Lyndale pedestrian bridge closure

  • 178 views
Uploaded on

 

More in: Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
178
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Santa Clara Valley Water District Neighborhood work Lyndale bridge closureWhat:As part of the Lower Silver Creek FloodProtection Project, the Lyndale pedestrianbridge will be replaced beginning springof 2012. The new bridge will be raisedhigher to accommodate the new floodwalls on each creek bank.When:Spring through summer 2012.Work hours are 8 a.m. to 5 p.m. The Lyndale pedestrian bridge (shown inside the red circle)Contact us will be replaced during the spring-summer 2012 season.If you have specific questions or concerns about this project,contact Ted Ibarra at (408) 265-2607, ext. 2067, ore-mail tibarra@valleywater.org.