Your SlideShare is downloading. ×
0
Eleva&ng	
  the	
  Quality	
  of	
  Life	
  in	
  the	
  District	
  
KRAMER	
  MS	
  MODERNIZATION	
  COMMUNITY	
  MEETIN...
Eleva&ng	
  the	
  Quality	
  of	
  Life	
  in	
  the	
  District	
  
Site Overview
Eleva&ng	
  the	
  Quality	
  of	
  Life	
  in	
  the	
  District	
  
AGENDA
•  Introductions
•  Project Team (Company)
• ...
Eleva&ng	
  the	
  Quality	
  of	
  Life	
  in	
  the	
  District	
  
Background	
  
	
  
Kramer	
  Middle	
  School	
  is...
Eleva&ng	
  the	
  Quality	
  of	
  Life	
  in	
  the	
  District	
  
Project	
  Scope	
  
	
  
•  Each	
  classroom	
  wi...
Eleva&ng	
  the	
  Quality	
  of	
  Life	
  in	
  the	
  District	
  
Project	
  Scope	
  
	
  
•  Install	
   new	
   mar...
Poten7al Construc7on Impact	
  
•  Work days / times
•  Construction Noise
•  Construction Traffic
•  Pedestrian Traffic (...
Eleva&ng	
  the	
  Quality	
  of	
  Life	
  in	
  the	
  District	
  
	
  
	
  
	
  
	
  
	
  
Kramer School Modernization Community Meeting (June 18, 2014)
Kramer School Modernization Community Meeting (June 18, 2014)
Upcoming SlideShare
Loading in...5
×

Kramer School Modernization Community Meeting (June 18, 2014)

580

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
580
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Kramer School Modernization Community Meeting (June 18, 2014)"

  1. 1. Eleva&ng  the  Quality  of  Life  in  the  District   KRAMER  MS  MODERNIZATION  COMMUNITY  MEETING     WEDNESDAY,  JUNE  18,  2014    
  2. 2. Eleva&ng  the  Quality  of  Life  in  the  District   Site Overview
  3. 3. Eleva&ng  the  Quality  of  Life  in  the  District   AGENDA •  Introductions •  Project Team (Company) •  Rules of the Road •  Site Overview •  School Modernization Overview •  Questions & Answers  
  4. 4. Eleva&ng  the  Quality  of  Life  in  the  District   Background     Kramer  Middle  School  is  a  “Phase  1  ModernizaFon”  in  the  summers  of  FY  2014,  and  2015,   per  the  adopted  Master  FaciliFes  Plan.    The  school  is  located  in  SE,  at  the  corner  of  17th  St.   and  Q  Street.    With  a  modernizaFon  targeted  towards  6th,  7th,  and  8th  grades,  the  school  is   scheduled  to  be  renovated  and  opened,  with  compleFon  of  renovaFon  in  August  2015  for   the  2015-­‐2016  school  years.     A  “Phase  1  ModernizaFon”  consists  of  a  targeted  modernizaFon  of  primary  and  essenFal   academic  and  ancillary  spaces.  The  main  focus  revolves  around  the  classrooms,  corridors,   health  suites  and  restrooms.  Due  to  the  expanded  phase  1  budget,  the  scope  has  increased   to   include   the   entrances,   corridors,   floors,   ceilings,   walls,   furniture,   fixtures,   equipment,   mechanical,  electrical,  plumbing,  security,  technology,  and  other  selected  upgraded  property   work.      
  5. 5. Eleva&ng  the  Quality  of  Life  in  the  District   Project  Scope     •  Each  classroom  will  be  fied  out  in  such  a  manner,  to  the  maximum  extent  possible,  to  meet  the   Performance   Criteria   as   stated   in   the   Master   FaciliFes   Plan   (many   of   which   follow   LEED   CerFficaFon  Guidelines).    Important  elements  include:   •  Install  security  doors  and  cameras  throughout  the  building,  with  security  monitors  at  security   desk  and  main  office.     •  Replace  classroom  entry  doorways  and  skylights.   •  Install  new  flooring  (in  selected  areas),  parFFon  walls,  acousFcal  ceiling  Fle,  and  lighFng  fixtures   in  all  classroom  spaces.     •  Modernize  the  main  office,  including  the  Principal’s  office,  conference  room,  administraFve  area,   and   “welcome”   areas.   The   nurses’   suite   will   also   be   enhanced   to   include   an   ADA   compliant   bathroom.  
  6. 6. Eleva&ng  the  Quality  of  Life  in  the  District   Project  Scope     •  Install   new   marker-­‐boards,   tack-­‐boards,   casework,   projecFon   screen,   audio/video   equipment,  and  Smart  Boards.      Install  new  electrical  outlets,  voice,  data,  and  CATV   ports  as  required  for  new  classroom  configuraFons.   •  Provide   new   FF&E   in   all   necessary   rooms   and   classroom   spaces   (desks,   chairs,   shelving,  storage/lockers,  etc.).     •  install  new  elevator  shaj  and  elevator.   •  Replace   the   exisFng   heaFng   units   with   new   venFlaFon   systems   in   the   classroom   spaces  to  ensure  year-­‐long  thermal  comfort  of  the  occupants.   •  Install  new  RTUs  the  service  all  areas  of  the  main  building  and  the  gymnasium  area.   •  Install  new  restrooms  fixtures:    in  gang  restrooms,  locker  rooms,  and  also  install  a   new  restroom  in  the  Principal’s  office.    The  other  restrooms  will  be  modernized  with   new  fixtures,  floorings,  ceilings  and  lighFngs,  and  ADA  compliant  restrooms  will  be   located  on  each  floor.   •  Replace   exisFng   windows   with   specified   glazing   at   entrances   and   throughout   the   building.  
  7. 7. Poten7al Construc7on Impact   •  Work days / times •  Construction Noise •  Construction Traffic •  Pedestrian Traffic (Work force) •  Parking  
  8. 8. Eleva&ng  the  Quality  of  Life  in  the  District            
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×