Your SlideShare is downloading. ×
0
Clock Spring Intro
Clock Spring Intro
Clock Spring Intro
Clock Spring Intro
Clock Spring Intro
Clock Spring Intro
Clock Spring Intro
Clock Spring Intro
Clock Spring Intro
Clock Spring Intro
Clock Spring Intro
Clock Spring Intro
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Clock Spring Intro

463

Published on

Introductory presentation featuring the installation of a Clock Spring® pipe reinforcement and repair sleeve on a pipeline. Learn more about the company and its products at www.clockspring.com

Introductory presentation featuring the installation of a Clock Spring® pipe reinforcement and repair sleeve on a pipeline. Learn more about the company and its products at www.clockspring.com

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
463
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
7
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. www.clockspring.com
  • 2. Clock Spring® Repair System • Three part system o Composite coil • Pipe reinforcement • Uni-directional e-glass • Polyester base • Memory matrix o Adhesive o Filler • Load transfer • Easy and fast
  • 3. Specific Repairs Permitted• Corrosion defects (<80% through wall)• Blunt dent and gouge repairs• Girth weld zone repairs• Defects in field bends• Defect in elbow (>5D)• Arresting cracks (new pipe)• GRIWrap
  • 4. Clock Spring® InstallationThe entire sequence…..
  • 5. InstallationMark Clock Spring® location.
  • 6. Installation Mix and apply filler.
  • 7. InstallationApply starter pad and filler.
  • 8. InstallationApply adhesive to the pipe.
  • 9. InstallationStart winding Clock Spring®
  • 10. InstallationWind Clock Spring®, apply adhesive, 8 wraps.
  • 11. Installation Tighten and secure.
  • 12. InstallationCure (2 hours), re-coat, backfill.

×