ANC Presentation of Roosevelt & Powell School

1,515 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,515
On SlideShare
0
From Embeds
0
Number of Embeds
904
Actions
Shares
0
Downloads
15
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

ANC Presentation of Roosevelt & Powell School

  1. 1. Roosevelt High School Moderniza on ANC MEETING, JULY 2014
  2. 2. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 PROJECT SCHEDULE MILESTONE ACTIVITIES • SMOOT GILBANE CONTRACT AWARD FALL 2013 • DEMOLITION WORK FALL 2013 TO SUMMER 2014 • GMP APPROVAL SUMMER 2014 • MEP ROUGH IN FALL 2014 TO SPRING 2015 • EXTERIOR BUILDING RESTORATION SPRING 2014 TO SPRING 2015 • ATRIUM SKYLIGHT WINTER 2014 TO SPRING 2015 • INTERIOR FINISHES FALL 2014 TO FALL 2015 • EXTERIOR SITE IMPROVEMENTS SPRING 2014 TO FALL 2015 • CONSTRUCTION COMPLETION FALL 2015
  3. 3. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 BUILDING ORGANIZATION UPSHURST,NW ALLISONST,NW 13TH ST, NW IOWA AVE, NW DNDN ARTS AUDITORIUM ACADEMICS RHS ENTRY STAY/COMMUNITY ENTRY COMMUNITY + ATHLETICS
  4. 4. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 1-15/16" (88.9) .P Y T GIRLS ATHLETIC LOCKER ROOM ATHLETIC STORAGE GIRLS P.E. LOCKER ROOM LAUNDRY ROOM BOYS P.E. LOCKER ROOM DANCE/ AEROBICS PE FAM CHANG BOYS ATHLETIC LOCKER ROOM STORAGE FITNESS ROOM ? HEALTH CLASSROOM DEPT. OFFICE TRAINING ROOM FOOTBALL GYM COACHES OFFICE BASKETBALL OFFICE GIRLS BOYS CONCESSIONS ELEC ELEC STORAGE STORAGE STAIR E4 STAIR E2 PAVILION STAIR STAIR E3 STAIR E1 ELEV E1 ELEV PAVILION GREENHOUSE CORRIDOR STORAGE GIRLS BOYS CORRIDOR VEST VEST OFFICE STORAGE IDF CORRIDOR BLEACHER CAPACITY INCREASED TO ~1,000 SEATS STAY AND COMMUNITY ENTRANCE PAVILION THE MILK HOUSE Department Legend ACADEMIC ADMINISTRATION MEP PHYSICAL EDUCATION STAY SUPPORT FIRST FLOOR ATHLETIC ATHLETIC FIRST FLOOR
  5. 5. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 LIFE GUARD/FIRST AID OFFICE TOWELS GIRLS LOCKER FAMILY STORAGE TOWELS FAMILY BOYS LOCKER POOL ELECELEC STAIR E3 STAIR E2 STAIR E4 ELEV E1 ELEV. E2 STAIR E1 CORRIDOR CORRIDOR CORRIDORCORRIDOR JANITOR JANITOR POOL MECHANICAL LEVEL POOL LEVEL ATHLETIC GROUND FLOOR
  6. 6. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 MEDIA OFFICE MEDIA WKRM MEDIA CENTER CAFETERIA CULINARY DINING LAB CULINARY LAB GIRLS ATRIUM MECHANICAL AND FIRE PUMP MAIN ELECTRICAL JROTC UNIFORM STORAGE JROTC OFFICE JROTC CLASSROOM COSMETOLOGY CLASSROOM ELEC COSMETOLOGY LAB OFFICE STORAGE OFFICEOFFICE CAREER CENTER ELECTRICAL JROTC CLASSROOM STUDENT GOVERNMENT BOYS MECHANICAL MECHANICAL STOR LAU STAIR C2 STAIR D2 STAIR D1 ELEV D1 CORRIDOR EQUIPMENT STORAGE EXTERNAL DIPLOMA EXTERNAL DIPLOMA OFFICE OFFICE CONF LAYC OFFICES BES QUIET RM BES CLASSROOM BES RESOURCE BES CLASSROOM TEXTBOOK STORAGE BES OFFICE SCHOOL STORE ELEC ELEC JROTC ARMORY STORAGE CORRIDOR DRY STORAGE COOLER FREEZER LOCKER WOMEN MEN LOCKER OFFICE JANITOR TELECOM DEMARC/MDF OFFICE GA COLLABORATIVE OFFICES IDF - C/D BES RECEPTION AMPHITHEATER PUMP EQUIPMENT JROTC Department Legend ACADEMIC FAMILY SUPPORT FIELD FOOD SERVICE HEALTH SUITE JROTC MEDIA CENTER MEP PATHWAYS SPECIAL ED. STAY SUPPORT GROUND FLOOR ACADEMIC ACADEMIC GROUND FLOOR
  7. 7. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 ATRIUM Careers 13th Street Por co Central Stair Media Center Amphi- theater “The Heart” Water- works Green- house Garden Culinary/ Dining
  8. 8. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 STAY/COMMUNITY ENTRY RHS ENTRY ACADEMIC FIRST FLOOR
  9. 9. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 ELEC 11TH GRADE ADMIN 11TH GRADE CLASSROOM 11TH GRADE CLASSROOM 11TH GRADE STORAGE MECHANICAL ELEC ELEC SCIENCE PREP MECHANICAL STAY STG STAFF TOILET STAFF TOILET STAIR C2 STAIR D2 STAIR D1STAIR C1 ELEV D1 CORRIDOR 11TH GRADE STAFF WKRM 11TH GRADE CLASSROOM 12TH GRADE CLASSROOM 12TH GRADE CLASSROOM 11/12TH SCIENCE CLASSROOM 11/12TH SCIENCE LAB 12TH GRADE STORAGE 12TH GRADE CLASSROOM 12TH GRADE STAFF WORKRM 12TH GRADE ADMIN 11th GRADE CLASSROOM 12TH GRADE CLASSROOM 11TH GRADE CLASSROOM READ 180 CLASSROOM MULTIPURPOSE/ TECHNOLOGY LAB MULTIPURPOSE/ TECHNOLOGY LAB CFL RECEPTION/WRK AREA CFL OFFICE READ 180 CLASSROOM CFL STAFF TEAMROOM BOYS GIRLS BOYS GIRLS PHYSICS LAB 12TH GRADE CLASSROOM CFL CONFERENCE PHYSICS PREP RM JANITOR 11/12TH SCIENCE CLASSROOM Department Legend ACADEMIC ADMINISTRATION MEP PATHWAYS STAY SUPPORT 2ND FLOOR ACADEMIC ACADEMIC SECOND FLOOR
  10. 10. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 MECHANICAL STAY STG STAFF TOILET SCIENCE PREP MECHANICAL STAFF TOILET ELEC ELEC STAIR C2 STAIR D2 STAIR C1 STAIR D1 ELEV D1 9TH GRADE CLASSROOM 9TH GRADE CLASSROOM 9TH GRADE CLASSROOM SYSTEM 44 CLASSROOM 9TH GRADE SCIENCE CLASSROOM SYSTEM 44 CLASSROOM CTE - BUSINESS 9TH GRADE SCIENCE CLASSROOM 9TH GRADE SCIENCE LAB 9TH GRADE STAFF WORKROOM 9TH GRADE CLASSROOM 9TH GRADE ADMIN 9TH GRADE CLASSROOM 9TH GRADE CLASSROOM 9TH GRADE CLASSROOM 9TH GRADE ADMIN 9TH GRADE STORAGE 9TH GRADE CLASSROOM 9TH GRADE CLASSROOM ELEC 9TH GRADE CLASSROOM 9TH GRADE CLASSROOM CTE - FINANCE PATHWAYS CONFERENCE TECHNOLOGY/INDEPENDENT STUDY LAB BOYS GIRLSBOYS GIRLS SOCIAL WORKER 9TH GRADE SCIENCE CLASSROOM 9TH GRADE STORAGE IDF - C/D IDF - C/D JANITOR PATHWAYS SUITE Department Legend ACADEMIC MEP PATHWAYS STAY SUPPORT 3RD FLOOR ACADEMIC ACADEMIC THIRD FLOOR
  11. 11. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 OUTSIDE EQUIPMENT STORAGE LOADING SERVERY FREEZER CUSTODIAL OFFICE ENGINEER'S OFFICE KITCHEN SHOP/ BREAKROOM WATER/FIRE SERVICE ENTRY STAY SUPPLY STORAGE ELEC CLEAN/ STORAGE PAPER STORAGEOFFICE TOILET COOLER DRY STORAGE DISHWASHING CORRIDORSHOP/ BREAKROOM TOILET TOILET FINISHING COOLER STORAGE FINISH PREP AREA CORRIDOR Department Legend ACADEMIC CUSTODIAL FOOD SERVICE MEP STAY SUPPORT GROUND FLOOR AUDITORIUM AUTISM 1 AUTISM 3AUTISM 2 STAGE AUDITORIUM STAIR B2STAIR B1 AUDITORIUM VESTIBULE AUDITORIUM PREVESTIBULE AUDITORIUM TOILET WOMEN AUDITORIUM TOILET MEN LIFE SKILLS LAB CORRIDOR CORRIDOR WATERWORKS COURTYARD ELEC VESTVEST TICKET BOOTH TERRACE GREEN ROOF OT/PT STAFF REAKROOM CHAIR / PIANO STORAGE GREEN ROOM 2 ELECCE GREEN ROOM 1 STA LEV A1 EECH/ STING SENSORY STAIR A3 TOILET BOYS STAIR A4 CORRIDOR IDF-A/B MECHANICAL CONTROL BOOTH AUDITORIUM MEZZANINE STAIR B1 STAIR B2 IDF -B STORAGE CORRIDOR GROUND FLOOR FIRST FLOOR SECOND FLOORAUDITORIUM
  12. 12. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 WATERWORKS
  13. 13. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 TODDLER AREA ELEC TOILET KIDS TOILET DAYCARE STORAGE DAYCARE OFFICE MECHANICAL OUTSIDE EQUIPMENT STORAGE WOMEN'S LOCKER JAN MENS LOCKER PARKING GENERATOR ELEV A1 STAIR A2 STAIR A1 SUPPLY STORAGE CUSTODIAL EQUIPMENT STORAGE RECEIVING STAY STORAGE STAIR A3 MECHANICAL ELEC STAIR A4 CORRIDOR VEST VEST CMC STORAGE RECYCLING INFANT AREA ELEC IDF - B Department Legend CUSTODIAL FAMILY SUPPORT MEP PARKING STAY SUPPORT GROUND FLOOR ARTS ARTS GROUND FLOOR
  14. 14. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 CHORAL / KEYBOARDING INSTRUMENTAL PRACTICE 4 MUSIC OFFICE ART STORAGE MULTI-PURPOSE STUDIO KILN OT/PT STAFF BREAKROOM CHAIR / PIANO STORAGE GREEN ROOM 2 ELEC 3D/2D STUDIO ART OFFICE INSTRUMENT STORAGE SCENE SHOP GALLERY GREEN ROOM 1 STAIR A1 STAIR A2 STAIR B1 ELEV A1 MEDIA PRODUCTION CLASSROOM SPEECH/ TESTING SENSORY STAIR A3 TOILET BOYS TOILET GIRLS STAIR A4 CORRIDOR ELEC ELEC CORRIDOR CORRIDOR VESTIBULE KEYBOARD STORAGE MUSIC OFFICE VESTIBULEFOLIO / MUSIC STORAGE IDF-A/B ART STORAGE CORRIDOR MEDIA PRODUCTION VIDEO Department Legend ADMINISTRATION MEDIA CENTER MEP PERFORMING ARTS FIRST FLOOR ARTS FIRST FLOOR GALLERY ARTS FIRST FLOOR
  15. 15. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 ACTIVITY • INTERIOR DEMOLITION: ONGOING THROUGH END OF AUGUST • ATRIUM & PAVILION EXCAVATION/FOUNDATIONS: LATE JULY START • MECHANICAL/ELECTRICAL/ • PLUMBING ROUGH IN: ONGOING • MASONRY RESTORATION: ONGOING • NEW WALL CONSTRUCTION: SEPTEMBER START • NEW EXTERIOR WINDOW FABRICATION: AUGUST START • SITE CLEARING AND REGRADING: AUGUST START • WINDOW RESTORATION: AUGUST START • ROOFING: SEPTEMBER START • SUBMITTAL/SHOP DRAWING REVIEW: ONGOING WHAT TO EXPECT IN THE NEXT 30 90 DAYS
  16. 16. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 •52% OF WORK TO DATE HAS BEEN AWARDED TO CBE COMPANIES WITH AN ESTIMATED VALUE OF $64M. •64% OF EMPLOYEES ARE DC RESIDENTS •DC RESIDENTS INTERESTED IN EMPLOYMENT ON THIS OR ANY OTHER DGS CONSTRUCTION PROJECT, VISIT YOUR NEAREST DEPARTMENT OF EMPLOYMENT SERVICES DOES ONE STOP LOCATION TO APPLY FOR EMPLOYMENT. CBE PARTICIPATION BY WARD WARD NUMBER OF CBEs WARD 1 2 WARD 2 2 WARD 3 1 WARD 4 5 WARD 5 8 WARD 6 4 WARD 7 1 WARD 8 1 TOTAL 24 RESIDENT PARTICIPATION BY WARD WARD NUMBER OF DC EMPLOYEES WARD 1 20 WARD 2 14 WARD 3 0 WARD 4 34 WARD 5 12 WARD 6 1 WARD 7 29 WARD 8 37 TOTAL 147 CERTIFIED BUSINESS ENTERPRISE CBE AND DC RESIDENT PARTICIPATION
  17. 17. Roosevelt High School Moderniza on ANC MEETING, JULY 2014 FUTURE QUESTIONS OR COMMENTS ABOUT ROOSEVELT MODERNIZATION Darrell S. Pressley Public Affairs Specialist Office of Government Affairs and Communica ons Department of General Services (202) 698-7703 (office) darrell.pressley@dc.gov
  18. 18. Elevating the Quality of Life in the Districtality of Life in the Districty f fElevating theg aQuaQ SITE OVERVIEW
  19. 19. Elevating the Quality of Life in the District SCHOOL SITE PLAN
  20. 20. A P P R O V E D S C H E M A T I C D E S I G N - P O W E L L E L E M E N T A R Y S C H O O L ISTUDIOarchitecture | design | planning 2.June.2013 B4 DN UP UP UP DN UP DN DN DN GRAND STAIR 347 SF PRO. LITERACY RM. CORRIDOR GIRLS 2964 SF AUDITORIUM VESTIBULE LOBBY GIRLS CORRIDOR VEST. 1003 SF KINDERGARTEN 1003 SF KINDERGARTEN 76 SF SECURITY ATRIUM TEACHER'S TOILET 1616 SF KITCHEN 864 SF FIRST GRADE 864 SF FIRST GRADE 864 SF FIRST GRADE 835 SF FIRST GRADE CORRIDOR 446 SF PRINC. OFF / CONF RM 355 SF HEALTH BOYS VEST. ATRIUM KINDERGARTEN 1000 SF 408 SF SE RESOURCE ROOM PRE-KINDERGARTEN 1000 SF PRE-SCHOOL 1000 SF PRE-KINDERGARTEN 1000 SF PRE-SCHOOL 1000 SF PRE-SCHOOL 1027 SF KINDERGARTEN 1053 SF * 252 SF CUST. OFFICE 612 SF RECEIVING AREA 163 SF ADMIN. WK. 170 SF BK. RM. 426 SF FAMILY RESPECT CNTR WEL. CENTER 440 SF GALLERY 55 SF JAN. CL. PRE-KINDERGARTEN 1022 SF RECORD RM. 141 SF MAIL RM. 118 SF ELEC. 2682 SF DINING/AUDITORIUM |ProposedPlans|MasterPlan-FloorPlans 0 16 32 Basement PlanFirst Floor Plan Master Plan MECH. RM ELEC. RM. BOILER ROOM UP CRAWL SPACE 200 SF TOILET / SHOWER 150 SF CUST. OFFICE
  21. 21. A P P R O V E D S C H E M A T I C D E S I G N - P O W E L L E L E M E N T A R Y S C H O O L ISTUDIOarchitecture | design | planning 2.June.2013 B5 DN DN GRAND STAIR BOYS 524 SF SPEECH RM. 845 SF SECOND GRADE CORRIDOR BOYS TER JAN. CL. GIRLS 773 SF FOURTH GRADE 1078 SF COLLABORATION ROOM CORRIDOR STAGE STO. STAGE STO. 328 SF SCIENCE STO. 519 SF TEACH. OFF. (2) 168 SF SUPPORT OFFICE TR 1704 SF LIBRARY 970 SF COMPUTER LAB 848 SF FOURTH GRADE 848 SF FIFTH GRADE 834 SF FIFTH GRADE 849 SF FIFTH GRADE CORRIDOR ATRIUM 1340 SF ART 1348 SF MUSIC LAB THIRD GRADE 803 SF 280 SF BK. RM. THIRD GRADE 849 SF SECOND GRADE 844 SF THIRD GRADE 895 SF SECOND GRADE 885 SF 120 SF VP OFF. * ** 258 SF GUID. OFF 817 SF STUDENT INTRV. RM + GUID. OFF. 350 SF RESOURCE ROOM 174 SF SUPPORT OFFICE 173 SF SUPPORT OFFICE ELEC. 259 SF EX. DAY CORRIDOR 120 SF BUS. MGT 103 SF INST. COACH CORRIDOR FOURTH GRADE 830 SF STAFF LOUNGE 380 SF |ProposedPlans|MasterPlan-FloorPlans 0 16 32 Second Floor Plan Master Plan
  22. 22. A P P R O V E D S C H E M A T I C D E S I G N - P O W E L L E L E M E N T A R Y S C H O O L ISTUDIOarchitecture | design | planning 2.June.2013 C3 |DesignNarrative|Perspectives
  23. 23. A P P R O V E D S C H E M A T I C D E S I G N - P O W E L L E L E M E N T A R Y S C H O O L ISTUDIOarchitecture | design | planning 2.June.2013 C4 |DesignNarrative|Perspectives
  24. 24. A P P R O V E D S C H E M A T I C D E S I G N - P O W E L L E L E M E N T A R Y S C H O O L ISTUDIOarchitecture | design | planning 2.June.2013 C5 |DesignNarrative|Perspectives
  25. 25. Elevating the Quality of Life in the District Pros • Accessible from street • Flat Cons • Solar Access – Shaded by large trees • Too small at 6,000 sf (existing community garden is 14,000 sf) • Highly visible and public location might be more appropriate for other uses like open play area Pros SITE PLAN: OPTION #1
  26. 26. Elevating the Quality of Life in the District SITE PLAN: OPTION #2 Pros • Maximize Green Space at Powell ES • Good Solar Access for Gardens • Views from Garden • Central Location • Maximize Under Utilized Spaces • Equitable to Both DCPS & DPR Cons • Brush and Mechanical Equipment Needs Removal Required at Parking Site • Possible Re-grading or retaining wall at Parking Site

×