Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)

1,938 views
1,647 views

Published on

Special thanks to all the S.I.T. members that attended our last meeting. If you missed the meeting, please feel free to view the concept and comment here.

Published in: News & Politics, Education
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,938
On SlideShare
0
From Embeds
0
Number of Embeds
400
Actions
Shares
0
Downloads
78
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)

  1. 1. Roosevelt High School Moderniza on Concept Design October 2013
  2. 2. Schedule Design Submissions • Concept Design • Schematic Design • Early Release Packages • Design Development/GMP • Construction Documents October 16, 2013 December 20, 2013 December 20, 2013 March 3, 2014 June 2014 Construction Milestones • Abatment • Demolition • Substantial Completion • School starts November 1, 2013 - December 31, 2013 January 1, 2014 - March 15, 2014 July 15, 2015 August 2015 Student Involvement • Bi-weekly meetings with design/build team Starting in November 2013 SCHEDULE Roosevelt High School Moderniza on Concept Design October 2013
  3. 3. 10 min walk Petworth Metro NEIGHBORHOOD CONTEXT Roosevelt High School Moderniza on Concept Design October 2013
  4. 4. Greater Campus Sharpe Health MacFarland (RHS swing space) Roosevelt Petworth Library GREATER CAMPUS Roosevelt High School Moderniza on Concept Design October 2013
  5. 5. Construc on Phases 1932 1976 CONSTRUCTION PHASES Roosevelt High School Moderniza on Concept Design October 2013
  6. 6. Issues and Opportuni es Arrival/Iden ty • School Students Teachers Parents • STAY Students Teachers • Community Gym Pool Health Clinic Auditorium Access/Security • School Students Teachers Parents • STAY Students Teachers • Community Gym Pool Health Clinic Auditorium ISSUES AND OPPORTUNITIES Roosevelt High School Moderniza on Concept Design October 2013
  7. 7. Campus Plan Allison Street NW “The Terrace” ve aA Iow “The Waterworks” 13th Street NW “The Gallery” “The Heart” “The Outdoor Classroom” “The Pavilion” a Ave Georgi “The School Garden” Upshur Street CAMPUS PLAN Roosevelt High School Moderniza on Concept Design October 2013
  8. 8. “The Terrace” • Visibility • Iden ty • Access “THE TERRACE” Roosevelt High School Moderniza on Concept Design October 2013
  9. 9. “THE TERRACE” Roosevelt High School Moderniza on Concept Design October 2013
  10. 10. “The Pavilion” • Community entrance • STAY entrance • Iden ty “THE PAVILION” Roosevelt High School Moderniza on Concept Design October 2013
  11. 11. “The Outdoor Classroom” and “The Pavilion” “THE OUTDOOR CLASSROOM” AND “THE PAVILION” Roosevelt High School Moderniza on Concept Design October 2013
  12. 12. “The Outdoor Classroom” “THE OUTDOOR CLASSROOM” Roosevelt High School Moderniza on Concept Design October 2013
  13. 13. STAY/COMMUNITY ENTRY ACADEMICS ADMIN ATHLETICS/PHYSICAL EDUCATION MEDIA CENTER VISUAL & PERFORMING ARTS AUDITORIUM & SUPPORT HEALTH CLINIC FAMILY SUPPORT FOOD SERVICES STAY CTE ARTS RHS ENTRY FIRST FLOOR 0’ AUDITORIUM ACADEMICS 10’ 20’ 30’ 50’ ATHLETICS BUILDING ORGANIZATION Roosevelt High School Moderniza on Concept Design October 2013
  14. 14. “The Heart” ACADEMICS ADMIN ATHLETICS/PHYSICAL EDUCATION MEDIA CENTER VISUAL & PERFORMING ARTS AUDITORIUM & SUPPORT HEALTH CLINIC FAMILY SUPPORT FOOD SERVICES STAY CTE MECHANICAL/SUPPORT CIRCULATION 0’ 10’ 20’ 30’ 40’ OVERALL PLAN LOWER LEVEL Roosevelt High School Moderniza on Concept Design October 2013
  15. 15. “The Heart” “Outdoor Classroom” Media Center C o s m e Cafeteria tology Culinary Arts “The Heart” Career Center “The Steps” “The Terrace” 13th Street “THE HEART” Roosevelt High School Moderniza on Concept Design October 2013
  16. 16. “The Heart” sharing gathering community building learning “THE HEART” Roosevelt High School Moderniza on Concept Design October 2013
  17. 17. “The Heart” old + new “THE HEART” Roosevelt High School Moderniza on Concept Design October 2013
  18. 18. “The Heart” “THE HEART” Roosevelt High School Moderniza on Concept Design October 2013
  19. 19. Media Center ACADEMICS ADMIN ATHLETICS/PHYSICAL EDUCATION MEDIA CENTER VISUAL & PERFORMING ARTS AUDITORIUM & SUPPORT HEALTH CLINIC FAMILY SUPPORT FOOD SERVICES STAY CTE MECHANICAL/SUPPORT CIRCULATION 0’ 10’ 20’ 30’ 40’ OVERALL PLAN LOWER LEVEL Roosevelt High School Moderniza on Concept Design October 2013
  20. 20. Media Center MEDIA CENTER Roosevelt High School Moderniza on Concept Design October 2013
  21. 21. “The Waterworks” OVERALL PLAN LOWER LEVEL Roosevelt High School Moderniza on Concept Design October 2013
  22. 22. “The Waterworks” “THE WATERWORKS” Roosevelt High School Moderniza on Concept Design October 2013
  23. 23. “The Gallery” ACADEMICS ADMIN ATHLETICS/PHYSICAL EDUCATION MEDIA CENTER VISUAL & PERFORMING ARTS AUDITORIUM & SUPPORT HEALTH CLINIC FAMILY SUPPORT FOOD SERVICES STAY CTE MECHANICAL/SUPPORT CIRCULATION FIRST FLOOR 0’ 10’ 20’ 30’ 50’ OVERALL PLAN FIRST FLOOR Roosevelt High School Moderniza on Concept Design October 2013
  24. 24. “The Gallery” 3D/2D Studio Choral Instrumental Mul -purpose Studio “THE GALLERY” Roosevelt High School Moderniza on Concept Design October 2013
  25. 25. “The Pavilion” ACADEMICS ADMIN ATHLETICS/PHYSICAL EDUCATION MEDIA CENTER VISUAL & PERFORMING ARTS AUDITORIUM & SUPPORT HEALTH CLINIC FAMILY SUPPORT FOOD SERVICES STAY CTE MECHANICAL/SUPPORT CIRCULATION FIRST FLOOR 0’ 10’ 20’ 30’ 50’ OVERALL PLAN FIRST FLOOR Roosevelt High School Moderniza on Concept Design October 2013
  26. 26. “The Pavilion” STAY POOL GYM “THE PAVILION” Roosevelt High School Moderniza on Concept Design October 2013
  27. 27. ACADEMICS ADMIN ATHLETICS/PHYSICAL EDUCATION MEDIA CENTER VISUAL & PERFORMING ARTS AUDITORIUM & SUPPORT HEALTH CLINIC FAMILY SUPPORT FOOD SERVICES STAY CTE MECHANICAL/SUPPORT CIRCULATION “The School Garden” FIRST FLOOR 0’ 10’ 20’ 30’ 50’ OVERALL PLAN FIRST FLOOR Roosevelt High School Moderniza on Concept Design October 2013
  28. 28. “The School Garden” “THE SCHOOL GARDEN” Roosevelt High School Moderniza on Concept Design October 2013
  29. 29. ACADEMICS ADMIN ATHLETICS/PHYSICAL EDUCATION MEDIA CENTER VISUAL & PERFORMING ARTS AUDITORIUM & SUPPORT HEALTH CLINIC FAMILY SUPPORT FOOD SERVICES STAY CTE MECHANICAL/SUPPORT CIRCULATION Gym FIRST FLOOR 0’ 10’ 20’ 30’ 50’ OVERALL PLAN FIRST FLOOR Roosevelt High School Moderniza on Concept Design October 2013
  30. 30. Gym Sec on Proposed bleacher capacity: +/- 1,000 GYM SECTION Roosevelt High School Moderniza on Concept Design October 2013
  31. 31. GROUND FLOOR • • • Cafeteria Culinary Arts Media Center • • Career Center STAY Classrooms FIRST FLOOR • • • RHS Administration STAY Administration Family Support Center SHARED SPACES Roosevelt High School Moderniza on Concept Design October 2013
  32. 32. FIRST FLOOR • • • 10th Grade Academy RISE Academy Autism Academy SECOND FLOOR • • 9th Grade Academy ESL Academy (9th +10th) THIRD FLOOR • • • 11th Grade Academy 12th Grade Academy Elite Academy ACADEMY ORGANIZATION Roosevelt High School Moderniza on Concept Design October 2013
  33. 33. ACADEMY IDENTITY ACADEMY IDENTITY Roosevelt High School Moderniza on Concept Design October 2013
  34. 34. ACADEMY ADMINISTRATION • • Staff Office or Workroom Stairs and Restroom ACADEMY ADMINISTRATION Roosevelt High School Moderniza on Concept Design October 2013
  35. 35. Landscape Front Entrance Preliminary Landscape Planting Concept: Preliminary Plant Palette: Trees / Shrubs Stabilize embankment / Provide emphasis to front entrance Foundation Planting Example LANDSCAPE Roosevelt High School Moderniza on Concept Design October 2013
  36. 36. Proposed Drop-off Along 13th Street Arts Wing Auditorium Visitor parking (22 spaces) Bus Loop Path ble essi Acc DROP OFF Roosevelt High School Moderniza on Concept Design October 2013
  37. 37. LEED for Schools 2009 80 13 6 11 Total Proposed Project Score Certified 40 to 49 points 19 2 3 Y M+ MY Y 1 4 1 4 1 2 2 1 1 1 1 1 1 1 Silver 50 to 59 points LEED Scorecard Pts. 110 Gold 60 to 79 points 0 Sustainable Sites N SSp1 Construction Activity Pollution Prevention SSp2 Environmental Site Assessment SS1 Site Selection SS2 Dev. Density & Community Connectivity SS3 Brownfield Redevelopment SS4.1 Alt. Transportation - Public Transport SS4.2 Alt. Transportation - Bicycle Storage SS4.3 Alt. Transportation - LEV Vehicles Pla 24 0 0 1 4 1 4 1 2 SS4.4 SS5.1 SS5 1 SS5.2 SS6.1 SS6.2 SS7.1 Alt. Transportation - Parking Capacity Site Development - Protect or Restore Habitat Site Development - Maximize Open Space Stormwater Design - Quantity Control Stormwater Design - Quality Control Heat Island Effect - Non-Roof 2 1 1 1 1 1 SS7.2 SS8 Heat Island Effect - Roof Light Pollution Reduction 1 1 8 1 0 Y M+ MY 1 1 2 2 2 1 14 1 2 Y M+ MY Y Y 1 1 1 1 1 1 1 10 0 0 Y M+ MY 4 2 4 20 8 1 Y M+ MY Y Y 10 5 1 5 2 Site Master Plan Joint Use of Facilities 1 1 1 Water Efficiency N WEp1 Water Use Reduction WE1 Water Efficient Landscaping 11 WE2 Innovative Wastewater Technologies WE3 Water Use Reduction, 30%, 35%, 40% 1 WE4 Process Water Use Reduction, 20% 4 Energy & Atmosphere N EAp1 Fundamental Commissioning EAp2 Min. Energy Performance (ASHRAE 90.1 - 2007) EAp3 Fundamental Refrigerant Management 3 EA1 Optimize Energy Performance 2 4 1 2 EA2 1 EA3 1 EA4 EA5 2 1 SS9 SS10 EA6 0 4 33 0 0 0 19 On-Site Renewable Energy 7 Enhanced Commissioning Enhanced Refrigerant Management Measurement & Verification 2 1 1 1 6 0 0 Y M+ M1 1 1 1 2 1 2 Green Power, 35% for 2 years 1 1 Y 1 Y 1 1 1 1 1 1 1 1 , y 4 Materials & Resources N MRp1 Storage & Collection of Recyclables MR1.1 Bldg. Reuse - Exist. Walls/ Floors/ Roof 75/95% 1 MR1.2 Bldg. Reuse - Interior Non-Struc. Elements,50% MR2 Construction Waste Management, 50/ 75% 2 MR3 Materials Reuse 5% MR4 Recycled Content 10%, 20% MR5 Regional Materials 10%, 20% 1 MR6 Rapidly Renewable Materials 2.5% MR7 Certified Wood 2 Indoor Environmental Quality N IEQp1 Minimum IAQ Performance IEQp2 Environmental Tobacco Smoke (ETS) Control IEQp3 Minimum Acoustical Performance IEQ1 Outdoor Air Delivery Monitoring IEQ2 Increased Ventilation IEQ3.1 Const. IAQ Management Plan - During Const. IEQ3.2 Const. IAQ Management Plan - Pre Occupancy IEQ4 Low-Emitting Materials (Choose for upto 4 points) IEQ4.1 Adhesives and Sealants IEQ4.2 Paints & Coatings IEQ4.3 Flooring Systems IEQ4.4 Composite Wood & Agrifiber IEQ4.5 Furniture & Furnishings IEQ4.6 Ceiling and Wall Systems IEQ5 Indoor Chemical & Pollutant Source Control IEQ6.1 Controllability of Systems - Lighting IEQ6.2 Controllability of Systems - Thermal Comfort IEQ7.1 Thermal Comfort - Design IEQ7.2 Thermal Comfort - Verification IEQ8.1 Daylight 75/90% classrm/ 75% reg. occupied 1 IEQ8.2 Views 90% IEQ9 Enhanced Acoustical Performance 1 IEQ10 Mold Prevention 0 Innovation in Design N ID1.1 Innovation in Design: Education/ Outreach ID1.2 Innovation in Design: Green Cleaning ID1.3 Pilot Credit SSpc82: Local Food Production ID1.4 Exemplary Performance: Green Power - 70% Backup Innovation in Design: SSc4.1 Backup Innovation in Design: Low Mercury Lighting Backup Exemplary Performance: MRc2 95% ID2 LEED™ Accredited Professional ID3 The School as a Teaching Tool 13 0 2 1 2 2 2 2 1 1 3 1 0 Y M+ MM1 1 M+ 1 1 g 0 Regional Priority N Up to 4 points awarded in this category RP1.1 Regional Priority: SSc5.1 RP1.2 Regional Priority: SSc6.1 RP1.3 Regional Priority: WEc2 RP1.4 Regional Priority: EAc1 (40%/36%) RP1.5 Regional Priority: EAc2 (1%) RP1.6 Regional Priority: MRc1.1 (75%) 4 1 1 1 1 1 1 19 0 0 0 1 1 1 1 4 1 1 1 1 1 1 1 1 1 1 1 3 1 1 1 6 1 1 1 1 0 0 1 1 LEED SCORECARD Roosevelt High School Moderniza on Concept Design October 2013
  38. 38. Windows • • • • Restora on + Maintain profiles Rou ne maintenance $$$$ Poor thermal performance without added storm New Wood Windows + Match profiles Rou ne maintenance $$$ Moderate thermal performance Metal Clad Wood Windows +/- Tradi onal appearance + Be er thermal performance + Less maintenance + $$ Metal Windows +/- Tradi onal appearance + Be er thermal performance + Least maintenance + $$ WINDOWS Roosevelt High School Moderniza on Concept Design October 2013
  39. 39. Cupola Restora on 1932 Cupola 2013 Cupola Glass Fiber Reinforced Concrete “Jacket” + 2015 Cupola = CUPOLA RESTORATION Roosevelt High School Moderniza on Concept Design October 2013
  40. 40. Roosevelt High School Moderniza on Concept Design October 2013

×