Your SlideShare is downloading. ×
Texas s ta r chart
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Texas s ta r chart

188

Published on

Published in: Education, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
188
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Texas STaR Chart 2009-2010 Results for Birnham Woods Elementary
  • 2. Introduction
    • What is the Texas STaR chart?
      • assessment tool developed around the four key areas of the Texas Long Range Plan for Technology (LRPT)
    • Texas STaR Chart
  • 3. Introduction
    • What is it used for?
      • To help teachers, campuses, and districts determine their progress towards district goals and LRPT goals
  • 4. Introduction
    • Why do I need to fill one out?
      • Technology Instruction is mandated by NCLB
      • All teachers must be technology literate
      • Results can be used for teachers to plan their professional development
  • 5. STaR Chart Key Areas
    • Key Area I: Teaching and Learning
      • Patterns of Classroom use
      • Frequency/Design of Instruction
      • Content Area Connections
      • Technology Applications (TA) TEKS Implementation
      • Online Learning
  • 6. STaR Chart Key Areas
    • Key Area II: Educator Preparation and Development
      • Professional Development Experiences
      • Models of Professional Development
      • Capabilities of Educators
      • Access to Professional Development
      • Levels of Understanding and Patterns of Use
      • Professional Development for Online Learning
  • 7. STaR Chart Key Areas
    • Key Area III: Leadership, Administration, and Instructional Support
      • Leadership and Vision
      • Planning
      • Instructional Support
      • Communication and Collaboration
      • Budget
      • Leadership and Support for Online Learning
  • 8. STaR Chart Key Areas
    • Key Area IV: Infrastructure for Technology
      • Students per Computers
      • Internet Access and Connectivity Speed
      • Other Classroom Technology
      • Technical Support
      • Local Area Network Wide Area Network
      • Distance Learning Capacity
  • 9. Campus Results
    • Birnham Woods Elementary
  • 10. 2009-2010 Results
  • 11. Campus Strengths
    • Infrastructure for Technology
      • Advanced Tech stage
    • Leadership, Administration, and Instructional Support
      • Advanced Tech stage
  • 12. Campus Weaknesses
    • Teaching and Learning
      • Developing Tech stage
    • Educator Preparation and Development
      • Developing Tech stage
  • 13. Summary and Recommendations
    • Teacher ratings should improve each year
    • Working towards Target Tech
    • Look for professional development in Teaching and Learning
    • Browse Moodle courses for professional development

×