  1. 1. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 1-Nationale voorbespreking CIRED 13session 1NETWORK COMPONENTSE. Alferink P. dAmico M. Azzahimi F. Besseling W. BieleveldM. Binnendijk H. Bossink B. Bouman M. van Dijk J. DragtP. van Gestel P. Geusendam M. Haim A. Hamer B. ter HeddeD. Heilersig G. Hendriks M. Imming B. Knol R. KonegenF. Kuipers A. Lammers F. Lovato E. Morskieft Y. PetermanH. Picard A. Pikkert W. Porte A. Postmus P. SchuurmansC. Tirdea B. Weijers Chai YajingGerard Schoonenberg / Johan de Jong +
  2. 2. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 2-(9 nieuw, 4 afgehaakt)session 1: 124 papers uit 33 landen
  3. 3. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 3-124 papers 33 landen, 4 uit NL2011: 134 papers uit 28 landen, 13 uit NL2009: 110 papers uit 31 landen, 11 uit NL2007: 103 papers uit 28 landen, 12 uit NL2005: 120 papers uit 32 landen, 10 uit NLsession 1: Network components
  4. 4. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 4-session 1: Network components• Main session (4 blocks) Di 11 Juni• 3* RT (Round Table) + Do 13 JuniRIF (Research Innovation Forum)• Posters (“alle” papers) WO 12 Juni
  5. 5. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 5-1. Ageing of network components, diagnostic and monitoring(= PD on line, transformer oil and tap changers)2. Return from field experience, retrofit and maintenancestrategies(= cables, OHL, overvoltages: VI, lightning, retrofit, fixed vs w.d.)3. Innovative network components for the Smart Grids(= sensors U, I, FCL, triax SC cable)4. Innovation in network components(= simulations: thermal, Arc; SF6 free solutions 463, 1115, 1201)Main session: 4 blocks
  6. 6. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 6-Round tables(3*) and RIF1a: voltage regulation vs fluctuating distributedgeneration1b: Smart secondary substations + innovativecomponents that are needed1c: PD and on-line cable monitoringRIF: innovative solutions by TU’s (‘modelling’)(6 papers: 483, 505, 572, 580, 997, 1484)
  7. 7. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 7-4 papers to discuss today1332: Integrated Smart Grid Concept - Experience in a GermanDistribution Grid1448: Evaluation of communication components for monitoringsmall hydroelectric plants466: Correlation of accelerated ageing phenomena and long-termcable performance1341: Conductivity and quality of semi-conductive materials inMV cable accessories
  8. 8. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 8-1332: INTEGRATED SMART GRID CONCEPT –EXPERIENCE IN A GERMAN DISTRIBUTION GRID• Mainova (E-bedrijf, Frankfurt am)• Wuppertal UniversityACHTERGROND voor paper:2011 „Energiewende“: 80% el. in 2050 renewable energy sourcesdoel 2020 is 35% renewables = ca 100 GWPeak demand nu ca 85 GW in Dl. Als backup is ook 85 GW conventional nodig.Na 2020, generation > maximum consumption→ o.a. large scale reversible electricity storage + integratie van• new renewable generation technologies – e.g. organic solar cells• electrical devices – e.g. electrical vehicles, heat pumps, air condition systems
  9. 9. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 9-1332: INTEGRATED SMART GRID CONCEPT –EXPERIENCE IN A GERMAN DISTRIBUTION GRIDGrootste uitdaging is distribution grid:uitgelegd as “one way” system – from source to sink.Tot 2020: integratie renewable energy sources dmv 2 activititeiten:1. Balans vraag – aanbod en manage ‘generation volatility of renewables’(time based issue) → ‘smart market’ (prijssturing)2. Connecting the renewables to the grid (mainly on the distribution level),managing the transportation of electricity from new sources to existing sinksmanaging load flow volatility in the grid(time and location based issue) → ‘smart grid’
  10. 10. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 10-1332: INTEGRATED SMART GRID CONCEPT –EXPERIENCE IN A GERMAN DISTRIBUTION GRIDiNES: Intelligente Ortsnetzstation:Autonoom on line algoritme (net – en markt input) past I en U aan:1. U aanpassen2. Q (load en / of opwekking) aanpassen3. P aanpassen (klant zo laat mogelijk hinder)→ tot 50% gridinvestments avoided / postponed
  11. 11. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 11-1332: INTEGRATED SMART GRID CONCEPT –EXPERIENCE IN A GERMAN DISTRIBUTION GRIDipv gebruiker wordt de klant een“active player with rights and obligations““The more the customer is willing to be an active part of the smartsystem, the cheaper the costs for the grid of the future will be“
  12. 12. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 12-1448: EVALUATION OF COMMUNICATION COMPONENTSFOR MONITORING SMALL HYDROELECTRIC PLANTS• Copel (E-bedrijf, Brazilie)• USP (Sao Paulo University)SHP (Small Hydroelectric Plant) between 1 and 30 MWlocated in rural areas, supervised from an OCC (Operational Control Centre).Smart Grid concepts to be considered in the requirements for controlling andmonitoring of SHPData communication technologies (met + en -) :• Dedicated Line (Leased, Private)• RF• Cellular network (GSM, GPRS)• PLC (broadband, narrow band)
  13. 13. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 13-1448: EVALUATION OF COMMUNICATION COMPONENTSFOR MONITORING SMALL HYDROELECTRIC PLANTSOverdracht PLC narrow band goed genoeg:• communication not affected by any power line equipment or abnormal conditions• lack of standardization for narrowband.2 PLC narrow band projects:• PRIME• G3 PLC
  14. 14. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 14-1341:Semi-conductive materials on MV cablesConductivity and Quality of semi-conductive materials in MV cableaccessoriesSchrijvers: Laborelec, ORES, EANDIS, SibelgaDoelstelling: Een assesment van kabel connectors m.b.t. het testen van deexterne semi geleidende laag bij gebruik voor outdoor toepassingen.Uitgangsmaterialen:1. EPDM2. SIRAssesment is uitgevoerd voor en na een versnelde veroudering procedure.
  15. 15. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 15-1341:Semi-conductive materials on MV cablesConductivity and Quality of semi-conductive materials in MV cableaccessoriesOnderzochte karakteristieken voor en na de veroudering:• Chemische samenstelling• Carbon gehalte• Thermische stabiliteit• Aditieven• Mechanische eigenschappen• Rek testen• SC scherm weerstand
  16. 16. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 16-1341:Semi-conductive materials on MV cablesConclusie:• Geen echt significante verschillen tussen EPDM en SIR• Connector 1: Samen met 5 als een na beste gewaardeerd.• Connector 2: Beste resultaat, geringste verlies van eigenschappen• Connector 3: Niet geschikt voor outdoor toepassingen.Dunne SC scherm maar niet vanwege veroudering maarvanwege constructie.• Connector 4: Niet geschikt voor outdoor toepassingen vanwege veroudering• Connector 5: Leek water te absorberen maar onbekend in welke mate.Werd samen met 1 als een na beste gewaardeerd.Eigenlijk maar 1 exemplaar dat vanwege veroudering niet geschikt is vooroutdoor toepassingen.
  17. 17. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 17-466: Accelerated ageing and cable performanceCorrelation of accelerated aging phenomena and long-term cable performance.Schrijvers:• Paul Brigandi – Dow Chemical Company USA• Simon Sutton – Dow Chemical Company Ltd – UK• Stephen Cree – Dow Europe GmbH – DDoelstelling: Verband tussen qualificatie testen en levensduur van MV XLPE kabels.Het paper probeert te verklaren waarom verbetering van het isolatiemateriaal slechts eenbescheiden verbetering laat zien m.b.t. qualificatie testen terwijl dezelfde verbeteringkennelijk een veel grotere verbetering laat zien in de praktijk (Time to Failure).
  18. 18. Nl voorbespreking CIRED 2013 8 mei 2013 session 1: NETWORK COMPONENTS - 18-466: Accelerated ageing and cable performanceExperimenten:• Water tree growth rate• Accelerated Cable aging tests• Accelerated Cable Life Test

×