Al Qasr Mall Feb2012
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
859
On Slideshare
847
From Embeds
12
Number of Embeds
2

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 12

http://www.linkedin.com 7
https://www.linkedin.com 5

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Al Qasr Mall Project‫مشاريع دار الركان‬ 20th Feb. 2012
  • 2. Al-Qasr Plan
  • 3. Al Qasr Shopping Centre Lead Architect: Albert Speer & Partners Lead Consultant: Saudi Diyar Main Contractor: Saudi Constructioneers 67,500 m² Land Area 215,000 m² of BUA 76,489.6 m² of Leasable Area 368 Shop/Store 1756 Parking Capacity Construction Start: May 2008 Expected completion: 31st Jan 2012
  • 4. Current Status of PackagesPkg 6A: SAUDICO- Structural Works Work In Place 100% Forecast Completion Date 17-Dec-09Pkg 6B: SAUDICO- Finishes & MEP Works Work In Place 98.8% Forecast Completion Date 15-Feb-12Pkg 6C: Al Ojaimi- Substation & Cable Works Work In Place 100% Forecast Completion Date 30-Oct-11Project Total of completion all packages: 99.6%
  • 5. Critical Milestones to Achieve Completion DateAll Construction Works Completed on or before- 15 Feb 2012Energize Transformer Rooms- 30 Oct 2011 ( Done)Telephone Cables and Cabinet- all material delivered & partially installed.Way finding mock up approval : 04.01.12, 45days for installation after releasing LOI.Balance of the interior design packages in ProcessElectrical Panel Boards Delivery- 100 % delivered.Execution of the STC Contract Agreement- awaiting SignatureFinalizing Al Shaya requirementsFinalizing the A/C requirements for the StoresFinalizing The Food Court Requirement (GAS)Epoxy Paint- Ground Floor painting
  • 6. PROJECT: AL QASR MALLLIST OF POTENTIAL ADDITIONAL WORKS SN Description Rough Estimated Cost Duration Remarks 1 Fun Zone (Part A) - Waterproofing Awaiting SCE Cost Awaiting SCE Cost from conceptual drawing 2 Drop Off area provided by SDC 3 Additional Parking Areas (at North East) Awaiting SCE Cost SR 649,982 - cost from Supplier/contractor (AL ROWAFED Est), Excluding Civil works 4 LPG Central Tank & Services 649,982.00 2 months which still awaiting from SCE 5 Additional HVAC works for Tenant (AL SHAYAH) 6,000,000.00 9 months As proposed by SCE 6 Water and Drainage for 17 shops 590,150.00 10 weeks (2.5 month) As proposed by SCE * includes 1month design period of SDC * SDC awaiting DAARs instruction to provide 7 Additional 4 nos. Panoramic Elevator 12 Months the design.
  • 7. Tenant Submitted Handed Handed Over to Fit Out Design Total HO To Over to Fit-Out In Process of DAAR-PM with Drawings Total DAAR-PM (or Tenant with Works Floor Handing Over No for DAAR Approval (1) skipped) No Further Started (2) Tenant Action but Did Not Start Fit- (3) Action (7) (4) Out Works (5) (6)Ground Floor 54 2 52 44 2 1 5 First Floor 79 2 77 22 8 0 47Second Floor 91 1 90 66 4 0 20 Third Floor 140 84 56 38 8 1 9TOTAL 364 89 275 170 22 2 81 Area of Fit out on board Total Leasable Area M2 Percentage achieved M2 33793 76489.6 44.18%
  • 8. THE KEY PRE-OPENING TASKS NEEDED TO BE COMPLETED PRIOR TO THE MALL OPENING
  • 9. Al Qasr Mall Project‫مشاريع دار الركان‬ Thank You