Automotive Project Portfolio

793 views
707 views

Published on

Please review Southside Constructors, Inc.\'s Automotive Project Portfolio. Please contact us at dkellough@southsideco.com for further information.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
793
On SlideShare
0
From Embeds
0
Number of Embeds
20
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Automotive Project Portfolio

  1. 1. www.southsideco.com<br />
  2. 2. MEMBER OF: <br />THE U.S. GREEN <br />BUILDING COUNCIL<br />
  3. 3. Southside Constructors, Inc. Steps into the Driver’s, err, Erector’s Seat for Ford<br />Owner: Tindol Family Ltd Partnership<br />Area: 40,000 SF<br />Completion Date: 2001<br />Services Provided: Design Build, General Construction<br />Earl Tindol Ford<br />Southside Constructors, Inc. Puts the Pedal to the Metal for Toyota of Gastonia<br />Owner: Toyota of Gastonia<br />Area: 40,000 SF (Renovation), 20,000 SF (Addition)<br />Completion Date: 2007<br />Services Provided: General Construction<br />Toyota of Gastonia<br />
  4. 4. Southside Constructors, Inc. Goes Into Overdrive to Build New Suzuki Dealership<br />Donald Craig Suzuki - Mooresville<br />Owner: Automotive Properties<br />Area: 20,000 SF<br />Completion Date: 2006<br />Services Provided: General Construction<br />Southside Constructors, Inc. Spins its Wheels at Atlantic Ford<br />Atlantic Ford<br />Owner: JRAT, LLC <br />Area: 34,600 SF<br />Completion Date: 2008<br />Services Provided: General Construction<br />
  5. 5. Southside Constructors, Inc. Goes Into Overdrive to Build <br />another New Suzuki Dealership in Charlotte<br />Owner: DCM Properties <br />Area: 20,000 SF<br />Completion Date: 2007<br />Services Provided: Design-Build, General Construction<br />Donald Craig Suzuki - Charlotte<br />Southside Constructors, Inc. Switches Gears for Suzuki Orlando<br />Donald Craig Suzuki - Orlando<br />Owner: Automotive Properties of Orlando, LLC Area: 21,000 SF<br />Completion Date: 2008 Services Provided: Design-Build, General Construction<br />
  6. 6. Southside Constructors, Inc. Goes South for another Suzuki Project<br />Owner: JD 2201, LLC <br />Area: 22,000 SF<br />Completion Date: 2007<br />Services Provided: General Construction<br />Johnny’s Suzuki -Conway<br />Johnny’s Suzuki Selects Southside Constructors, Inc. <br />to Build Second Automotive Retail Facility<br />Johnny’s Suzuki -Easley<br />Owner: JD 2201, LLC Area: 22,000 SF<br />Completion Date: 2008 Services Provided: Design-Build, General Construction<br />
  7. 7. Southside Constructors, Inc. Cruises over to McKenney Dodge<br />McKenney Dodge<br />Owner: McKenney Dodge, LLC<br />Area:55,000 SF (Renovation) / 1,000 SF (Addition)<br />Completion Date: 2007<br />Services Provided: General Construction / Design-Build<br />Southside Constructors, Inc. Hits the Road <br />for Another Project at Tindol Ford-Lincoln-Mercury<br />Earl Tindol Ford-Lincoln-Mercury<br />Owner: Tindol Ford<br />Area: 27,478 SF <br />Completion Date: 2008<br />Services Provided: General Construction / Upfit<br />
  8. 8. Southside Constructors, Inc. Goes Hog Wild With Carolina Harley Davidson!<br />Carolina Harley Davidson<br />Owner: Carolina Harley Davidson<br />Area:58,000 SF<br />Completion Date: 2002<br />Services Provided: General Construction <br />Southside Constructors, Inc. Gears Up<br />to Build McKenney-Salinas Honda Power Sports<br />McKenney-Salinas Honda Power Sports<br />Owner: Sal Ray Properties Area: 8,368 SF<br />Completion Date: 2008 Services Provided: General Construction<br />
  9. 9. General Contracting sPre-Construction Services<br />Construction ManagementsProgram Management<br />From Beginning to End. <br />From Inception to Completion.<br />For additional information please contact <br />Darryl Kellough at dkellough@southsideco.com<br />2033 Cross Beam Drive  Charlotte, NC 28217<br />Phone: 704-825-8881  Fax: 704-825-8582<br />www.southsideco.com<br />

×