0
• work experience

• technical qualifications




                                                         overview
• proj...
experience
BWBR Architects                        Project Architect/ Project Manager
Saint Paul, MN, 2004-08              ...
qualifications
summary of technical skills

     •over 15 years of professional work experience




                      ...
projects/ bwbr
Project cost:       $2 million in two phases.




                                                         ...
alan d‟souza
resume overview
april 2009




                  projects/ bwbr
                  monticello cancer
         ...
alan d‟souza
resume overview
april 2009




                  projects/ bwbr
                  memorial blood center,
    ...
projects/ bwbr
Project cost:       $6 million construction




                                                           ...
projects/ bwbr
                                                                                      church, saint paul, m...
alan d‟souza
resume overview
april 2009




                  projects/ kke
                  shoppes of arbor lakes,
    ...
representative
• Monticello Cancer Center
            Monticello, MN
      • BWBR Architects
• Regina Medical Center
     ...
sustainable
•Project Administrator for two projects
attempting LEED-EB, OM certification

•successfully marketed clients i...
LEED Project Administrator

     •Allan L. Schuman Corporate Campus, Eagan
          •LEED services marketed successfully
...
education
 Master of Architecture
      June 2000     University of Minnesota, MN

      Thesis: A search for a relevant a...
• Idea Box
     • conceived




                                                             experience
     • digital int...
• Center for Victims of Torture
    • direct client contact
    • speaker‟s bureau




                                   ...
Upcoming SlideShare
Loading in...5
×

Alan D Souza Overview

1,052

Published on

Alan D\'Souza resume overview

Published in: Design, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,052
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Alan D Souza Overview"

  1. 1. • work experience • technical qualifications overview • projects • representative projects • list of representative healthcare projects • sustainable design • LEEDTM • performance design • education • other relevant experience • volunteer work alan d‟souza resume overview april 2009
  2. 2. experience BWBR Architects Project Architect/ Project Manager Saint Paul, MN, 2004-08 Education and Worship Health-care Sustainability KKE Architects, Inc. Project Architect/ Project Coordinator Minneapolis, MN, 2001-2003 Commercial-Retail Education Miller-Dunwiddie-Assoc. Project Architect work Minneapolis, MN, 1994-2001 Industrial Commercial Restoration Multi-fly. housing H. G. Malkani, Architects Architect , Code review Bombay, India, 1990-1991 Hospitality Schematic design Multi-fly. housing, planning and development Chandrashekhar & Bhagat Architect Bombay, India, 1989-1990 Commercial Schematic design, Construction documents Multi-fly. housing The Planning Group Intern Architect Bombay, India, 1989 Single and Multi-fly. housing Industrial alan d‟souza resume overview april 2009
  3. 3. qualifications summary of technical skills •over 15 years of professional work experience technical • experienced in delivering complete, accurate and coordinated construction documents • over 4 years in BWBR Architects, a firm that specializes in Healthcare design • professionally registered in MN • trained in Revit • over 15 years AutoCAD proficiency • advanced Xcel skills • basic Wordprocessing skills • advanced Powerpoint skills • basic knowledge of 3D computer modeling and graphic design alan d‟souza resume overview april 2009
  4. 4. projects/ bwbr Project cost: $2 million in two phases. center, monticello, mn Lower level of a MOB under separate contract. monticello cancer Responsibilities: Project Architect Contractor: RJM Construction Developers: Frauenshuh Permit drawings: Early issue Phase I: Radiation Oncology Vault Phase II: Interior Build-out Medical Oncology/ Chemotherapy Radiation Oncology/ Radiation therapy Opened on time (Sep ’08) and within budget. Very favorable owner reviews. Mech Enggr: Dunham Engineering Electrical Enggr: Dunham Engineering Structural Enggr: Meyer, Borgman & Johnson alan d‟souza resume overview april 2009
  5. 5. alan d‟souza resume overview april 2009 projects/ bwbr monticello cancer center, monticello, mn
  6. 6. alan d‟souza resume overview april 2009 projects/ bwbr memorial blood center, woodbury, mn
  7. 7. projects/ bwbr Project cost: $6 million construction center, rosemount, mn st. joseph’s education Responsibilities: PA/PM Project scope: 46,000SF, 2 levels in two phases. K-8 10 classrooms, Social hall Geo-Exchange system, Fabcon panel exterior wall system Phase I: Site, structure (building envelope), October 2008 Phase II: Building Interior buildout, interior finishes Projected completion/ occupancy: Aug/Sep 2009 Contractor: Greystone Construction Mech Enggr: Mechanical systems design , Harris/ Trak Electrical Enggr: Wunderlich- Malec Structural Enggr: Meyer, Borgman & Johnson Civil Enggr: Kimley-Horn Food Service: Robert Rippe alan d‟souza resume overview april 2009
  8. 8. projects/ bwbr church, saint paul, mn lumen christi catholic In the Fall of 1997, Highland The Church was reopened on Catholic School began a Holy Saturday March 26, 2005 capital campaign that was under the parish‟s new name successful in raising over “Lumen Christi.” The new parish $1.6 million. The funds were center for Lumen Christi was used to renovate the school formally opened on February 11, building, making it safer, 2006. It was dedicated by more accessible, Archbishop Harry J. Flynn on April and better adapted to new 23, 2006. All parish activities now directions in education. The take place at the Lumen Christi school also added a third site. kindergarten class that year, reflecting the increasing demand for quality Catholic education. alan d‟souza resume overview april 2009
  9. 9. alan d‟souza resume overview april 2009 projects/ kke shoppes of arbor lakes, maple grove, mn
  10. 10. representative • Monticello Cancer Center Monticello, MN • BWBR Architects • Regina Medical Center Endoscopy/ Emergency Department/ projects/ Medical Surgery Addition & Remodel Hastings, MN • BWBR Architects healthcare • Memorial Blood Center Woodbury, MN • BWBR Architects • Gillette Children’s Central Fabrication New Brighton, MN • BWBR Architects • Regions Hospital ED Triage Saint Paul, MN • BWBR Architects • Regions Hospital Morgue Remodel Saint Paul, MN • BWBR Architects • Fairview University Medical Clinic Pharmacy Minneapolis, MN • Miller-Dunwiddie Architects alan d‟souza resume overview april 2009
  11. 11. sustainable •Project Administrator for two projects attempting LEED-EB, OM certification •successfully marketed clients interested in LEED certification design •organized and ran the Green Design Forum: an in-house education and knowledge- dissemination forum that invited speakers from within the office and experts from outside to focus on sustainable efforts. •member of Performance Design Group •designed and executed the Performance Design checklist to be used on every project •USGBC national and regional liaison for BWBR •LEED- EB and LEED-EBOM resource within office alan d‟souza resume overview april 2009
  12. 12. LEED Project Administrator •Allan L. Schuman Corporate Campus, Eagan •LEED services marketed successfully •220,000SF •70,000 Lab, rest Office •LEED-EB •submitted for 57 Points (Gold) LEEDTM •November 2008 •Lawson Commons, Saint Paul •LEED services marketed successfully •200,000 SF •Office •LEED-EBOM •Saint Mary’s Regional Health Center, Detroit Lakes •Marketed •LEED-CI LEED-EB Technical Review workshop USGBC, Saint Paul, 2007 alan d‟souza resume overview april 2009
  13. 13. education Master of Architecture June 2000 University of Minnesota, MN Thesis: A search for a relevant and evocative architecture for urban India. Bachelor of Architecture June 1989 University of Bombay, India Thesis: A cultural center for Ambernath, a satellite town of Bombay. alan d‟souza resume overview april 2009
  14. 14. • Idea Box • conceived experience • digital interactive feedback to further the aim of Continuous Improvement • chaired the Idea Box Committee for 2 yrs relevant • Visiting critic for undergraduate design juries University of MN, College of Design other • Guest Lecturer „Resource efficiency‟, University of Minnesota, March 2009 • Teaching Assistant computer workshops, drawing and pre-thesis programming classes University of MN, College of Design • Research Assistant Mary Guzowski, Director, Daylighting Center, University of MN alan d‟souza resume overview april 2009
  15. 15. • Center for Victims of Torture • direct client contact • speaker‟s bureau volunteer • keynote speaker (scheduled) for the Cultural Diversity Committee, Mankato State University • story-gathering group • moderator of speaker panels work • African Food Distribution • collection, packing of food, registration of and distribution to clients • Brooklyn Center, MN • Independent Futures Project • programming, space-planning • Habitat for Humanity • two projects in Minneapolis • KKE-Bannecker School Partnership • work directly with 6th grade inner-city students • Search for Shelter design charette • “Science house”: Child care facility, St. Paul, MN alan d‟souza resume overview april 2009
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×