Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Capitol Expressway Light Rail Project – Pedestrian Improvements

1,102

Published on

Published in: Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
1,102
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
2
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Capitol Expressway Light Rail Project Pedestrian Improvements Project Update District 5 United January 25, 20121
  • 2. Project Phasing • The Capitol Expressway Light Rail Project is phased with pedestrian and bus improvements prior to Light Rail o Pedestrian Improvements (Phase 1A) o Bus Improvements (Phase 1B) o Light Rail (Phase 2)2 Capitol Expressway Light Rail Project
  • 3. Project Phasing Pedestrian Improvements (prior to light rail) • Continuous pathway on both sides of expressway • Street lighting and pedestrian lighting along new sidewalk • Landscape buffer between sidewalk and roadway • HOV lanes to remain (will be removed with light rail) • Construction is underway with completion in June 2012 • City to maintain street lights and landscape3 Capitol Expressway Light Rail Project
  • 4. Project Phasing Bus Improvements (prior to light rail) • Bus stops at Story Road and Ocala Avenue • Eastridge Transit Center: Expanded and reconfigured transit center • Property acquisition began in May 2011 • Design underway and scheduled for completion in early 2012 • Construction anticipated for fall 2012 (pending approval of STIP allocation) Light Rail • Preparing Federal Environmental Document for public comment anticipated for early 20124 Capitol Expressway Light Rail Project
  • 5. Overall Schedule • Construction for pedestrian May 2011 to Summer 2012 • Property acquisition for bus May 2011 to early 2012 • Federal EIS for public review Early 2012 • Design for bus improvements current to early 2012 • Federal EIS approved Late 2012 • Construction of bus improvements Fall 2012 to end 2014 (pending CTC allocation approval) • Light rail final design and construction to be determined5 Capitol Expressway Light Rail Project
  • 6. Pedestrian Improvements6 Capitol Expressway LR Project Phase I A
  • 7. Capitol Expressway Extension Pedestrian and Bus Improvements Capitol Avenue to Story Road Legend New Sidewalk: Pedestrian Improvements (Phase 1A) New Sidewalk: Bus Improvements (Phase 1B) Existing Sidewalk: to be reconstructed with Bus Improvements Existing Sidewalk to remain Eastridge Transit Center: Reconstructed with Bus Improvements New Landscape Area (Phase 1A) New Tree (Phase 1A)7 Capitol Expressway Light Rail Project
  • 8. Capitol Expressway Extension Pedestrian and Bus Improvements Between Story Road and Ocala Avenue Legend New Sidewalk: Pedestrian Improvements (Phase 1A) New Sidewalk: Bus Improvements (Phase 1B) Existing Sidewalk: to be reconstructed with Bus Improvements Existing Sidewalk to remain Eastridge Transit Center: Reconstructed with Bus Improvements New Landscape Area (Phase 1A) New Tree (Phase 1A)8 Capitol Expressway Light Rail Project
  • 9. Capitol Expressway Extension Pedestrian and Bus Improvements Ocala Avenue Legend New Sidewalk: Pedestrian Improvements (Phase 1A) New Sidewalk: Bus Improvements (Phase 1B) Existing Sidewalk: to be reconstructed with Bus Improvements Existing Sidewalk to remain Eastridge Transit Center: Reconstructed with Bus Improvements New Landscape Area (Phase 1A) New Tree (Phase 1A)9 Capitol Expressway Light Rail Project
  • 10. Capitol Expressway Extension Pedestrian and Bus Improvements Cunningham Avenue to Tully Road Legend New Sidewalk: Pedestrian Improvements (Phase 1A) New Sidewalk: Bus Improvements (Phase 1B) Existing Sidewalk: to be reconstructed with Bus Improvements Existing Sidewalk to remain Eastridge Transit Center: Reconstructed with Bus Improvements New Landscape Area (Phase 1A) New Tree (Phase 1A)10 Capitol Expressway Light Rail Project
  • 11. Capitol Expressway Extension Pedestrian and Bus Improvements Tully Road to Eastridge Transit Center Legend New Sidewalk: Pedestrian Improvements (Phase 1A) New Sidewalk: Bus Improvements (Phase 1B) Existing Sidewalk: to be reconstructed with Bus Improvements Existing Sidewalk to remain Eastridge Transit Center: Reconstructed with Bus Improvements New Landscape Area (Phase 1A) New Tree (Phase 1A)11 Capitol Expressway Light Rail Project
  • 12. Capitol Expressway Extension Pedestrian and Bus Improvements Eastridge Transit Center to Quimby Road Legend New Sidewalk: Pedestrian Improvements (Phase 1A) New Sidewalk: Bus Improvements (Phase 1B) Existing Sidewalk: to be reconstructed with Bus Improvements Existing Sidewalk to remain Eastridge Transit Center: Reconstructed with Bus Improvements New Landscape Area (Phase 1A) New Tree (Phase 1A)12 Capitol Expressway Light Rail Project
  • 13. Construction Photos Excavation and grading along levee slope13 Capitol Expressway LR Project Phase I A
  • 14. Construction Photos Grading for sidewalk near Cunningham Park Conduit for lighting and bus stop14 Capitol Expressway LR Project Phase I A
  • 15. Construction Photos Pathway north of Tully Road15 Capitol Expressway LR Project Phase I A
  • 16. Construction Photos Storm Drain Relocation along Capitol Avenue Forming new curb and gutter south of Story Road16 Capitol Expressway LR Project Phase I A

×