Your SlideShare is downloading. ×
Go beyond job schedulng webcast part 1
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Go beyond job schedulng webcast part 1

704
views

Published on

Published in: Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
704
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
14
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. go beyond job scheduling: webcast series: part #1 October 20, 2010 Jim Anderson, VP Product Management Prabhakar Gopalan, Sr. Principal Product Marketing Manager
  • 2. speakers for today’s webcast Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. Jim Anderson VP Product Management Prabhakar Gopalan Sr. Principal Product Marketing
  • 3. today’s topics Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. 1) Introduction, a little about the webcast series 2) Discuss present day datacenter challenges 3) Overview of CA‟s vision for workload automation 4) CA Workload Automation – A quick look 5) Q&A
  • 4. “Go Beyond Job Scheduling” webcast series Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. http://www.ca.com/lpg/workload-automation-webcast-series All webcasts start at 11AM EDT Webcast #1: October 20, 2010 Technology trends in job scheduling to enable datacenter 2.0 Webcast #2: November 10, 2010 Workload Automation for the Cloud Webcast #3: December 8, 2010 Workload Automation for Applications Webcast #4: January 12, 2011 Replacing outdated job schedulers made easy Webcast #5: February 9, 2011 What’s New in CA Workload Automation? Today’s webcast Register for a chance to win a free iPad®* * Rules, restrictions, details will be available on webcast registration site
  • 5. today’s topics Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. 1) Introduction, a little about the webcast series 2) Discuss present day datacenter challenges 3) Overview of CA‟s vision for workload automation 4) CA Workload Automation – A quick look 5) Q&A
  • 6. 2003 - 2008 2008 - 2009 Previous Steady State Recession & Credit Crisis IT Budget & Resources New Normal Business IT Demand BOTTOM LINE: IT Needs a Game Changer Growing Alignment Gap …but business demand is outpacing IT budgets and resources – as well as traditional means of delivery IT needs to drive revenue Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved.
  • 7. Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. Infrastructure Optimization Automation and Orchestration Dynamic Datacenter Server Consolidation • Multi-vendor support • Patching • Compliance • Configuration management • Provisioning • Dependency mapping • Configuration standardization • Application deployment • Process orchestration • Self-service • Chargeback • Dynamic resource allocation • Application portability • Using scripts or vendor tools Automation phases IT is evolving to drive revenue
  • 8. Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. Dynamic Datacenter Job Scheduling Defined processes & IT centric Job Management Consolidated & pooled resources Workload Automation Cloud aware, dynamic resources & workloads Job scheduling too is evolving (to workload automation) as part of that datacenter transformation > Business oriented > Dynamic workload placement > Business event driven > Business & IT Integrated > Dynamic event driven > Dynamic infrastructure > Service-oriented > Application workloads > IT centric scheduling > Workload scheduling > Static workload placement > IT event driven job management But how?
  • 9. Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. Dynamic Datacenter Job Scheduling Defined processes & IT centric Job Management Consolidated & pooled resources Workload Automation Cloud aware, dynamic resources & workloads enablers for the transformation > Business oriented > Dynamic workload placement > Business event driven > Business & IT Integrated > Dynamic event driven > Dynamic infrastructure > Service-oriented > Application workloads > IT centric scheduling > Workload scheduling > Static workload placement > IT event driven job management Workload Automation as a Service 1 Application Automation & Optimization 2 Cloud Computing & Virtualization 3
  • 10. Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. Resource Pool Private Cloud 2. Increased workload triggers “Add More Capacity” workflow 4c. Provisioning Complete 5. Run Reports 1. Multiple end-users request end-of-qtr reports 4b. Add/Remove VMs 4a. Add/Remove Phy servers 3. Execute “Reconfigure Resource Pools” workflow 4d. Verify Configuration a simple datacenter use case – add computing to meet demand for guaranteed service level
  • 11. today’s topics Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. 1) Introduction, a little about the webcast series 2) Discuss present day datacenter challenges 3) Overview of CA‟s vision for workload automation 4) CA Workload Automation – A quick look 5) Q&A
  • 12. aligning the transformation requirements to CA’s workload automation solution Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved.
  • 13. aligning the transformation requirements to CA’s workload automation solution Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved.
  • 14. today’s topics Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. 1) Introduction, a little about the webcast series 2) Discuss present day datacenter challenges 3) Overview of CA‟s vision for workload automation 4) CA Workload Automation – A quick look 5) Q&A
  • 15. realizing it in CA Workload Automation Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. SOLUTION FEATURES BENEFITS – End-to-end Multiplatform Admin, Control, Visualization – Event driven Service Oriented Architecture – Intelligent Resource Management – Ease of use – Role based admin and reporting – Cloud and virtualization support – Tight process automation integration – Multi-platform Scheduling – Dynamic job control – Fault tolerance and recovery; HA – Resource Manager – Design, model, analyze – Critical path analysis and forecasting – Alert and Resolve – Extreme scalability – 50+ job types – Audit & compliance support – Consistent, reliable service delivery – Greater business response – Increased productivity & performance – Manage IT costs – Evolve to the next generation datacenter Application Workloads Event Triggers Enterprise Security Policy Management Web Services High Availability Service Management Virtualization & Cloud Workload Broker Cross Platform
  • 16. broad coverage for workload object types Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. - z/OS dataset - z/OS manual - z/OS job Mainframe z/OS Objects Utilities File Trigger FTP Transfer SNMP Subscribe SNMP Publish SNMP Get Attribute SNMP Set Attribute Monitoring CPU Monitoring Storage Monitoring IP Monitoring Process Monitoring Text File Monitoring Windows Eventlog Monitoring Windows Service Monitoring Agent Monitor Server Linux Unix Windows Tandem I5 OpenVMS MicroFocus (Oracle, SQL, DB2, etc…) Database Monitor Database Stored Procedure Database Trigger SQL Query Database Integrations EJB Session Bean JMX Subscribe Application Integrations & Events POJO RMI JMX Get Attribute EJB Entity Bean JMX Set Attribute JMX Invoke Operation JMS Publish JMS Subscribe Web Services object HTTP JMX Remove Instance JMX Create Instance Oracle Apps Request Set Single Request Peoplesoft SAP Batch Input Sessions B/W Infopackages B/W Process Chain Data Archiving SAP Event SAP Job Copy SAP Process Monitor SAP R3 ERP Apps Oracle Job Copy
  • 17. CA Workload Automation is part of CA Automation Suite accelerate your path to cloud agility, control and optimization Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. Agility Control Optimization
  • 18. today’s topics Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. 1) Introduction, a little about the webcast series 2) Discuss present day datacenter challenges 3) Overview of CA‟s vision for workload automation 4) CA Workload Automation – A quick look 5) Q&A
  • 19. register for the full webcast series to continue this conversation Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. http://www.ca.com/lpg/workload-automation-webcast-series All webcasts start at 11AM EDT Webcast #1: October 20, 2010 Technology trends in job scheduling to enable datacenter 2.0 Webcast #2: November 10, 2010 Workload Automation for the Cloud Webcast #3: December 8, 2010 Workload Automation for Applications Webcast #4: January 12, 2011 Replacing outdated job schedulers made easy Webcast #5 – Feb 9, 2011 What’s New in CA Workload Automation?  Next Webcast Register for a chance to win a free iPad®* * Rules, restrictions, details will be available on webcast registration site
  • 20. resources http://www.ca.com/us/workload-management.aspx Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved. Click „Handouts‟ menu in Livemeeeting Webcast Go Beyond Job Scheduling Series Product Brief CA Workload Automation Success Story Air Liquide optimizes processing of 22,000 daily IT jobs with CA Industry Analyst Report The Total Economic Impact™ Of CA Workload Automation White Paper Workload Automation for the Cloud Service Offering CA Workload Automation Rapid Implementation Blog: Automation and Virtualization User Community: Workload Automation Community
  • 21. thank you
  • 22. legal notice © Copyright CA 2010. All rights reserved. All trademarks, trade names, service marks and logos referenced herein belong to their respective companies. No unauthorized use, copying or distribution permitted. THIS PRESENTATION IS FOR YOUR INFORMATIONAL PURPOSES ONLY. CA assumes no responsibility for the accuracy or completeness of the information. TO THE EXTENT PERMITTED BY APPLICABLE LAW, CA PROVIDES THIS DOCUMENT “AS IS” WITHOUT WARRANTY OF ANY KIND, INCLUDING, WITHOUT LIMITATION, ANY IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, OR NONINFRINGEMENT. In no event will CA be liable for any loss or damage, direct or indirect, in connection with this presentation, including, without limitation, lost profits, lost investment, business interruption, goodwill, or lost data, even if CA is expressly advised of the possibility of such damages. Certain information in this presentation may outline CA‟s general product direction. This presentation shall not serve to (i) affect the rights and/or obligations of CA or its licensees under any existing or future written license agreement or services agreement relating to any CA software product; or (ii) amend any product documentation or specifications for any CA software product. The development, release and timing of any features or functionality described in this presentation remain at CA‟s sole discretion. Notwithstanding anything in this presentation to the contrary, upon the general availability of any future CA product release referenced in this presentation, CA may make such release available (i) for sale to new licensees of such product; and (ii) in the form of a regularly scheduled major product release. Such releases may be made available to current licensees of such product who are current subscribers to CA maintenance and support on a when and if- available basis. Go Beyond Job Scheduling Webcast #1 Copyright © 2010 CA. All rights reserved.