Brief Of Current Ksa Projects
Upcoming SlideShare
Loading in...5
×
 

Brief Of Current Ksa Projects

on

  • 901 views

 

Statistics

Views

Total Views
901
Views on SlideShare
896
Embed Views
5

Actions

Likes
0
Downloads
11
Comments
0

2 Embeds 5

http://www.linkedin.com 4
https://www.linkedin.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Brief Of Current Ksa Projects Brief Of Current Ksa Projects Presentation Transcript

    • Development Overview 2011
    • Current Developments Al Qasr Development - Riyadh 3.7 billion Shams Ar Riyadh - Riyadh 6.5 billion Al Tilal Development - Madinah 330 million Qasr Khozam - Jeddah 11.9 billion Shams al Arous - Jeddah 10.0 billion Total Project’s: 32.4 billion
    • Al Qasr Development Al Qasr Development Site area 990,000 m²  63,135 m² ground floor retail Built-up area 776,200 m²  28,000 m² of commercial 3051 Residential  150,000 m² of public parks Estimated Cost SR1.7 billion  230,000 m² Built-up area Shopping Centre
    • Al Qasr Apartments Al Qasr Apartments 2796 Residential Units 130 buildings – avg. apartment size 170 m² Delivery of Units commenced Sept 2008 Last Delivery expected Dec 2009- Completed
    • Al Qasr Medical Facility Building• 28,000 sq mtr of commercial BUA• 65 Offices• 7 Shops
    • Al Qasr Villas Al Qasr Villas 254 Residential Units 4 Bedrooms average villa size 330 m² Delivery of Homes Commenced April 2008 Last Delivery expected March 2009- Completed
    • Shams Ar Riyadh
    • Shams ArRiyadhShams ArRiyadh• Land Area 5.0ml m²• 2608 Villas• 17,000 m² of neighborhood retail• 2,000,000 m² of commercial & retail• 439,000 m² of public amenity• Estimated Cost SR 6.52 Billion
    • Shams Master Plan
    • Marketing Hoarding/ Landscaping at Main Entrance
    • Shams ArRiyadhShams ArRiyadh 6 Themes Najdi  Villa sizes range  400 - 425 m² Arabic  475 – 500 m² Santa Fe  600 m² Mediterranean Coastal/ Inland  Sales Program May 2009 Modern
    • Shams ArRiyadhShams ArRiyadh • Earthworks 96% complete • 8,300,000 m³ of engineered fill • Infrastructure to start April 2009 • Model Construction August 2009 • Vertical construction January 2010 • Last home delivery December 2012
    • Al Tilal
    • Al Tilal Al Tilal - Madinah 1 - Madinah• Land Area 2.2million m²  Villa sizes average 320m²• 499 Villas (Phase 1)  Construction Start August 2006  Last Villa completion Q4-2009-• 2 Themes Completed – Neo-Classic – Arabic
    • Al-Tilal Master Plan
    • Al Tilal- Madinah
    • Qasr Khozam Project Khozam Real Estate Development Company
    • Qasr KhozamLocation : Jeddah inner cityArea : 4.13 million m2BUA : 25 million m2Status : Master planning & Infrastructure DesignConstruction Start : Q4 2010Expected completion : Q3 2015Estimated Cost: 11.9 billion
    • Khozam Real Estate Development Company
    • 1 2 3 4
    • Shams al Arous
    • Shams al ArousShams al Arous is the next Large scale mixed use Master Plan community to be developed by Dar Al Arkan• Shams al Arous will be built on 2.8 million square meter site located in the east side of Jeddah.• Strategically located less than 15 km away from Jeddah Cornish, less than 4 km away from AlHaramain Ring Road and directly accessible on the 52 mt wide Palestine st.• Distinguished by its beautiful topography, pleasant climate and its neighbourhood social functional distribution.
    • Shams al Arous• Shams al Arous development is valued at SR 10 billion investment.• The project is anticipated to embody 12,000 residential units (including a well studied mix of Villas and multi story Apartment Buildings – all with the various sizes).• In addition, the development shall have all the necessary Community facilities including; Mall, Offices buildings, Health and Educational facilities, as well as, the Main Commercial Road and Shopping centres.• The project is planned to be executed within a period of 5 to 7 years, basic Infrastructure is in place and ready for vertical construction.
    • Shams al Arous
    • THANK YOU Development Overview 2011