management is very essential.Research showed that, 89%, of the contractors manage and concentrate on cement operations on the site; 37.1% of the contractors employ qualified stores operation officers; 71% of the contractors calculate the quantity of cement required before purchasing; 27.7% of the contractors have poor mechanisms in place to engage cement suppliers; 78.9% of the contractors experience delay in cement delivery; 90.6% of the contractors inspect cement on arrival to site; 78.9% of the contractors s in terms of protecting cement from damage during storage; 41.2% of the contractors have average mechanisms in place to reduce wastage of cement on site; 86.6% of the contractors have enough mechanisms in place to protect cement from theft on site. From the results, it was concluded generally, management practices of cement is poor. The poor performance were resulted from contractors profits are eroded and they devise sharp practices using poor quality and inadequate quantity of materials to execute jobs. This practices lead to project failures, early maintenance needs and cost overruns from the clients‟ stance.Therefore the proper management can improve the productivity and cost efficiency of acement management to achieve better project delivery. Keywords: Management practice,Cement, Construction Site,North-eastern Nigeria. I. INTRODUCTION Materials management is the scientific method of procuring, storing, safeguarding, transporting and utilizing materials on site in order to ensure economy and achieve waste minimization (Charlett, 1982). Materials management, from a scientific perspective, had been a „Cinderella‟ activity in the construction industry, especially in Nigeria (Adeagbo and Kunya, 2003).Materials are the lifeblood of many industries and it constitutes more than 50% of the total annual expenditure of a typical manufacturing industry (Fajemilua, 1997). In the construction industry, Adeagbo and Kunya (2003) noted that materials constitute a large percentage of the costs that go into the building production, claiming it occupies about 63% in relation to labour contribution of 37% in a typical traditional building construction.The concept of materials management is geared towards providing the right materials in the right quantity and quality at the right place and time as well as minimizing waste levels and ensuring profit maximization. However, a study conducted by Adeagbo and Kunya (2003) revealed that construction professionals pay little attention to the value of materials on site, and they see waste as the inevitable consequences of the construction process. Where poor materials management are exercised, some negative consequences include over- consumption of construction materials resulting from poor material accountability and record keeping; damage caused by mishandling, undue exposure to weather and vandalism; and excess materials after job is completed (Greenwood, 2004). Today‟s construction industry demands prudence in all aspects of materials management, especially on cement. This is because contract acquisition is becoming increasingly competitive; hence the need for contractors to be more prudent in handling and utilization of materials. Several projects experience cost and time overruns in Nigeria due to several factors such as clients‟ behavior, contractors‟ faults, material price fluctuations, poor material management practices, etc (Achuenu and Kolawole 1988). Materials constitute more than 60% of the total cost of projects (Adeagbo and Kunya, 2003). Cement is one of the most expensive, easily stolen and unstable construction materials in Maiduguri today, owing to the fact that most of the cement used comes from Ashaka cement factory with its attendant high cost. Also, several buildings are collapsing due to poor quality of work. The project sets out to appraise the general level of compliance of selected contractors in Maiduguri towards cement management practices. This is targeted to assess by how much compliance or
  • 2. Challenges Regarding Management Practice Of Cement On Construction Sites North-Eastern www.ijeijournal.com Page | 24 otherwise this affects the general cost of projects.Fajemilua (1997) advocated that materials management should embrace the coordination of purchasing, storing, inventory control, production control, scheduling, traffic, warehousing, distribution and other related functions within a single department which is headed by a materials manager. This offers such advantages as improved coordination and control of material flow; elimination of buck passing and conflicting objectives; greater opportunity for cost reduction in the purchased items and increased prospect for application of modern management tools such as operational research, computer technology to solve material problems; improved services to sites and enhanced inter-site co-operation; and avoidance of wasteful duplication of efforts. Poutpouri (2000) maintained that project managers must, amongst other functions, perform the task of materials procurement of the right quantity and quality and at right time. Poutpouri (2000) further stated that materials management should consist of preparing material procurement schedule (MPS), developing the required materialsdeciding appropriate quantity for procurement, budgeting and arranging approvals and purchases, preventing waste during site handling, and supplying on time the appropriate quantity and quality of materials for effective project delivery.According to Fajemilua (1997), materials constitute more than 50% of the total annual expenditure in a typical manufacturing industry. This figure is however lower than that presented by Adeagbo and Kunya (2003). According to Adeagbo and Kunya (2003), materials constitute about 63% of cost in comparison to labour‟s input of 37% in a typical building construction, with contribution from other resources ignored.Tersine (2002) stressed that materials management is a technique of improving productivity of industrial production, suppliers‟ facilities and distribution warehouses. Tersine (2002) also noted that the complexity of materials management depends on the type of product, quality and reliability levels demanded, storage capabilities for purchased items and the level of knowledge of users of the material management system. Bred (1981) relates waste level to materials management practice on site, deriving a somewhat inverse relationship between the two. Although waste occurs at all stages of material-handling operations, proper materials management practices will help to reduce its level. Bred (1981) further noted that direct and indirect wastes can occur due to poor materials management practices on site. Direct wastes include complete lost of materials due to damage on site while indirect wastes occur when materials are either used for purposes other than those specified or in excess of measured quantity in order to meet the dictates of production. Greenwood (2004) identified common causes of waste as over-consumption of material resources, damage of materials due to exposure to inclement weather or inadequate storage, vandalism,poor material recording and poor accounting system. Sepa and Ciria (2008) advised the use of proactive approach towards waste minimization rather than a reactive one. It also adopted the use of „partnering‟, which is a concept where designers, contractors, suppliers of materials and tradesmen on site are duly integrated towards overall material waste reduction.Kolawole (2004) identified decrease in productivity as another consequence of poor materials management. Bred (1981) maintained that unaccounted and uncontrolled material wastage, decreased profitability and improper store management are some of the negative consequences of poor materials management practice on construction sites.). Orlicky (2005) identified increased profitability, availability of right quantity and quality of materials on site as well as provision of concise and timely report to management through accurate inventory control. Charlett (1982) noted that proper materials management has an indirect effect in deterring site accidents and vandalism through site tidiness.In regard to the above expectations, several materials flow diagrams have been identified. Farrow (1992) advocated for a material flow in the construction site where material acquisition is initiated upon successful acquisition of contract. Here, the supplier (or vendor) delivers the required materials upon receipt of „an order‟ by the buying department. On the overall, the materials manager oversees the whole flow of material procurement as depicted in Figure 1. Fig 1. Material supply chain
  • 3. Challenges Regarding Management Practice Of Cement On Construction Sites North-Eastern www.ijeijournal.com Page | 25 (Source: Farrow (1992) Fajemilua (1997), Baily (1982) and Lee (2005) identified some basic components of materials flow process as including initiating material purchases: sourcing of suppliers, enquiry stage; placement of order, delivery, reception and inspection; material storage; disbursement and utilization.The aim of this project is to appraise the level of cement management practices by contractors in Maiduguri, and the objectives are toassess the current cement management practices amongst some selected contractors in Maiduguri, in terms of acquisition of materials on sites, daily stores operation; cement delivery by suppliers, cement inspection onsite, protection of cement from damage during storage and cement wastage during site utilization on site. As well asidentify factors militating against the areas enumerated and Proffer solution(s) using results generated. II. METHODOLOGY Study Area Maiduguri, the capital of Borno State lies within latitude 10˚N and longitude 11˚30΄E and 14˚ 45́E. Borno State has an area of 61,43559km and is one of the largest states in the Federation in terms of land mass. It is located in the North Eastern corner of Nigeria and occupies the greatest part of the Chad basin, sharing borders with the Republic of Niger to the North, Chad to the North- East and Cameroun to the East (NPN 2006). Provisional census figures put Borno state to have a population of 4,151,193 and population density of approximately 60 inhabitants per square kilometer. Maiduguri is populated by civil servants, business men and women, though there are farmers, herdsman and fishermen living near and far. Types of Data Collected Data relating cement management practices were collected using questionnaires. 100 questionnaires were distributed randomly to selected contractors, out which 85% were recovered, and 15% were lost. The data collected were analyzed, using simplestatistical technique. Table 1 Response to questionnaires
  • 4. Challenges Regarding Management Practice Of Cement On Construction Sites North-Eastern www.ijeijournal.com Page | 26 III. DISCUSSION OF RESULTS Results in table 1 showed, majority (81.2%) of the contractors engage in construction work, for many years. The absence of lack of experience observed were due to lack of interest and commitment. This trend, over time, had forced contractors to either close or expand their businesses to accommodate construction work, since buildings are usually on high demand by the government, corporate bodies and private individuals alike. Statistically average experience of the respondents in construction works is 4.72 years with a standard deviation of 2.63 years. The experience is very impressive as to construction management practice.78.8% experience delay in supply, these inadequacies are not in conformity with accepted practice of cement management and could create financial losses to the contractors and 78.8% of the contractors experiencedelay in cement delivery and therefore suffer losses which include cost of keeping from damage.90.6%) of contractors perform satisfactorily in terms of inspecting cement on arrival to site before they are accepted. This practice conforms to accepted practice on cement management practice and saves cost of inadequate quantity and poor quality of cement. 95.3% of the contractors have mechanisms in place which minimize cement damage. Because direct contact of cement with moist environment could cause setting of cement which deteriorate quality of cement, thus leading to financial losses to the contractors. 95% of the contractors lack themechanisms to minimize cement wastage on site during utilization, these result fromlack of incentives and poor supervision. IV. CONCLUSIONS  The study showed most contractors are ignorant of the importance of efficient and effective cement management practices on site. The contractors are just interested in their profit margin and not the quality of work.  The study also reveals that the contractors lack competent personnel to oversee cement utilization activities on site.  The relevance safe-guarding cement on site is clearly supported by the current findings to correctly locate stores on site, to determine the conditions of storage and the types of systems used in controlling stores materials. Recommendations  Head offices should monitor site cement management practices effectively in order to discourage any sharp practice from the site operatives. This will ensure that the contractors finish jobs with expected profits not unduly affected.  Efforts must be made in order to train store officers in modern store-keeping best practices. This will ensure cement is not lost due to inefficiency. It will also ensure that adequate inventory management of cement on site. These practices will prevent undue claims from the contractors who exploit technically ignorant clients.  Adequate supervision and incentives given to site operative should be aimed at discouraging wastage of cement during concreting and other activities on site. This will reduce the level of contractors‟ losses, thereby protecting the clients to some extent. REFERENCES [1] Achuenu, E. andKolawole, J.O. (1988).Assessment of Cost Overruns in Public Projects in Nigeria”, Nigerian Journal of Construction Technology and Management (1), p 8. [2] Adeagbo, D. O. andKunya, S. U. (2003).Review of Waste Reduction Strategies on Nigerian Construction Sites, ATBU Journal of Enviromental Technology, Vol. 2, pp 49- 50. [3] Baily, P. J. H. (1987). Purchasing and Supply Management, 4th Ed., London: Chapman and Hall, pp 251- 413. [4] Bred. (1981). Waste of Building Materials, T 6, No. 247, Building Research Station, pp 2-8. [5] Charlett, A. J. (1982). Deterring Vandalism on Building Sites, The Chattered Institute of Building Technical Information Service, No. 1, pp 1-8. [6] Fajemilua, B. (1997). Introduction to Purchasing and Supply Management, Ile Ife, ObafemiAwolowo University Press Ltd, pp 18-218. [7] Farrow, T. (1992). Modern Construction Management, London, Prentice Hall, pp 76-85. [8] Greenwood, R. (2004): “Construction Waste Minimization – Good Practice Guide”,www.cf.ac.uk/arci, pp 8-10. [9] Lee, L. (2005): Purchasing and Materials Management---Text and Cases, New Delhi, McGraw-Hill Co. Inc., pp 16-420. [10] Orlicky, J. A. (2005): Material Requirement Planning, New York, McGraw-Hill, pp 102, 146. [11] Tersine, R. J. (2002): Principles of Inventory and Materials Management, 2nd Ed., Amsterdam, Elsevier, p 20.