Al Qasr Mall Feb2012

  1. 1. Al Qasr Mall Project‫مشاريع دار الركان‬ 20th Feb. 2012
  2. 2. Al-Qasr Plan
  3. 3. Al Qasr Shopping Centre Lead Architect: Albert Speer & Partners Lead Consultant: Saudi Diyar Main Contractor: Saudi Constructioneers 67,500 m² Land Area 215,000 m² of BUA 76,489.6 m² of Leasable Area 368 Shop/Store 1756 Parking Capacity Construction Start: May 2008 Expected completion: 31st Jan 2012
  4. 4. Current Status of PackagesPkg 6A: SAUDICO- Structural Works Work In Place 100% Forecast Completion Date 17-Dec-09Pkg 6B: SAUDICO- Finishes & MEP Works Work In Place 98.8% Forecast Completion Date 15-Feb-12Pkg 6C: Al Ojaimi- Substation & Cable Works Work In Place 100% Forecast Completion Date 30-Oct-11Project Total of completion all packages: 99.6%
  5. 5. Critical Milestones to Achieve Completion DateAll Construction Works Completed on or before- 15 Feb 2012Energize Transformer Rooms- 30 Oct 2011 ( Done)Telephone Cables and Cabinet- all material delivered & partially installed.Way finding mock up approval : 04.01.12, 45days for installation after releasing LOI.Balance of the interior design packages in ProcessElectrical Panel Boards Delivery- 100 % delivered.Execution of the STC Contract Agreement- awaiting SignatureFinalizing Al Shaya requirementsFinalizing the A/C requirements for the StoresFinalizing The Food Court Requirement (GAS)Epoxy Paint- Ground Floor painting
  6. 6. PROJECT: AL QASR MALLLIST OF POTENTIAL ADDITIONAL WORKS SN Description Rough Estimated Cost Duration Remarks 1 Fun Zone (Part A) - Waterproofing Awaiting SCE Cost Awaiting SCE Cost from conceptual drawing 2 Drop Off area provided by SDC 3 Additional Parking Areas (at North East) Awaiting SCE Cost SR 649,982 - cost from Supplier/contractor (AL ROWAFED Est), Excluding Civil works 4 LPG Central Tank & Services 649,982.00 2 months which still awaiting from SCE 5 Additional HVAC works for Tenant (AL SHAYAH) 6,000,000.00 9 months As proposed by SCE 6 Water and Drainage for 17 shops 590,150.00 10 weeks (2.5 month) As proposed by SCE * includes 1month design period of SDC * SDC awaiting DAARs instruction to provide 7 Additional 4 nos. Panoramic Elevator 12 Months the design.
  7. 7. Tenant Submitted Handed Handed Over to Fit Out Design Total HO To Over to Fit-Out In Process of DAAR-PM with Drawings Total DAAR-PM (or Tenant with Works Floor Handing Over No for DAAR Approval (1) skipped) No Further Started (2) Tenant Action but Did Not Start Fit- (3) Action (7) (4) Out Works (5) (6)Ground Floor 54 2 52 44 2 1 5 First Floor 79 2 77 22 8 0 47Second Floor 91 1 90 66 4 0 20 Third Floor 140 84 56 38 8 1 9TOTAL 364 89 275 170 22 2 81 Area of Fit out on board Total Leasable Area M2 Percentage achieved M2 33793 76489.6 44.18%
  8. 8. THE KEY PRE-OPENING TASKS NEEDED TO BE COMPLETED PRIOR TO THE MALL OPENING
  9. 9. Al Qasr Mall Project‫مشاريع دار الركان‬ Thank You