1. Most Significant
IN Asia Today
L
Malaysia
Malaysia MRT Corp.
9.5 kilometers
USD 3.8 Billion
2016
KL Metro
LATEST BUZZ:
Kuala Lumpur’s new Klang Valley Mass Rapid Transit
line of 51km and 35 stations has an estimated total
cost of approximately US$16 billion, of which, the
tunneling contract is the single largest package.
SINGAPORE CABLE TUNNEL
LATEST BUZZ:
The Rohtang tunnel is a very challenging project.
There are more than 46 avalanche sites on
approaches to the tunnel and excavation will be
done from both ends using Drill & Blast with NATM
methodology. When completed, the Rohtang tunnel
is set to become the world longest tunnel at an
altitude above 3,000m.
L Singapore
SGD 2 Billion
SP PowerGrid,
a subsidiary of
Singapore Power
16.5km East-West Tunnel
and 18.5km North-South
Tunnel
East-West tunnel – 2017
North-South tunnel - 2018
Rohtang Tunnel
LATEST BUZZ:
The 60m deep cable tunnels will form the backbone
of Singapore's power supply, serving future
generations effectively, securely and with minimum
inconvenience. It is expected to improve standards of
living and performance for residential, industrial and
commercial consumers
L India
USD 320 million
2015
Indian Government
8.8 kilometers
Jammu Udhampur Srinagar Baramulla Railway Link (JUSBRL)
LATEST BUZZ:
The JUSBRL project could easily be described as one of the biggest
and most challenging railway project in the world. It boasts of many
firsts including:
• The Longest Transport Tunnel In the Country (11km)
• Deepest ‘Drill holes’ for Geotechnical Investigations 640m
• First Large Scale use of ‘New Austrian Tunneling Method (NATM)
in India
• First Use of ‘Road header’ for ‘Tunnel Excavation’ in Railway
Tunneling
L India
USD 13 Billion
Government of India
345 kilometers
Hong Kong Section of Guangzhou-Shenzhen-Hong Kong Express Rail Link (XRL
LATEST BUZZ:
The government projects that the XRL will carry
about 100,000 passengers daily in 2020 and
120,000 passengers in 2030, generating an
economic benefit of $83 billion over the next 50
years.
L Hong Kong
USD 5 Billion
2015
MTR Corporation
Limited
26 kilometers
Bangkok Metro
LATEST BUZZ:
• There will be 17 stations along the route, 4 of which will
be underground (in Hua Lamphong- Bang Khae Section)
and the rest will be elevated. The system will be capable
to serve more than 50,000 passengers/hour/direction.
• There will be 17 stations along the route, 14 of which will
be underground whereas, the rest will be elevated. The
system will be capable to serve more than 50,000
passengers/hour/direction.
• There will be 30 stations along the route, 11 of which will
be underground and the rest will be elevated. The system
will have a service capacity of more than 50,000
passengers/hour/direction.
L Thailand
Mass Rapid Transit
Authority of Thailand
BLUE LINE:
27 kilometers
USD 1,532 Million
PURPLE LINE:
40 kilometers
USD 2,199 Million
ORANGE LINE:
24 kilometers
USD 1,704 Million
Tunnels Asia 2013 explores Best Practices in Geotechnical
Investigation, Construction & Risk Management for Asia’s Tunnel
Infrastructure. Attend the conference and get a rare opportunity
to hear exclusive case studies from the biggest and most challeng-
ing underground projects in Asia including:
• KL Metro, Malaysia
• Bangkok Metro
• MRT Jakarta
• Cable Tunnel Singapore
To find out more, visit www.tunneldesignconstruction.com
To attend the conference, email enquiry@iqpc.com.sg
or call +65 6722 9388.
• JUSB Railway Link, India
• XRL Hong Kong
• Rohtang Tunnel, India
Disclaimer:
Please note that we do all we can to ensure accuracy and timeliness of the information
presented herein but errors may still understandably occur in some cases. If you
believe that a serious inaccuracy has been made please let us know. This infograph is
provided for information purposes only. IQPC accepts no responsibility whatsoever for
any direct or indirect losses arising from the use of this report or its contents.
References:
http://www.railway-technology.com/projects/kashmir-railway/
http://en.wikipedia.org/wiki/Guangzhou%E2%80%93Shen-
zhen%E2%80%93Hong_Kong_Express_Rail_Link_Hong_Kong_section
http://en.wikipedia.org/wiki/Kashmir_Railway
http://www.railway-technology.com/projects/kashmir-railway/
http://tunneltalk.com/Kuala-Lumpur-MRT-Mar12-MMC-Gamu-
da-wins-Kuala-Lumpur-MRT.php
http://en.wikipedia.org/wiki/MRT_(Bangkok)
http://en.wikipedia.org/wiki/MRT_Purple_Line
http://en.wikipedia.org/wiki/MRT_Orange_Line
http://www.skyscrapercity.com/showthread.php?t=594526
http://en.wikipedia.org/wiki/Rohtang_Pass
http://tunneltalk.com/Kuala-Lumpur-MRT-Mar12-MMC-Gamu-
da-wins-Kuala-Lumpur-MRT.php
http://www.mrta.co.th/eng/project/project_.htm
http://www.tunneltalk.com/Kuala-Lum-
pur-MRT-Nov11-Five-vie-for-underground-works.php
MRT JAKARTA
LATEST BUZZ:
The tender process has already begun for six out of
the eight work projects — three for underground
work and three for elevated work. The three projects
related to the underground work, have a total value
of $470 million.
Indonesia
Local Government
of Jakarta
110.8 km (23.8 km for the
North-South Corridor and
87 km for East-West Corridor)
Phase I – 2016
Phase II - 2018
L