Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

Like this presentation? Why not share!

Like this? Share it with your network

Share

Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)

on

  • 691 views

 

Statistics

Views

Total Views
691
Views on SlideShare
535
Embed Views
156

Actions

Likes
0
Downloads
8
Comments
0

2 Embeds 156

http://dgs.dc.gov 155
http://www.linkedin.com 1

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Garrison Elementary School Concept Design Presentation (Feb. 12, 2014) Presentation Transcript

  • 1. Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 / JOINT VENTURE
  • 2. Garrison History Neighborhood School Since 1889 Visioning process Visioning process 1857 1911 1951 1888 1921 1964 1903 1928 2012 1965 CONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECT / 8 CONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECT 9 Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 3. Site Concept Community Visioning 2012 Participatory Process Engagement with 100+ community members • Relationship with nature is a key to learning • Garrison’s schoolyard = neighborhood park • The school can become a community resource / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 4. VISIBILITY & SIGHTLINES SITE CIRCULATION ENVIRONMENTAL INPUTS SERVICE & ACCESS Planning Principles / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 5. PROGRAM PROGRAM PROGRAM OASIS / OUTDOOR CLASSROOM PERFORMANCE SPACE20 CONCEPTUAL DESIGN PRESENTATION NEIGHBORHOOD PARK - OASIS / OUTDOOR CLASSROOM JUNE 12 2012 Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECT NEIGHBORHOOD PARKS CONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECT CONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECT / 21 STODDERT SCHOOL 16 PERFORMANCE SPACE Precedents Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 6. PROGRAM PROGRAM 23 PROGRAM ENVIRONMENTAL CLASSROOM CONCEPTUAL DESIGN PRESENTATION PLAYGROUNDS STODDERT SCHOOL ENVIRONMENTAL CLASSROOM COMMUNITY SQUARE JUNE 12 2012 - Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECT PRECEDENTS SPRINKLER PLAZA DUPONT CIRCLE CONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECT PLAYGROUNDS 18 MOUNT PLEASANT PROGRAM CONCEPTUAL DESIGN PRESENTATION - PORTALS JUNE 12 2012 Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECT 22 COMMUNITY SQUARE PORTALS / CONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECT JOINT VENTURE 17 CONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECT 19 Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 SPRINKLER PLAZA
  • 7. Site Concept / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 8. - 40 SPACES PROVIDED N / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 9. / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 10. OASIS, PLAY AREAS AND GARDENS / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 11. OASIS / OUTDOOR CLASSROOM AND PLAY AREA BEYOND / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 12. 13TH STREET VIEW - ENTRY PAVILION / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 13. VERMONT AVENUE ENTRY PAVILION / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 14. R STREET ENTRY PAVILION AND PERFORMANCE SPACE / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 15. Phased Modernization / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 16. EXPANSION JOINT EXPANSION JOINT GIRLS OFFICE OF BILINGUAL EDUCATION EMBASSY ADOPTION PROGRAM SPECIAL EDUCATION O.B.E. COMPUTER LAB OFFICE OF BILINGUAL EDUCATION SPECIAL EDUCATION OFFICE BOYS STAIR STAIR EAST WING SECOND FLOOR LEVEL = - 24” CORRIDOR LIBRARY LIBRARY LAB POWER LUNCH PROGRAM STAIR INSTRUCTIONAL COACH & LITERACY CONSULTANT THIRD GRADE CLASSROOM WEST WING SECOND FLOOR LEVEL CLASSROOM FIFTH GRADE CLASSROOM THIRD GRADE 3-5 AUTISM CLASSROOM FIRST GRADE CORRIDOR LOUNGE CUST. STORAGE STAIR MUSIC ESPAÑOL CLASSROOM GIRLS FIRST GRADE BOYS O.B.E. OFFICE EXPANSION JOINT SEWER TUNNEL EXPANSION JOINT EXISTING SECOND FLOOR PLAN BOYS O.B.E. KINDERGARTEN KINDERGARTEN K-2 AUTISM ALL PURPOSE ROOM TEACHER'S LOUNGE GIRLS STAIR CORRIDOR KITCHEN PARENT CENTER EAST WING FIRST FLOOR LEVEL = - 24” KINDERGARTEN KINDERGARTEN PS/PK AUTISM CLASSROOM PS/PK CLASSROOM STAIR TESTING STORAGE OFFICE OF BILINGUAL EDUACATION CLASSROOM CLASSROOM GENERAL STORAGE WEST WING FIRST FLOOR LEVEL = + 24” MAIN LOBBY BOILER ROOM CORRIDOR MAIN FLOOR LEVEL = 0 CUST. SUPPLY COPY CUSTODIAL OFFICE STAIR OFFICE GENERAL STORAGE PRINCIPAL HEALTH SUPPLY & BOOK ROOM PS/PK CLASSROOM OCCUPATIONAL THERAPY BOYS COUNSELOR GIRLS EXISTING FIRST FLOOR PLAN N / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 17. / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 18. GRADE 1 - 5 ACADEMIC CORE EAST WING FLOORS 1 AND 2 4 4 5 G 5 EARLY CHILDHOOD ACADEMIC CORE WEST WING FLOORS 1 AND 2 B Resource Room OT/ PT Pre-K Pre-K Pre-K Speech S.E. / Aut. 3 3 Art Music K K Pre-K B G Work Room SECOND FLOOR ENTRANCE WELCOME ADMIN MULTI-PURPOSE MEDIA CENTER CLUSTER GRADE 1 - 5 ACADEMIC CORE EAST WING FLOORS 1 AND 2 Maint. S.E. / Aut. Science Center Work Room 1 2 1 2 B G Staff DN Stage Multi Purpose Room EARLY CHILDHOOD ACADEMIC CORE WEST WING FLOORS 1 AND 2 Kitchen E.C. E.C. Health Instr. Coach Special Needs Special Needs E.C. S.E. / Aut. Comp. Lab Media Center Gallery Welcome Admin. Work Room Pre-K B G Laundry FIRST FLOOR N / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 19. AERIAL SITE VIEW / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 20. OPTION A: APPROACHING THE MAIN ENTRANCE FROM 13TH STREET / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 21. OPTION B: APPROACHING THE MAIN ENTRANCE FROM 13TH STREET / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 22. OPTION A: APPROACHING THE MAIN ENTRANCE FROM 12TH STREET / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 23. OPTION B: APPROACHING THE MAIN ENTRANCE FROM 12TH STREET / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 24. NEW SUNSHADES / LIGHTSHELVES NEW PV ARRAY EXPOSED CONCRETE STRUCTURE AT CLASSROOM EXTERIOR WALLS      MEDIA CENTER BUMP-OUT ADDITION  FIRST FLOOR INFILL STRUCTURE AT EXISTING BOILER ROOM    SECTION THROUGH EAST WING @ MEDIA CENTER NEW SUNSHADES / LIGHTSHELVES NEW PV ARRAY EXPOSED CONCRETE STRUCTURE AT CLASSROOM EXTERIOR WALLS       NEW WINDOWS, TYP.   SECTION THROUGH WEST WING @ TYPICAL CLASSROOMS / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 25. NEW SECOND STORY LINK NEW SUNSHADES       SECTION THROUGH CENTRAL WING @ MULTI-PURPOSE ROOM AND NEW SECOND STORY LINK / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 26. AERIAL SITE VIEW / Garrison Elementary School Phase 1 Modernization Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE
  • 27. / JOINT VENTURE 1228 9th Street, NW, Washington, DC 20001 202 548 7570 www.bellarchitects.com www.newmanarchitects.com Civil Engineer Wiles Mensch Corporation - DC 739 8th Street, SE, 2nd Floor, Washington, DC 20003 Landscape Architect Landscape Architecture Bureau, LLC 714 7th Street SE, Washington, DC 20003 Structural Engineer Robert Silman Associates 1053 31st Street NW, Washington, DC 20007 Mechanical, Electrical, Plumbing and Fire Protection Engineer Global Engineering Solutions of Washington DC 1410 Q Street NW, Suite 100, Washington, DC 20009 IT, Security and Audiovisual Consultant Educational Systems Planning 49 Old Solomon’s Island Road, Suite 301, Annapolis, MD 21401 Foodservice Consultant Nyikos Associates, Inc. 18219-A Flower Hill Way, Gaithersburg, MD 20879 Acoustical Consultant Polysonics 405 Belle Air Lane, Warrenton, VA 20186 Environmental Consulting ECS Capitol Services, PLLC 655 15th Street, NW, Washington, DC 20005 Cost Estimating TCT Cost Consultants, LLC 1090 Vermont Avenue NW, 4th Floor, Suite 230, Washington, DC 20005 Sustainability Consulting GreenShape, LLC 1001 Connecticut Avenue NW , Suite 725, Washington, DC 20036