Lyndale pedestrian bridge closure

304 views

Published on

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
304
On SlideShare
0
From Embeds
0
Number of Embeds
11
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Lyndale pedestrian bridge closure

  1. 1. Santa Clara Valley Water District Neighborhood work Lyndale bridge closureWhat:As part of the Lower Silver Creek FloodProtection Project, the Lyndale pedestrianbridge will be replaced beginning springof 2012. The new bridge will be raisedhigher to accommodate the new floodwalls on each creek bank.When:Spring through summer 2012.Work hours are 8 a.m. to 5 p.m. The Lyndale pedestrian bridge (shown inside the red circle)Contact us will be replaced during the spring-summer 2012 season.If you have specific questions or concerns about this project,contact Ted Ibarra at (408) 265-2607, ext. 2067, ore-mail tibarra@valleywater.org.

×