Roosevelt High School Modernization Community Meeting

1,206 views
978 views

Published on

We enjoyed last night's meeting with the Ward 4 Roosevelt High School community. If you happened to have missed the meeting or simply wish to share the update and new proposed work hours with your neighbors, friends and family feel free to share! Thanks.

Published in: News & Politics, Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,206
On SlideShare
0
From Embeds
0
Number of Embeds
245
Actions
Shares
0
Downloads
20
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Roosevelt High School Modernization Community Meeting

  1. 1. Roosevelt High School Moderniza on Concept Design November 2013
  2. 2. Perkins Eastman DC Team Sean O’Donnell, AIA, LEED AP Matt Bell, FAIA Mary Rankin, AIA, LEED AP BD + C Principal-In–Charge Design Principal Project Manager William Griffin, AIA, LEED AP Abbie Cronin Tatiana Bendeck, LEED AP Project Designer Project Architect Architect PERKINS EASTMAN DC TEAM Roosevelt High School Moderniza on Concept Design November 2013
  3. 3. Smoot/Gilbane Team SMOOT/GILBANE TEAM Roosevelt High School Moderniza on Concept Design November 2013
  4. 4. Schedule Design Submissions • Concept Design • Schematic Design • Early Release Packages • Design Development/GMP • Construction Documents October 2013 December 2013 December 2013 March 2014 June 2014 Construction Milestones • Demolition • GMP finalized • Substantial Completion • School starts January 2014 - March 2014 May 2014 July 2015 August 2015 Upcoming Meetings • CFA Concept Level Review • CFA Final Submission November 21, 2013 January/February 2014 SCHEDULE Roosevelt High School Moderniza on Concept Design November 2013
  5. 5. Greater Campus S Sharpe Health M MacFarland (RHS swing space) S R Roosevelt P Petworth Library R M P 10 min walk Petworth Metro Bus Stops VICINITY MAP Roosevelt High School Moderniza on Concept Design November 2013
  6. 6. Construc on Phases 1932 SITE PLAN 1932 1976 CONSTRUCTION PHASES Roosevelt High School Moderniza on Concept Design November 2013
  7. 7. ADD CLEARSTORY WINDOWS DEMO INFILL TO RESTORE COURTYARD Restoring the Historic Par RESTORE FRONT DOOR 1932 SITE PLAN RESTORING THE HISTORIC PARTI Roosevelt High School Moderniza on Concept Design November 2013
  8. 8. ve orgia A Ge Campus Plan Upshur Street C e Av wa Io P H “The Outdoor Classroom” “The Pavilion” “The Heart” Allison Street NW P M W H 13th Street NW “The Terrace” + “The Por co” M C T “The Media Center” “The Waterworks” “The Gallery” “The School Garden” W G T G S S CAMPUS PLAN Roosevelt High School Moderniza on Concept Design November 2013
  9. 9. C P H “The Outdoor Classroom” “The Pavilion” “The Heart” T “The Terrace” + “The Por co” M STAY/COMMUNITY ENTRY “The Media Center” “The Waterworks” “The Gallery” “The School Garden” W G S C 195.17 M P 195.17 195.16 W H G 195.17 S 195.17 195.16 T RHS ENTRY ARTS AUDITORIUM ACADEMICS CO M M U N I T Y + ATHLETICS BUILDING ORGANIZATION Roosevelt High School Moderniza on Concept Design November 2013
  10. 10. “The Terrace” • Visibility • Iden ty • Access ENHANCED ENTRY STAIR “THE TERRACE” Roosevelt High School Moderniza on Concept Design November 2013
  11. 11. “The Por co “ “THE PORTICO” Roosevelt High School Moderniza on Concept Design November 2013
  12. 12. “The Pavilion” • Community entrance • STAY entrance • Iden ty “THE PAVILION” Roosevelt High School Moderniza on Concept Design November 2013
  13. 13. “The Outdoor Classroom” and “The Pavilion” “THE OUTDOOR CLASSROOM” AND “THE PAVILION” Roosevelt High School Moderniza on Concept Design November 2013
  14. 14. “The Pavilion” STAY/COMMUNITY ENTRY STAY 195.17 POOL 195.16 GYM “THE PAVILION” Roosevelt High School Moderniza on Concept Design November 2013
  15. 15. “The Heart” “Outdoor Classroom” Media Center C o s m e Cafeteria tology Culinary Arts “The Heart” Career Center “The Steps” “The Terrace” 13th Street “THE HEART” Roosevelt High School Moderniza on Concept Design November 2013
  16. 16. “The Heart” sharing gathering community building learning 179.37 179.37 “THE HEART” Roosevelt High School Moderniza on Concept Design November 2013
  17. 17. “The Heart” “THE HEART” Roosevelt High School Moderniza on Concept Design November 2013
  18. 18. “The Media Center” 179.37 MEDIA CENTER Roosevelt High School Moderniza on Concept Design November 2013
  19. 19. “The Outdoor Classroom” EXISTING AREAWAY “THE OUTDOOR CLASSROOM” Roosevelt High School Moderniza on Concept Design November 2013
  20. 20. “The Waterworks” “THE WATERWORKS” Roosevelt High School Moderniza on Concept Design November 2013
  21. 21. “The Gallery” 3D/2D Studio Choral 195.17 Instrumental Mul -purpose Studio “THE GALLERY” Roosevelt High School Moderniza on Concept Design November 2013
  22. 22. “The School Garden” “THE SCHOOL GARDEN” Roosevelt High School Moderniza on Concept Design November 2013
  23. 23. Landscape PARKING LOT BIORETENTION SEE SWM EXHIBIT FOR ADDITIONAL SUSTAINABLE MEASURES EAST ENTRANCE INTERPRETIVE GREEN COURTYARD WEST ENTRANCE LANDSCAPING RENOVATED RECREATION AREA, (SOFTBALL FIELD, 2 TENNIS COURTS AND BASKETBALL COURT) ND L LA OO AR CH CF E S A M DL ID M NORTH COURTYARD ROOSEVELT HIGH SCHOOL SOUTH SCIENCE COURTYARD LANDSCAPE TO STABILIZE STEEP EMBANKMENT PROTECT EXISTING SPECIMEN TREE PROPOSED LANDSCAPE PLAN Roosevelt High School Moderniza on Concept Design November 2013
  24. 24. Historic Elements EXISTING CUPOLA CUPOLA RESTORATION Roosevelt High School Moderniza on Concept Design November 2013
  25. 25. Roosevelt High School Moderniza on Concept Design November 2013

×