SlideShare a Scribd company logo
1 of 46
Download to read offline
the dynamic
workspace…
…an Emaar story
today’s journey
the story
design
realisation
conclusions
today’s journey
the story
design
realisation
conclusions
the vision
“I think the time
has come for Emaar
to roll to an
incredible level. You
know the story of
the phoenix, it
always rises up…”
Mohamed Alabbar
Chairman, Emaar
the story
Led by chairman Mohammed Alabbar, from agile beginnings in site
offices around Downtown Dubai, Emaar fought with an entrepreneurial
spirit to create one of the largest most dynamic property developers in
the world…
…Emaar wished to reinvigorate their organisation, to replenish their
energy for the present and future challenges…
they decided to relocate their entire team to Emaar Square and create a
new more dynamic and collaborative workplace…
a workplace to meet their aspirations for efficiency and effectiveness…
to engage and inspire the team to reflect the Emaar brand vision…
Emaar’s motivational initiative for highly efficient and effective working…
dynamic transformation
• Spread over 6 floors
• Fragmented departments
• Limited shared facilities
• Cellular / compartmented
• Excessive storage space
• Uninspiring interiors
• Limited facilities
Previous offices
Emaar Business Park
• New dynamic workplace
Transformation
• 6,250m2
• 3 Floors linked
• 15 depts. in one location
• In the heart of Downtown
• Open-plan, efficient
• Collaborative
New Headquarters
Emaar Square
key requirements and drivers for change
• dynamic, collaborative, efficient and effective working
• inspiring and unique design
• promotion of the Emaar initiative “NOW - no other way!”
• align business requirements with space planning
• consolidation of all departments in one location
• personnel attraction and retention
• environmental quality: wellbeing, daylight, ergonomics
• impacting the bottom line
concept design direction
“We’ve lost some of our traditionally personal approach to doing business here in the
Middle East. The individual enclosed workstation is not the answer...
We now look to create collaborative communities in the office of the future.”
past social present enclosed future community
today’s journey
the story
design
realisation
conclusions
understanding the client’s requirements
data gathering stakeholder workshops communication
Corporate Office TBC Corporate Services 23 23
8 nos of Drivers & 3+1 nos in
Mail Room
1
Corporate Office TBC Emaar Security 16 13 3 Yes
Additional requirement 2pax
4x5m Security Room
1
Corporate Office TBC Human Resources 10 9 1 Yes
2 nos Receptionists, 5x4m HR
Store req'd
1
Corporate Office TBC Internal Audit 14 11 2 1 Yes 1
Corporate Office TBC
Performance
Management
4 2 2 1
Dubai Operations TBC Finance 19 18 1
Any fire proof cabinets
required?
1
Emaar
Community Mgmt
TBC
Community
Management
58 57 1
8 nos of Technical Services
Engineers & 2 nos of
Landscape Engineers
1
Emaar
Community Mgmt
TBC
Finance Community
Management
28 28 1
Emaar
Community Mgmt
TBC
FM Community
Service
4 4 1
Emaar Retail (EM) TBC
ERG Human
Resources
5 5 Yes Require fire proof cabinets 1
Head Office
(EMG)
TBC
EMG Human
Resources
17 16 1 Yes
2 nos of Drivers, 2 nos of
Receptionists, 1 nos of Office
boy and 1 Payroll Executive
1
LEVEL 1 Dept Sub-Total 198 186 0 11 0 1 0 0
Overall Level 1 occupany per
sqm
11.9
85
client brief
• daylight
• long work-tables
• dynamic planning
• open-plan
• no doors
• meeting pods
• raw „loft‟ style
• simple flooring
• no ceilings
development context
With burj
“In the heart of Emaar‟s premier development with excellent transport links and facilities…”
co-dependencies of brand and culture
space can be a powerful tool to both create and reflect culture and brand
promote creativity
…it’s what sets you apart
dynamic opportunities
open - door policy / “no door” policy dynamic meetings
“ we spend far too much time sitting in meetings behind closed doors!…
we will have only 1 seated meeting table and only 1 meeting room with doors…”
aesthetics
corporate Emaar HQ - uniquehighly
branded
“bring your brand to life”
flexible open plan work settings
efficiency innovation
• Minimise enclosures
• Go open plan
• Centralised facilities
• Flexible spaces
• Lifecycle costing
• Automated systems
• Harness natural light
• Collaboration
• Proximity to facilities
Reception/Lobby
Oasis
Hot desk zone
Meeting rooms
Executive office
Meeting hubs
Pantry pod
Shared services
Internal stair
Open plan work areas
Storage
Neighborhood 4
Neighborhood 5
Hot desks
Break
Out Hubs
pods
Office
Office
Office
Office
Main
Entrance
Reception
neighbourhood concept
Enhanced dynamics and collaboration through neighbourhood concept…
level 1 layout
burj views
• No. of Workstations 155
• No. of offices 1
• Total Occupancy 160
• Net Floor Area 2,373m2
• Occupancy 1 person / 14m2
Central interconnecting staircase provides connectivity
between floors without using elevators
arrive
level 2 layout
burj views
• No. of Workstations 180
• No. of offices 8
• Total Occupancy 185
• Net Floor Area 2,373m2
• Occupancy 1 person / 12m2
Space planning allows organic growth and contraction
of departments and teams.
level 4 layout
burj views
• No. of Workstations 109
• No. of offices 3
• Total Occupancy 114
• Net Floor Area 1,186m2
• Occupancy 1 person / 10m2
• Plus café space
Flexible central resource draws co-workers together
in a variety of collaborative settings.
oasis
connect
Thoughtfully located flexible spaces accommodate different meeting types and technology
requirements at various acoustic and privacy levels
interactive spaces
meeting room
Touchdown pod
Open meeting space
Meeting room
Acoustic meeting booth
“Ampitheatre”
Project room
Ad hoc meeting poufs
pantry
collaborate
innovative design approach
innovative use of materials eco materials non commercial FF&E
unique finishes
green design elements
• dwp integrated design approach is the preferred
approach as set out by the USGBC for a true
LEED sustainable project.
• we call it “Intrinsic Sustainable Design” which
has green ideas at the heart of every design
decision. For example, without doors to
enclosed spaces, we halved the HVAC
requirement.
• although LEED certification was not a client
requirement, we undertook LEED assessment
throughout the design and construction stages
MEP / ITC design
• new Cat 6 cabling
• wifi connectivity throughout
• state of the art Comms Rooms
• overhaul of existing VAV system
• FM200 systems in filing and Comms Rooms
• Bio Oxygen filtration system to café
• low energy lighting systems
structural design
• create large opening in
post-tensioned slab
• insert pre-fabricated
steel staircase
• exposed structural
beams and steelwork
connections
today’s journey
the story
design
realisation
conclusions
delivery
• dwp undertook design, tender and construction stage services
• 12 weeks design and tender programme
• 14 weeks construction programme
2nd floor reception
Dynamism : Emaar is a market leader with a dynamic team, this is
reflected in their open workspace.
1st floor reception
Anyone who has been to Emaar HQ will feel the energy created by this
new collaborative open-plan environment.
4th floor reception
dwp and Emaar have created a dynamic and unique design
approach to the office environment for the region.
1st floor meeting spaces
A small number of meeting rooms serve a large workforce, the ‘standing’
tables ensure meetings are swift and productive
work / meet
This special project was created from a strong vision and simple brief
from the client, which the designers swiftly realised through an intense
design process.
agile working
Raw materials and textures invigorate the senses. No carpets, ceilings
or other standard materials are used
collaborate
This inspirational, dynamic workplace design promotes efficient and
effective working… “NOW no other way!”….
social
LEED credits were gained by e.g. the space planning, material
selections, MEP BMS programming and LED lighting which was
installed throughout.
today’s journey
the story
design
realisation
conclusions
measurable findings
• Expanded occupation: 1:11m2
• Expansion possibilities: 1:9m2
• Productivity: + 20%
• Meeting durations: - 45%
• Inter-department collaboration: increased
conclusions
• PFA concrete flooring with locally recycled screed
• 100% recyclable 43% recycled marmoleum flooring
• All gypsum board produced in the UAE
• 90% of the existing MEP services re-used
• All paints low VOC content
Recycled products have been used and sourced locally
“Simply the best office design I have ever seen… A
vibrant open office where business really gets done
fast…”
Javed Magray, Director - Projects, Emaar

More Related Content

What's hot

Office interior design considerations
Office interior design considerationsOffice interior design considerations
Office interior design considerationsMuhammad Tariq
 
library architecture
library architecturelibrary architecture
library architectureNeha Rampuria
 
Architectural design - Case Study on Restaurants
Architectural design - Case Study on RestaurantsArchitectural design - Case Study on Restaurants
Architectural design - Case Study on RestaurantsArafat Akash
 
Office design
Office designOffice design
Office design鹏 泽
 
Cochin vernacular architecture
Cochin   vernacular architectureCochin   vernacular architecture
Cochin vernacular architectureMohamed Faseehun
 
Deconstructivism and Critical Regionalism
Deconstructivism and Critical RegionalismDeconstructivism and Critical Regionalism
Deconstructivism and Critical RegionalismAbhiniti Garg
 
Zaha Hadid - interior design works
Zaha Hadid - interior design worksZaha Hadid - interior design works
Zaha Hadid - interior design worksPranavi Nandagiri
 
Hassan fathy's vernacular architecture
Hassan fathy's vernacular architectureHassan fathy's vernacular architecture
Hassan fathy's vernacular architectureAniket Mahajan
 
Centre for blinds and visually impaired
Centre for blinds and visually impairedCentre for blinds and visually impaired
Centre for blinds and visually impairedMayur karodia
 
12.11.2.22 -sensory experience in architecture-dissertation.pptx
12.11.2.22 -sensory experience in architecture-dissertation.pptx12.11.2.22 -sensory experience in architecture-dissertation.pptx
12.11.2.22 -sensory experience in architecture-dissertation.pptxSHALININIVETHAD
 
Sustainability in interior design, Architecture
Sustainability in interior design, ArchitectureSustainability in interior design, Architecture
Sustainability in interior design, Architecturemahmood Albrifkany
 
Case Study On Parametric architecture
Case Study On Parametric architecture Case Study On Parametric architecture
Case Study On Parametric architecture ShraddhaGholap2
 
Presentation on Works of Architect Raj Rewal
Presentation on Works of Architect Raj RewalPresentation on Works of Architect Raj Rewal
Presentation on Works of Architect Raj RewalArchistudent Portal
 

What's hot (20)

ARCH OFFICE
ARCH OFFICEARCH OFFICE
ARCH OFFICE
 
Office interior design considerations
Office interior design considerationsOffice interior design considerations
Office interior design considerations
 
BIOPHILIC DESIGN
BIOPHILIC DESIGNBIOPHILIC DESIGN
BIOPHILIC DESIGN
 
library architecture
library architecturelibrary architecture
library architecture
 
Zaha hadid
Zaha hadidZaha hadid
Zaha hadid
 
Architectural design - Case Study on Restaurants
Architectural design - Case Study on RestaurantsArchitectural design - Case Study on Restaurants
Architectural design - Case Study on Restaurants
 
I.M. Pei
I.M. PeiI.M. Pei
I.M. Pei
 
Office design
Office designOffice design
Office design
 
Cochin vernacular architecture
Cochin   vernacular architectureCochin   vernacular architecture
Cochin vernacular architecture
 
Blobitecture
BlobitectureBlobitecture
Blobitecture
 
Deconstructivism and Critical Regionalism
Deconstructivism and Critical RegionalismDeconstructivism and Critical Regionalism
Deconstructivism and Critical Regionalism
 
Zaha Hadid - interior design works
Zaha Hadid - interior design worksZaha Hadid - interior design works
Zaha Hadid - interior design works
 
Hassan fathy's vernacular architecture
Hassan fathy's vernacular architectureHassan fathy's vernacular architecture
Hassan fathy's vernacular architecture
 
Centre for blinds and visually impaired
Centre for blinds and visually impairedCentre for blinds and visually impaired
Centre for blinds and visually impaired
 
12.11.2.22 -sensory experience in architecture-dissertation.pptx
12.11.2.22 -sensory experience in architecture-dissertation.pptx12.11.2.22 -sensory experience in architecture-dissertation.pptx
12.11.2.22 -sensory experience in architecture-dissertation.pptx
 
Sustainability in interior design, Architecture
Sustainability in interior design, ArchitectureSustainability in interior design, Architecture
Sustainability in interior design, Architecture
 
Case Study On Parametric architecture
Case Study On Parametric architecture Case Study On Parametric architecture
Case Study On Parametric architecture
 
Presentation on Works of Architect Raj Rewal
Presentation on Works of Architect Raj RewalPresentation on Works of Architect Raj Rewal
Presentation on Works of Architect Raj Rewal
 
Biophilic architecture
Biophilic architectureBiophilic architecture
Biophilic architecture
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 

Viewers also liked

Workplace-as-a-Service Presentation
Workplace-as-a-Service PresentationWorkplace-as-a-Service Presentation
Workplace-as-a-Service PresentationDanny Runnels
 
Pelatihan Manajemen Organisasi
Pelatihan Manajemen OrganisasiPelatihan Manajemen Organisasi
Pelatihan Manajemen Organisasiajijogja
 
Social Marketing for Real Estate Investors
Social Marketing for Real Estate InvestorsSocial Marketing for Real Estate Investors
Social Marketing for Real Estate InvestorsPatch of Land
 
Workplace-as-a-Service
Workplace-as-a-ServiceWorkplace-as-a-Service
Workplace-as-a-ServiceDanny Runnels
 
Client Management 101
Client Management 101Client Management 101
Client Management 101robheller
 
Agile workplace presentation
Agile workplace presentationAgile workplace presentation
Agile workplace presentationLove Englund
 
Client management.ppt
Client management.pptClient management.ppt
Client management.pptAlex de Jong
 
Understanding Workspaces for Tomorrow
Understanding Workspaces for TomorrowUnderstanding Workspaces for Tomorrow
Understanding Workspaces for TomorrowDImension Data
 
Frank Jermusek: How To Create A Real Estate Marketing Plan
Frank Jermusek: How To Create A Real Estate Marketing PlanFrank Jermusek: How To Create A Real Estate Marketing Plan
Frank Jermusek: How To Create A Real Estate Marketing PlanFrank Jermusek
 
Ibm presentation ppt
Ibm presentation pptIbm presentation ppt
Ibm presentation pptravish28
 

Viewers also liked (12)

Workplace-as-a-Service Presentation
Workplace-as-a-Service PresentationWorkplace-as-a-Service Presentation
Workplace-as-a-Service Presentation
 
The dynamic new workplace
The dynamic new workplaceThe dynamic new workplace
The dynamic new workplace
 
Pelatihan Manajemen Organisasi
Pelatihan Manajemen OrganisasiPelatihan Manajemen Organisasi
Pelatihan Manajemen Organisasi
 
Social Marketing for Real Estate Investors
Social Marketing for Real Estate InvestorsSocial Marketing for Real Estate Investors
Social Marketing for Real Estate Investors
 
Workplace-as-a-Service
Workplace-as-a-ServiceWorkplace-as-a-Service
Workplace-as-a-Service
 
Client Management 101
Client Management 101Client Management 101
Client Management 101
 
Agile workplace presentation
Agile workplace presentationAgile workplace presentation
Agile workplace presentation
 
Agile Office Spaces
Agile Office SpacesAgile Office Spaces
Agile Office Spaces
 
Client management.ppt
Client management.pptClient management.ppt
Client management.ppt
 
Understanding Workspaces for Tomorrow
Understanding Workspaces for TomorrowUnderstanding Workspaces for Tomorrow
Understanding Workspaces for Tomorrow
 
Frank Jermusek: How To Create A Real Estate Marketing Plan
Frank Jermusek: How To Create A Real Estate Marketing PlanFrank Jermusek: How To Create A Real Estate Marketing Plan
Frank Jermusek: How To Create A Real Estate Marketing Plan
 
Ibm presentation ppt
Ibm presentation pptIbm presentation ppt
Ibm presentation ppt
 

Similar to The Dynamic Workspace: An Emaar story

Max House Okhla - Future Of WorkSpace
Max House Okhla - Future Of WorkSpaceMax House Okhla - Future Of WorkSpace
Max House Okhla - Future Of WorkSpacepalakmonga3
 
CityHive at Swansea House — Preview Presentation
CityHive at Swansea House — Preview PresentationCityHive at Swansea House — Preview Presentation
CityHive at Swansea House — Preview PresentationWe Are Arising
 
Simon Carter, Head of Corporate Property at National Grid -
Simon Carter, Head of Corporate Property at National Grid - Simon Carter, Head of Corporate Property at National Grid -
Simon Carter, Head of Corporate Property at National Grid - Global Business Events
 
Suzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteSuzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteTechGigDotCom
 
InnoMark VSM Presentation 03_16_16 (2)
InnoMark VSM Presentation 03_16_16 (2)InnoMark VSM Presentation 03_16_16 (2)
InnoMark VSM Presentation 03_16_16 (2)Patrick Connor
 
Smart Buildings + Intelligent Solutions
Smart Buildings + Intelligent SolutionsSmart Buildings + Intelligent Solutions
Smart Buildings + Intelligent SolutionsBob Sawhill, CFM
 
Simon Carter, Head of Corporate Property for National Grid - Estate Strategy ...
Simon Carter, Head of Corporate Property for National Grid - Estate Strategy ...Simon Carter, Head of Corporate Property for National Grid - Estate Strategy ...
Simon Carter, Head of Corporate Property for National Grid - Estate Strategy ...Global Business Events
 
Innovation and Entrepreneurship - Boost Innovation by working with start-ups ...
Innovation and Entrepreneurship - Boost Innovation by working with start-ups ...Innovation and Entrepreneurship - Boost Innovation by working with start-ups ...
Innovation and Entrepreneurship - Boost Innovation by working with start-ups ...Ken Dooley
 
Lendlease Case Study
Lendlease Case StudyLendlease Case Study
Lendlease Case StudyIan MacHenry
 
Industrial Real Estate in Kolkata - Ganesh Complex
Industrial Real Estate in Kolkata - Ganesh Complex  Industrial Real Estate in Kolkata - Ganesh Complex
Industrial Real Estate in Kolkata - Ganesh Complex Ganesh Complex
 
Building a Millennial Mainframe Powerhouse: 7 Tips to Attract and Retain Mill...
Building a Millennial Mainframe Powerhouse: 7 Tips to Attract and Retain Mill...Building a Millennial Mainframe Powerhouse: 7 Tips to Attract and Retain Mill...
Building a Millennial Mainframe Powerhouse: 7 Tips to Attract and Retain Mill...Compuware
 
Digital Transformation and Interweaving at BrightTALK 2017 December
Digital Transformation and Interweaving at BrightTALK 2017 DecemberDigital Transformation and Interweaving at BrightTALK 2017 December
Digital Transformation and Interweaving at BrightTALK 2017 DecemberAnders W. Tell
 
SDC Intergate.Ashburn Brochure
SDC Intergate.Ashburn BrochureSDC Intergate.Ashburn Brochure
SDC Intergate.Ashburn BrochureArleneECarvalho
 
IIDEX The Modern Meeting room sept 27 2013
IIDEX The Modern Meeting room sept 27 2013IIDEX The Modern Meeting room sept 27 2013
IIDEX The Modern Meeting room sept 27 2013John Leonardelli
 
TCL Product Deviation Print Report
TCL Product Deviation Print ReportTCL Product Deviation Print Report
TCL Product Deviation Print ReportShubham Kumar
 
Oracle Essbase in the Cloud A Mercer Advisors Success Story
Oracle Essbase in the Cloud A Mercer Advisors Success StoryOracle Essbase in the Cloud A Mercer Advisors Success Story
Oracle Essbase in the Cloud A Mercer Advisors Success StoryPerficient, Inc.
 

Similar to The Dynamic Workspace: An Emaar story (20)

Max House Okhla - Future Of WorkSpace
Max House Okhla - Future Of WorkSpaceMax House Okhla - Future Of WorkSpace
Max House Okhla - Future Of WorkSpace
 
CityHive at Swansea House — Preview Presentation
CityHive at Swansea House — Preview PresentationCityHive at Swansea House — Preview Presentation
CityHive at Swansea House — Preview Presentation
 
Simon Carter, Head of Corporate Property at National Grid -
Simon Carter, Head of Corporate Property at National Grid - Simon Carter, Head of Corporate Property at National Grid -
Simon Carter, Head of Corporate Property at National Grid -
 
Zyeta Introductory
Zyeta IntroductoryZyeta Introductory
Zyeta Introductory
 
Suzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteSuzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya Gumaste
 
InnoMark VSM Presentation 03_16_16 (2)
InnoMark VSM Presentation 03_16_16 (2)InnoMark VSM Presentation 03_16_16 (2)
InnoMark VSM Presentation 03_16_16 (2)
 
Lean Office
Lean OfficeLean Office
Lean Office
 
Smart Buildings + Intelligent Solutions
Smart Buildings + Intelligent SolutionsSmart Buildings + Intelligent Solutions
Smart Buildings + Intelligent Solutions
 
Simon Carter, Head of Corporate Property for National Grid - Estate Strategy ...
Simon Carter, Head of Corporate Property for National Grid - Estate Strategy ...Simon Carter, Head of Corporate Property for National Grid - Estate Strategy ...
Simon Carter, Head of Corporate Property for National Grid - Estate Strategy ...
 
Innovation and Entrepreneurship - Boost Innovation by working with start-ups ...
Innovation and Entrepreneurship - Boost Innovation by working with start-ups ...Innovation and Entrepreneurship - Boost Innovation by working with start-ups ...
Innovation and Entrepreneurship - Boost Innovation by working with start-ups ...
 
AIPL PROFILE - 2023 (2).pdf
AIPL PROFILE - 2023 (2).pdfAIPL PROFILE - 2023 (2).pdf
AIPL PROFILE - 2023 (2).pdf
 
Lendlease Case Study
Lendlease Case StudyLendlease Case Study
Lendlease Case Study
 
Resume
ResumeResume
Resume
 
Industrial Real Estate in Kolkata - Ganesh Complex
Industrial Real Estate in Kolkata - Ganesh Complex  Industrial Real Estate in Kolkata - Ganesh Complex
Industrial Real Estate in Kolkata - Ganesh Complex
 
Building a Millennial Mainframe Powerhouse: 7 Tips to Attract and Retain Mill...
Building a Millennial Mainframe Powerhouse: 7 Tips to Attract and Retain Mill...Building a Millennial Mainframe Powerhouse: 7 Tips to Attract and Retain Mill...
Building a Millennial Mainframe Powerhouse: 7 Tips to Attract and Retain Mill...
 
Digital Transformation and Interweaving at BrightTALK 2017 December
Digital Transformation and Interweaving at BrightTALK 2017 DecemberDigital Transformation and Interweaving at BrightTALK 2017 December
Digital Transformation and Interweaving at BrightTALK 2017 December
 
SDC Intergate.Ashburn Brochure
SDC Intergate.Ashburn BrochureSDC Intergate.Ashburn Brochure
SDC Intergate.Ashburn Brochure
 
IIDEX The Modern Meeting room sept 27 2013
IIDEX The Modern Meeting room sept 27 2013IIDEX The Modern Meeting room sept 27 2013
IIDEX The Modern Meeting room sept 27 2013
 
TCL Product Deviation Print Report
TCL Product Deviation Print ReportTCL Product Deviation Print Report
TCL Product Deviation Print Report
 
Oracle Essbase in the Cloud A Mercer Advisors Success Story
Oracle Essbase in the Cloud A Mercer Advisors Success StoryOracle Essbase in the Cloud A Mercer Advisors Success Story
Oracle Essbase in the Cloud A Mercer Advisors Success Story
 

Recently uploaded

Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一A SSS
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...mrchrns005
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)jennyeacort
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
cda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptcda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptMaryamAfzal41
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 

Recently uploaded (20)

Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
cda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptcda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis ppt
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 

The Dynamic Workspace: An Emaar story

  • 4. the vision “I think the time has come for Emaar to roll to an incredible level. You know the story of the phoenix, it always rises up…” Mohamed Alabbar Chairman, Emaar
  • 5. the story Led by chairman Mohammed Alabbar, from agile beginnings in site offices around Downtown Dubai, Emaar fought with an entrepreneurial spirit to create one of the largest most dynamic property developers in the world… …Emaar wished to reinvigorate their organisation, to replenish their energy for the present and future challenges… they decided to relocate their entire team to Emaar Square and create a new more dynamic and collaborative workplace… a workplace to meet their aspirations for efficiency and effectiveness… to engage and inspire the team to reflect the Emaar brand vision…
  • 6. Emaar’s motivational initiative for highly efficient and effective working…
  • 7. dynamic transformation • Spread over 6 floors • Fragmented departments • Limited shared facilities • Cellular / compartmented • Excessive storage space • Uninspiring interiors • Limited facilities Previous offices Emaar Business Park • New dynamic workplace Transformation • 6,250m2 • 3 Floors linked • 15 depts. in one location • In the heart of Downtown • Open-plan, efficient • Collaborative New Headquarters Emaar Square
  • 8. key requirements and drivers for change • dynamic, collaborative, efficient and effective working • inspiring and unique design • promotion of the Emaar initiative “NOW - no other way!” • align business requirements with space planning • consolidation of all departments in one location • personnel attraction and retention • environmental quality: wellbeing, daylight, ergonomics • impacting the bottom line
  • 9. concept design direction “We’ve lost some of our traditionally personal approach to doing business here in the Middle East. The individual enclosed workstation is not the answer... We now look to create collaborative communities in the office of the future.” past social present enclosed future community
  • 11. understanding the client’s requirements data gathering stakeholder workshops communication Corporate Office TBC Corporate Services 23 23 8 nos of Drivers & 3+1 nos in Mail Room 1 Corporate Office TBC Emaar Security 16 13 3 Yes Additional requirement 2pax 4x5m Security Room 1 Corporate Office TBC Human Resources 10 9 1 Yes 2 nos Receptionists, 5x4m HR Store req'd 1 Corporate Office TBC Internal Audit 14 11 2 1 Yes 1 Corporate Office TBC Performance Management 4 2 2 1 Dubai Operations TBC Finance 19 18 1 Any fire proof cabinets required? 1 Emaar Community Mgmt TBC Community Management 58 57 1 8 nos of Technical Services Engineers & 2 nos of Landscape Engineers 1 Emaar Community Mgmt TBC Finance Community Management 28 28 1 Emaar Community Mgmt TBC FM Community Service 4 4 1 Emaar Retail (EM) TBC ERG Human Resources 5 5 Yes Require fire proof cabinets 1 Head Office (EMG) TBC EMG Human Resources 17 16 1 Yes 2 nos of Drivers, 2 nos of Receptionists, 1 nos of Office boy and 1 Payroll Executive 1 LEVEL 1 Dept Sub-Total 198 186 0 11 0 1 0 0 Overall Level 1 occupany per sqm 11.9 85
  • 12. client brief • daylight • long work-tables • dynamic planning • open-plan • no doors • meeting pods • raw „loft‟ style • simple flooring • no ceilings
  • 13. development context With burj “In the heart of Emaar‟s premier development with excellent transport links and facilities…”
  • 14. co-dependencies of brand and culture space can be a powerful tool to both create and reflect culture and brand
  • 16. dynamic opportunities open - door policy / “no door” policy dynamic meetings “ we spend far too much time sitting in meetings behind closed doors!… we will have only 1 seated meeting table and only 1 meeting room with doors…”
  • 17. aesthetics corporate Emaar HQ - uniquehighly branded “bring your brand to life”
  • 18. flexible open plan work settings
  • 19. efficiency innovation • Minimise enclosures • Go open plan • Centralised facilities • Flexible spaces • Lifecycle costing • Automated systems • Harness natural light • Collaboration • Proximity to facilities Reception/Lobby Oasis Hot desk zone Meeting rooms Executive office Meeting hubs Pantry pod Shared services Internal stair Open plan work areas Storage
  • 20. Neighborhood 4 Neighborhood 5 Hot desks Break Out Hubs pods Office Office Office Office Main Entrance Reception neighbourhood concept Enhanced dynamics and collaboration through neighbourhood concept…
  • 21. level 1 layout burj views • No. of Workstations 155 • No. of offices 1 • Total Occupancy 160 • Net Floor Area 2,373m2 • Occupancy 1 person / 14m2 Central interconnecting staircase provides connectivity between floors without using elevators
  • 23. level 2 layout burj views • No. of Workstations 180 • No. of offices 8 • Total Occupancy 185 • Net Floor Area 2,373m2 • Occupancy 1 person / 12m2 Space planning allows organic growth and contraction of departments and teams.
  • 24. level 4 layout burj views • No. of Workstations 109 • No. of offices 3 • Total Occupancy 114 • Net Floor Area 1,186m2 • Occupancy 1 person / 10m2 • Plus café space Flexible central resource draws co-workers together in a variety of collaborative settings.
  • 26. Thoughtfully located flexible spaces accommodate different meeting types and technology requirements at various acoustic and privacy levels interactive spaces meeting room Touchdown pod Open meeting space Meeting room Acoustic meeting booth “Ampitheatre” Project room Ad hoc meeting poufs pantry
  • 28. innovative design approach innovative use of materials eco materials non commercial FF&E
  • 30. green design elements • dwp integrated design approach is the preferred approach as set out by the USGBC for a true LEED sustainable project. • we call it “Intrinsic Sustainable Design” which has green ideas at the heart of every design decision. For example, without doors to enclosed spaces, we halved the HVAC requirement. • although LEED certification was not a client requirement, we undertook LEED assessment throughout the design and construction stages
  • 31. MEP / ITC design • new Cat 6 cabling • wifi connectivity throughout • state of the art Comms Rooms • overhaul of existing VAV system • FM200 systems in filing and Comms Rooms • Bio Oxygen filtration system to café • low energy lighting systems
  • 32. structural design • create large opening in post-tensioned slab • insert pre-fabricated steel staircase • exposed structural beams and steelwork connections
  • 34. delivery • dwp undertook design, tender and construction stage services • 12 weeks design and tender programme • 14 weeks construction programme
  • 35. 2nd floor reception Dynamism : Emaar is a market leader with a dynamic team, this is reflected in their open workspace.
  • 36. 1st floor reception Anyone who has been to Emaar HQ will feel the energy created by this new collaborative open-plan environment.
  • 37. 4th floor reception dwp and Emaar have created a dynamic and unique design approach to the office environment for the region.
  • 38. 1st floor meeting spaces A small number of meeting rooms serve a large workforce, the ‘standing’ tables ensure meetings are swift and productive
  • 39. work / meet This special project was created from a strong vision and simple brief from the client, which the designers swiftly realised through an intense design process.
  • 40. agile working Raw materials and textures invigorate the senses. No carpets, ceilings or other standard materials are used
  • 41. collaborate This inspirational, dynamic workplace design promotes efficient and effective working… “NOW no other way!”….
  • 42. social LEED credits were gained by e.g. the space planning, material selections, MEP BMS programming and LED lighting which was installed throughout.
  • 44. measurable findings • Expanded occupation: 1:11m2 • Expansion possibilities: 1:9m2 • Productivity: + 20% • Meeting durations: - 45% • Inter-department collaboration: increased
  • 45. conclusions • PFA concrete flooring with locally recycled screed • 100% recyclable 43% recycled marmoleum flooring • All gypsum board produced in the UAE • 90% of the existing MEP services re-used • All paints low VOC content Recycled products have been used and sourced locally
  • 46. “Simply the best office design I have ever seen… A vibrant open office where business really gets done fast…” Javed Magray, Director - Projects, Emaar