Your SlideShare is downloading. ×
  • Like
  • Save
Informe
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply
Published

 

Published in Travel , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
275
On SlideShare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
2
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. INFORME SIMULACIÓN Departamento de producción Elaborado por: Ing. Alejandro Acevedo
  • 2. LíneadeProducción1 LíneadeProducción2 EnsambleCalidad Separación
  • 3. Operario 1 BO1 Operario 3 RO1 Operario 5 AM1 Operario 7 AZ1 Operario 9 VE1 Operario 2 BO2 Operario 4 RO2 Operario 6 AM2 Operario 8 AZ2 Operario 10 VE2 Patinador 2 PA2 Separador 2 SE2 Ensamble 4 EN4 Ensamble 3 EN3 Separador 1 SE1 Patinador 1 PA1 Ensamble 1 EN1 Ensamble 2 EN 2 Calidad 1 CA1
  • 4. Productividad del Trabajo Estimada: 103 (juguetes) / 20*0.25*1= 20.6 juguete por hombre en horas Productividad del Trabajo Obtenida: 13 (juguetes) / 20*0.25*1= 2.6 juguete por hombre en horas
  • 5. EFICIENCIA IDEAL: Eficiencia: 13/150 = 8.67% 0 20 40 60 80 100 1 100 8.67 Eficiencia Ideal Eficiencia Obtenida
  • 6. EFICIENCIA ESPERADA: Eficiencia: 13/120 = 8.67% 0 10 20 30 40 50 60 70 80 90 100 1 100 10.83 Eficiencia Esperada Eficiencia Obtenida
  • 7. LíneadeProducción1 LíneadeProducción2 Separación Calidad Ensamble