Most Significant
IN Asia Today
L
Malaysia
Malaysia MRT Corp.
9.5 kilometers
USD 3.8 Billion
2016
KL Metro
LATEST BUZZ:
Kuala Lumpur’s new Klang Valley Mass Rapid Transit
line of 51km and 35 stations has an estimated total
cost of approximately US$16 billion, of which, the
tunneling contract is the single largest package.
SINGAPORE CABLE TUNNEL
LATEST BUZZ:
The Rohtang tunnel is a very challenging project.
There are more than 46 avalanche sites on
approaches to the tunnel and excavation will be
done from both ends using Drill & Blast with NATM
methodology. When completed, the Rohtang tunnel
is set to become the world longest tunnel at an
altitude above 3,000m.
L Singapore
SGD 2 Billion
SP PowerGrid,
a subsidiary of
Singapore Power
16.5km East-West Tunnel
and 18.5km North-South
Tunnel
East-West tunnel – 2017
North-South tunnel - 2018
Rohtang Tunnel
LATEST BUZZ:
The 60m deep cable tunnels will form the backbone
of Singapore's power supply, serving future
generations effectively, securely and with minimum
inconvenience. It is expected to improve standards of
living and performance for residential, industrial and
commercial consumers
L India
USD 320 million
2015
Indian Government
8.8 kilometers
Jammu Udhampur Srinagar Baramulla Railway Link (JUSBRL)
LATEST BUZZ:
The JUSBRL project could easily be described as one of the biggest
and most challenging railway project in the world. It boasts of many
firsts including:
• The Longest Transport Tunnel In the Country (11km)
• Deepest ‘Drill holes’ for Geotechnical Investigations 640m
• First Large Scale use of ‘New Austrian Tunneling Method (NATM)
in India
• First Use of ‘Road header’ for ‘Tunnel Excavation’ in Railway
Tunneling
L India
USD 13 Billion
Government of India
345 kilometers
Hong Kong Section of Guangzhou-Shenzhen-Hong Kong Express Rail Link (XRL
LATEST BUZZ:
The government projects that the XRL will carry
about 100,000 passengers daily in 2020 and
120,000 passengers in 2030, generating an
economic benefit of $83 billion over the next 50
years.
L Hong Kong
USD 5 Billion
2015
MTR Corporation
Limited
26 kilometers
Bangkok Metro
LATEST BUZZ:
• There will be 17 stations along the route, 4 of which will
be underground (in Hua Lamphong- Bang Khae Section)
and the rest will be elevated. The system will be capable
to serve more than 50,000 passengers/hour/direction.
• There will be 17 stations along the route, 14 of which will
be underground whereas, the rest will be elevated. The
system will be capable to serve more than 50,000
passengers/hour/direction.
• There will be 30 stations along the route, 11 of which will
be underground and the rest will be elevated. The system
will have a service capacity of more than 50,000
passengers/hour/direction.
L Thailand
Mass Rapid Transit
Authority of Thailand
BLUE LINE:
27 kilometers
USD 1,532 Million
PURPLE LINE:
40 kilometers
USD 2,199 Million
ORANGE LINE:
24 kilometers
USD 1,704 Million
Tunnels Asia 2013 explores Best Practices in Geotechnical
Investigation, Construction & Risk Management for Asia’s Tunnel
Infrastructure. Attend the conference and get a rare opportunity
to hear exclusive case studies from the biggest and most challeng-
ing underground projects in Asia including:
• KL Metro, Malaysia
• Bangkok Metro
• MRT Jakarta
• Cable Tunnel Singapore
To find out more, visit www.tunneldesignconstruction.com
To attend the conference, email enquiry@iqpc.com.sg
or call +65 6722 9388.
• JUSB Railway Link, India
• XRL Hong Kong
• Rohtang Tunnel, India
Disclaimer:
Please note that we do all we can to ensure accuracy and timeliness of the information
presented herein but errors may still understandably occur in some cases. If you
believe that a serious inaccuracy has been made please let us know. This infograph is
provided for information purposes only. IQPC accepts no responsibility whatsoever for
any direct or indirect losses arising from the use of this report or its contents.
References:
http://www.railway-technology.com/projects/kashmir-railway/
http://en.wikipedia.org/wiki/Guangzhou%E2%80%93Shen-
zhen%E2%80%93Hong_Kong_Express_Rail_Link_Hong_Kong_section
http://en.wikipedia.org/wiki/Kashmir_Railway
http://www.railway-technology.com/projects/kashmir-railway/
http://tunneltalk.com/Kuala-Lumpur-MRT-Mar12-MMC-Gamu-
da-wins-Kuala-Lumpur-MRT.php
http://en.wikipedia.org/wiki/MRT_(Bangkok)
http://en.wikipedia.org/wiki/MRT_Purple_Line
http://en.wikipedia.org/wiki/MRT_Orange_Line
http://www.skyscrapercity.com/showthread.php?t=594526
http://en.wikipedia.org/wiki/Rohtang_Pass
http://tunneltalk.com/Kuala-Lumpur-MRT-Mar12-MMC-Gamu-
da-wins-Kuala-Lumpur-MRT.php
http://www.mrta.co.th/eng/project/project_.htm
http://www.tunneltalk.com/Kuala-Lum-
pur-MRT-Nov11-Five-vie-for-underground-works.php
MRT JAKARTA
LATEST BUZZ:
The tender process has already begun for six out of
the eight work projects — three for underground
work and three for elevated work. The three projects
related to the underground work, have a total value
of $470 million.
Indonesia
Local Government
of Jakarta
110.8 km (23.8 km for the
North-South Corridor and
87 km for East-West Corridor)
Phase I – 2016
Phase II - 2018
L

More Related Content

What's hot

DFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysDFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysAbeer Ray
 
Metro Rail in Dhaka City
Metro Rail in Dhaka CityMetro Rail in Dhaka City
Metro Rail in Dhaka CityAriful Islam
 
Monorail Presentation
Monorail PresentationMonorail Presentation
Monorail PresentationEshu Kumar
 
Monorail Mumbai
Monorail MumbaiMonorail Mumbai
Monorail MumbaiSahim Khan
 
Defining public transport routes for tod 8 october 2013 daisy dwango
Defining public transport routes for tod 8 october 2013 daisy dwangoDefining public transport routes for tod 8 october 2013 daisy dwango
Defining public transport routes for tod 8 october 2013 daisy dwangoReaVaya_KM
 
BP 2013 UFT Presentation Stage3 - Team Stokes
BP 2013 UFT  Presentation Stage3 - Team StokesBP 2013 UFT  Presentation Stage3 - Team Stokes
BP 2013 UFT Presentation Stage3 - Team StokesGovinda Hosein
 
Malaysia Logistics
Malaysia LogisticsMalaysia Logistics
Malaysia LogisticsYAU MEE LIM
 
G03502033039
G03502033039G03502033039
G03502033039theijes
 
Recent infrastructural development in bangladesh and it’s impact on economy
Recent infrastructural development in bangladesh and it’s impact on economyRecent infrastructural development in bangladesh and it’s impact on economy
Recent infrastructural development in bangladesh and it’s impact on economyTanu Kirttania
 
SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016Norma Nun
 

What's hot (15)

DFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysDFC Decongesting Indian Railways
DFC Decongesting Indian Railways
 
Metro Rail in Dhaka City
Metro Rail in Dhaka CityMetro Rail in Dhaka City
Metro Rail in Dhaka City
 
Monorail Presentation
Monorail PresentationMonorail Presentation
Monorail Presentation
 
Monorail Mumbai
Monorail MumbaiMonorail Mumbai
Monorail Mumbai
 
PPT on Monorail
PPT on MonorailPPT on Monorail
PPT on Monorail
 
Defining public transport routes for tod 8 october 2013 daisy dwango
Defining public transport routes for tod 8 october 2013 daisy dwangoDefining public transport routes for tod 8 october 2013 daisy dwango
Defining public transport routes for tod 8 october 2013 daisy dwango
 
BP 2013 UFT Presentation Stage3 - Team Stokes
BP 2013 UFT  Presentation Stage3 - Team StokesBP 2013 UFT  Presentation Stage3 - Team Stokes
BP 2013 UFT Presentation Stage3 - Team Stokes
 
Traffic model
Traffic modelTraffic model
Traffic model
 
Malaysia Logistics
Malaysia LogisticsMalaysia Logistics
Malaysia Logistics
 
G03502033039
G03502033039G03502033039
G03502033039
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
summary of rail & wind power projects
summary of rail & wind power projectssummary of rail & wind power projects
summary of rail & wind power projects
 
Recent infrastructural development in bangladesh and it’s impact on economy
Recent infrastructural development in bangladesh and it’s impact on economyRecent infrastructural development in bangladesh and it’s impact on economy
Recent infrastructural development in bangladesh and it’s impact on economy
 
SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016
 
CELLULAR AUTOMATA TRAFFIC FLOW MODEL
CELLULAR AUTOMATA TRAFFIC FLOW MODELCELLULAR AUTOMATA TRAFFIC FLOW MODEL
CELLULAR AUTOMATA TRAFFIC FLOW MODEL
 

Viewers also liked

Taipei mrt daan park station (台北捷運 大安森林公園站)
Taipei mrt daan park station (台北捷運 大安森林公園站)Taipei mrt daan park station (台北捷運 大安森林公園站)
Taipei mrt daan park station (台北捷運 大安森林公園站)Chung Yen Chang
 
Commuter Rail System
Commuter Rail SystemCommuter Rail System
Commuter Rail SystemAminima12
 
TB SIMATUPANG
TB SIMATUPANGTB SIMATUPANG
TB SIMATUPANGB SUGANDI
 
[Urban transportation policy program] action plan jakarta
[Urban transportation policy program] action plan jakarta[Urban transportation policy program] action plan jakarta
[Urban transportation policy program] action plan jakartashrdcinfo
 
[Urban transportation policy program]city paper presentation jakarta
[Urban transportation policy program]city paper presentation jakarta[Urban transportation policy program]city paper presentation jakarta
[Urban transportation policy program]city paper presentation jakartashrdcinfo
 
Moud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_udMoud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_udUttipec Dda
 
Rapid KL Transport System
Rapid KL Transport System Rapid KL Transport System
Rapid KL Transport System Yousef Abujubba
 

Viewers also liked (11)

Taipei mrt daan park station (台北捷運 大安森林公園站)
Taipei mrt daan park station (台北捷運 大安森林公園站)Taipei mrt daan park station (台北捷運 大安森林公園站)
Taipei mrt daan park station (台北捷運 大安森林公園站)
 
1 issues and priorities rli final
1 issues and priorities rli final1 issues and priorities rli final
1 issues and priorities rli final
 
David overington bus improvement project june 14 2011
David overington bus improvement project june 14 2011David overington bus improvement project june 14 2011
David overington bus improvement project june 14 2011
 
Respondents' Viewpoint on MRT Project in Jakarta 2013
Respondents' Viewpoint on MRT Project in Jakarta 2013Respondents' Viewpoint on MRT Project in Jakarta 2013
Respondents' Viewpoint on MRT Project in Jakarta 2013
 
Commuter Rail System
Commuter Rail SystemCommuter Rail System
Commuter Rail System
 
TB SIMATUPANG
TB SIMATUPANGTB SIMATUPANG
TB SIMATUPANG
 
[Urban transportation policy program] action plan jakarta
[Urban transportation policy program] action plan jakarta[Urban transportation policy program] action plan jakarta
[Urban transportation policy program] action plan jakarta
 
[Urban transportation policy program]city paper presentation jakarta
[Urban transportation policy program]city paper presentation jakarta[Urban transportation policy program]city paper presentation jakarta
[Urban transportation policy program]city paper presentation jakarta
 
Moud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_udMoud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_ud
 
Rapid KL Transport System
Rapid KL Transport System Rapid KL Transport System
Rapid KL Transport System
 
Singapore MRT
Singapore MRTSingapore MRT
Singapore MRT
 

Similar to Tunnels infographic

7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]Darwin Jayson Mariano
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081Anush verma
 
Training report on JMRC
Training report on JMRCTraining report on JMRC
Training report on JMRCtushar garg
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiPrabjeet Singh
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro raillibin paul
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiShobhit Acharya
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in indiaSourav Paul
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in indiaNishanth H A
 
Bullet train in India
Bullet train in IndiaBullet train in India
Bullet train in IndiaSamyak Jain
 
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptxRAKESHPANDEY754083
 
Mass transit system
Mass transit systemMass transit system
Mass transit systemAsjad Khuram
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailIRJET Journal
 
Lucknow metro report
Lucknow metro reportLucknow metro report
Lucknow metro reportATUL SHUKLA
 

Similar to Tunnels infographic (20)

7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
Metro project in inda
Metro project in indaMetro project in inda
Metro project in inda
 
Piyush
PiyushPiyush
Piyush
 
Training report on JMRC
Training report on JMRCTraining report on JMRC
Training report on JMRC
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
 
wdfcil
wdfcilwdfcil
wdfcil
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Bullet train in India
Bullet train in IndiaBullet train in India
Bullet train in India
 
BMRCL In-Plant Training Report
BMRCL In-Plant Training ReportBMRCL In-Plant Training Report
BMRCL In-Plant Training Report
 
Cmrl ppt
Cmrl pptCmrl ppt
Cmrl ppt
 
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
 
JMRC PRESENTATION
JMRC PRESENTATIONJMRC PRESENTATION
JMRC PRESENTATION
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
Lucknow metro report
Lucknow metro reportLucknow metro report
Lucknow metro report
 

Tunnels infographic

  • 1. Most Significant IN Asia Today L Malaysia Malaysia MRT Corp. 9.5 kilometers USD 3.8 Billion 2016 KL Metro LATEST BUZZ: Kuala Lumpur’s new Klang Valley Mass Rapid Transit line of 51km and 35 stations has an estimated total cost of approximately US$16 billion, of which, the tunneling contract is the single largest package. SINGAPORE CABLE TUNNEL LATEST BUZZ: The Rohtang tunnel is a very challenging project. There are more than 46 avalanche sites on approaches to the tunnel and excavation will be done from both ends using Drill & Blast with NATM methodology. When completed, the Rohtang tunnel is set to become the world longest tunnel at an altitude above 3,000m. L Singapore SGD 2 Billion SP PowerGrid, a subsidiary of Singapore Power 16.5km East-West Tunnel and 18.5km North-South Tunnel East-West tunnel – 2017 North-South tunnel - 2018 Rohtang Tunnel LATEST BUZZ: The 60m deep cable tunnels will form the backbone of Singapore's power supply, serving future generations effectively, securely and with minimum inconvenience. It is expected to improve standards of living and performance for residential, industrial and commercial consumers L India USD 320 million 2015 Indian Government 8.8 kilometers Jammu Udhampur Srinagar Baramulla Railway Link (JUSBRL) LATEST BUZZ: The JUSBRL project could easily be described as one of the biggest and most challenging railway project in the world. It boasts of many firsts including: • The Longest Transport Tunnel In the Country (11km) • Deepest ‘Drill holes’ for Geotechnical Investigations 640m • First Large Scale use of ‘New Austrian Tunneling Method (NATM) in India • First Use of ‘Road header’ for ‘Tunnel Excavation’ in Railway Tunneling L India USD 13 Billion Government of India 345 kilometers Hong Kong Section of Guangzhou-Shenzhen-Hong Kong Express Rail Link (XRL LATEST BUZZ: The government projects that the XRL will carry about 100,000 passengers daily in 2020 and 120,000 passengers in 2030, generating an economic benefit of $83 billion over the next 50 years. L Hong Kong USD 5 Billion 2015 MTR Corporation Limited 26 kilometers Bangkok Metro LATEST BUZZ: • There will be 17 stations along the route, 4 of which will be underground (in Hua Lamphong- Bang Khae Section) and the rest will be elevated. The system will be capable to serve more than 50,000 passengers/hour/direction. • There will be 17 stations along the route, 14 of which will be underground whereas, the rest will be elevated. The system will be capable to serve more than 50,000 passengers/hour/direction. • There will be 30 stations along the route, 11 of which will be underground and the rest will be elevated. The system will have a service capacity of more than 50,000 passengers/hour/direction. L Thailand Mass Rapid Transit Authority of Thailand BLUE LINE: 27 kilometers USD 1,532 Million PURPLE LINE: 40 kilometers USD 2,199 Million ORANGE LINE: 24 kilometers USD 1,704 Million Tunnels Asia 2013 explores Best Practices in Geotechnical Investigation, Construction & Risk Management for Asia’s Tunnel Infrastructure. Attend the conference and get a rare opportunity to hear exclusive case studies from the biggest and most challeng- ing underground projects in Asia including: • KL Metro, Malaysia • Bangkok Metro • MRT Jakarta • Cable Tunnel Singapore To find out more, visit www.tunneldesignconstruction.com To attend the conference, email enquiry@iqpc.com.sg or call +65 6722 9388. • JUSB Railway Link, India • XRL Hong Kong • Rohtang Tunnel, India Disclaimer: Please note that we do all we can to ensure accuracy and timeliness of the information presented herein but errors may still understandably occur in some cases. If you believe that a serious inaccuracy has been made please let us know. This infograph is provided for information purposes only. IQPC accepts no responsibility whatsoever for any direct or indirect losses arising from the use of this report or its contents. References: http://www.railway-technology.com/projects/kashmir-railway/ http://en.wikipedia.org/wiki/Guangzhou%E2%80%93Shen- zhen%E2%80%93Hong_Kong_Express_Rail_Link_Hong_Kong_section http://en.wikipedia.org/wiki/Kashmir_Railway http://www.railway-technology.com/projects/kashmir-railway/ http://tunneltalk.com/Kuala-Lumpur-MRT-Mar12-MMC-Gamu- da-wins-Kuala-Lumpur-MRT.php http://en.wikipedia.org/wiki/MRT_(Bangkok) http://en.wikipedia.org/wiki/MRT_Purple_Line http://en.wikipedia.org/wiki/MRT_Orange_Line http://www.skyscrapercity.com/showthread.php?t=594526 http://en.wikipedia.org/wiki/Rohtang_Pass http://tunneltalk.com/Kuala-Lumpur-MRT-Mar12-MMC-Gamu- da-wins-Kuala-Lumpur-MRT.php http://www.mrta.co.th/eng/project/project_.htm http://www.tunneltalk.com/Kuala-Lum- pur-MRT-Nov11-Five-vie-for-underground-works.php MRT JAKARTA LATEST BUZZ: The tender process has already begun for six out of the eight work projects — three for underground work and three for elevated work. The three projects related to the underground work, have a total value of $470 million. Indonesia Local Government of Jakarta 110.8 km (23.8 km for the North-South Corridor and 87 km for East-West Corridor) Phase I – 2016 Phase II - 2018 L