4. Chemicals&petrochemicals
2
Chemicals & petrochemicals
C 2 0 1
Gas and Chemical Complex
ProjectTitle Gas and Chemical Complex
Project summary
Project Idea Establishment of production of lower olefins from natural gas
and their subsequent polymerization of 1 million tons olefins,
450 thousand tons of ethylene, 550 thousand tons of propylene,
followed by polymerization.The project is planned to be
launched in 2015-2016.
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 1370
Total Project Budget $2638.84 mln
Financial and Economic Indicators
NPV $806.39 mln
IRR % 21.7
Discount Rate % 15.0
Discounted Payback Period (years) 6.8
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Project Initiator: OJSC «Tatneftekhiminvest-holding»
5. Chemicals&petrochemicals
3
Chemicals & petrochemicals
C 2 0 2
Modernization and subsequent production
extension of Alabuga – Plastic LLC
ProjectTitle
Modernization and subsequent production extension
of Alabuga – Plastic LLC
Project summary
Project Idea Modernization and subsequent production extension of
Alabuga – Plastic LLC
Location Industrial Zone Alabuga, the Republic ofTatarstan
Estimated Number of Jobs Created 106
Total Project Budget $2.0 mln
Funds Requested $1.6 mln
Financial and Economic Indicators
NPV $0.6 mln
IRR % 19
Discount Rate % 11
Discounted Payback Period (years) 5.5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
6. Chemicals&petrochemicals
4
Establishment of polyester thread
and polyester fibers production
ProjectTitle Establishment of polyester thread
and polyester fibers production
Project summary
Project Idea Project involves construction of the first complex in Russia
on production of polyester fibers with production capacity of
60 thousand tons per year for the textile industry, polyester
high-modular low-shrinkable threads (HMLS) and high-strength
polyester technical threads (HM) with capacity of 12 thousand
tons per year for production.
Location Elabuga, the Republic ofTatarstan
Estimated Number of Jobs Created 600
Total Project Budget $257.8 mln
Financial and Economic Indicators
NPV $35.5 mln
IRR % 37.8
Discount Rate % 15.0
Discounted Payback Period (years) 15
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Chemicals & petrochemicals
C 2 0 3
7. Chemicals&petrochemicals
5
Ethylene complex
and other derivatives production
ProjectTitle Ethylene complex and other derivatives production
Project summary
Project Idea Ethylene complex and derivatives (the 1st stage of the project).
The total budget of the project is $3.21 bln, of which 40% is
equity funds, 60% is debt funds.
Location Nizhnekamsk, the Republic ofTatarstan
Total Project Budget $1 239.3 mln
Financial and Economic Indicators
Discount Rate % 11
Discounted Payback Period, years 9.8
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Project Initiator: OJSC «Nizhnekamskneftekhim»
Chemicals & petrochemicals
C 2 0 4
8. Chemicals&petrochemicals
6
Construction of maleic anhydride
production plant
ProjectTitle Construction of maleic anhydride production plant
Project summary
Project Idea The project involves construction of maleic anhydride production
plant.The project is at the stage of technical selection
Location The Republic ofTatarstan
Total Project Budget $60.67mln
Financial and Economic Indicators
Discount Rate % 10
Discounted Payback Period (years) 6.6
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Project Initiator: OJSC «Tatneftekhiminvest-holding»
Chemicals & petrochemicals
C 2 0 5
9. Chemicals&petrochemicals
7
Heavy Oil Residues
processing plant
ProjectTitle Heavy Oil Residue processing plant
Project summary
Project Idea Project involves construction of heavy oil residue processing
plant with the raw material usage capacity of 2 mln tons per
year based on heavy oil residue hydro conversion process with
the use of nano sized catalysts. Feasibility study has been
taken; researches on hydro conversion have been undertaken.
Technology has been tested at laboratories and process
development units.
Location Nizhnekamsk, the Republic ofTatarstan
Total Project Budget $408 mln
Financial and Economic Indicators
Discount Rate % 15
Payback Period (years) 4.7
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Project Initiator: OJSC «Tatneftekhiminvest-holding»
Chemicals & petrochemicals
C 2 0 6
11. Machinery&automotivepartsproduction
9
Development of automobile components
production by Closed Joint Stock Company
«Aktanysh Aggregate Plant»
ProjectTitle
Development of automobile components production
by CJSC Aktanysh Aggregate Plant
Project summary
Project Idea The project involves increasing the production scale (hangers and
brakes' components) in order to provide the demand of KAMAZ
Group
Location Aktanysh, the Republic ofTatarstan
Estimated Number of Jobs Created 16
Total Project Budget $1.00 mln
Funds Requested $0.24 mln
Financial and Economic Indicators
NPV $0.14 mln
IRR % 17
Discount Rate % 11
Discounted Payback Period (years) 3.5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Machinery & automotive parts production
М 3 0 1
12. Machinery&automotivepartsproduction
10
Construction of the plant
for automotive parts production
ProjectTitle Construction of the plant for automotive parts production
Project summary
Project Idea Creation of the plant with world standard production in the
Republic ofTatarstan with capacity over 30 tons per year;
–The creation of sustainable supply canals of the automotive
components and other components for key manufacturers of the
machine-building products in Russia;
– Implementation of new quality standards in the Autonormal
segment components producers and other types of components.
Thus, support of the Russia and the Republic ofTatarstan
authorities efforts in the improving of the international
competitiveness in industrial sector.
Location Menzelinsk, the Republic ofTatarstan
Estimated Number of Jobs Created 270
Total Project Budget $215.8mln
Financial and Economic Indicators
IRR % 24
Discount Rate % 9
Discounted Payback Period (years) 7.9
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Machinery & automotive parts production
М 3 0 2
13. Machinery&automotivepartsproduction
11
The organization of modern production
of fuel tanks for trucks
ProjectTitle
The organization of modern production of
fuel tanks for trucks
Project summary
Project Idea Fuel tanks production and their subsequent delivery for new
established enterprises and plants in Russia:Volvo-Kaluga,
SCANIA-C. Petersburg, Daimler-KAMAZ, Iveco AMT and for
others producers of trucks as well: KAMAZ JSC, AZ ‘Ural’ OJSC.
The production will be based on robotic technology.There is no
Mass Production of the analogs of our technology in the Russian
Federation.
Location Naberezhnye Chelny, the Republic ofTatarstan
Estimated Number of Jobs Created 99
Total Project Budget $8.9 mln
Financial and Economic Indicators
NPV $6.9 mln
IRR % 31
Discount Rate % 12
Discounted Payback Period (years) 4.2
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Machinery & automotive parts production
М 3 0 3
14. Machinery&automotivepartsproduction
12
Development and re-equipment
of ALNAS JSC
ProjectTitle Development and re-equipment of ALNAS JSC
Project summary
Project Idea Re-equipment of automotive parts production plant will allow to
make production more profitable due to the possibility of using
new materials and process optimization
Location Almetevsk, the Republic ofTatarstan
Total Project Budget $37.4 mln
Funds Requested $28.3 mln
Financial and Economic Indicators
NPV $44.5 mln
Discount Rate % 10
Discounted Payback Period (years) 5.1
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Machinery & automotive parts production
М 3 0 4
15. Machinery&automotivepartsproduction
13
Forging Production for manufacture of
the automotive suspension
ProjectTitle
Forging Production for manufacture of the automotive
suspension
Project summary
Project Idea The project objective is forging production organization to
manufacture the automotive suspension elements. Products
manufactured within the project are meant for suspension
elements:
-Torque rod
- Steering rod pin
- Steering rod end
- Pneumatic suspension
Location Nabereznye Chelny, the Republic ofTatarstan
Estimated Number of Jobs Created 78
Total Project Budget $8.0 mln
Financial and Economic Indicators
NPV $3.7 mln
IRR % 29
Discount Rate % 13
Discounted Payback Period (years) 5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Machinery & automotive parts production
М 3 0 5
16. Machinery&automotivepartsproduction
14
Production of energy-efficient
high-power batteries for vehicles
Machinery & automotive parts production
М 3 0 6
ProjectTitle Production of energy-efficient
high-power batteries for vehicles
Project summary
Project Idea Organization of the production developed by HimRusEnergo
LLC. Energy-efficient start-up batteries will provide a guaranteed
start-up for the any engine at the temperature level even less
than minus 50ºС.
Location Naberezhnye Chelny, the Republic ofTatarstan
Estimated Number of Jobs Created 21
Total Project Budget $14.45 mln
Funds Requested $7.22 mln
Financial and Economic Indicators
NPV $6.2 mln
IRR % 14
Discount Rate % 9
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
17. Machinery&automotivepartsproduction
15
Modernization of foundry
ProjectTitle Modernization of foundry
Project summary
Project Idea Establishment of modern high-tech foundry with new production
facilities.This project involves the expansion and modernization
of existing production foundry equipment. It is planned to
manufacture complex shaped castings of aluminum alloys under
high pressure in the mold and energy-efficient LED lamps.The
target customers are KAMAZ JSC and other joint ventures, the
defense industry companies, appliance manufacturers.
Location Naberezhnye Chelny, the Republic ofTatarstan
Estimated Number of Jobs Created 20
Total Project Budget $10 mln
Financial and Economic Indicators
NPV $3.9 mln
IRR % 15.3
Discount Rate % 12.0
Discounted Payback Period (years) 2.2
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Machinery & automotive parts production
М 3 0 7
18. Machinery&automotivepartsproduction
16
Modernization
of existing manufacture
ProjectTitle Modernization of existing manufacture
Project summary
Project Idea Re-equipment of foundry engineering for the reduction of
net costs and quality improvement by the means of foundry
modernization. Manufacture modernization is going to increase
production capacity of iron casting to 250,000 tons per year, of
non-ferrous castings to 64,000 tons per year.
Location Naberezhniye Chelny, the Republic ofTatarstan
Estimated Number of Jobs Created 5000
Total Project Budget $391.65 mln
Financial and Economic Indicators
NPV $158.52 mln
IRR % 24.5
Discounted Payback Period (years) 3.5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Machinery & automotive parts production
М 3 0 8
19. maChinery&automotivepartsproduCtion
17
Automobile seat production
maChinery&automotivepartsproduCtion
ProjectTitle Automobile seat production
Project summary
Project Idea Project envisages the production of automobile seats. Production
program is to produce 40 000 sets of seats per year. Land with
the size of 15 840 m2 is ready for the production allocation.
Location Elabuga, the Republic ofTatarstan
Estimated Number of Jobs 432
Total Project Budget $ 12.85 mln
Funds Requested $ 6.43 mln
Financial and Economic Indicators
NPV $3.23 mln
Discount Rate, % 12
Discounted Payback Period (years) 7.25
Contacts
Tatarstan Investment Development Agency,
Tel.:+7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Machinery & automotive parts production
М 3 0 9
21. Construction&buildingmaterialsproduction
19
Plant of PLASTBAU panels’ production
ProjectTitle Plant of PLASTBAU panels’ production
Project summary
Project Idea Production of construction elements made of expanded
polystyrene, exploiting equipment and the technology of the
Swiss company PLASTEDIL Int.Ltd.The technology is known
under the trademark ‘PLASTBAU’. ‘PLASTBAU’ panels use
advantageously differs from acting technology.
Location Zakamskaya Zone, the Republic ofTatarstan
Estimated Number of Jobs Created 34
Total Project Budget $10.62 mln
Funds Requested $10.59 mln
Financial and Economic Indicators
NPV $1.40 mln
IRR % 19.6
Discount Rate % 13.1
Discounted Payback Period (years) 3.4
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 0 1
22. Construction&buildingmaterialsproduction
20
Local transport
and logistics center
ProjectTitle Local transport and logistics center
Project summary
Project Idea The project involves the construction of a local (presumably
unit) logistics center, including production areas (for repairs,
loading and unloading of road transport), associated buildings
and structures in order to facilitate the modernization of the
transport system and ensure the coordinated work of all types
of transport that will link transport system with terminal and
logistics.The project will contribute to the development of
the industrial sector of the economy, the need to ensure the
competitiveness of the special economic zone, the creation of
conditions for small and medium-sized businesses.
Location Elabuga, the Republic ofTatarstan
Estimated Number of Jobs Created 45
Total Project Budget $8.1 mln
Financial and Economic Indicators
NPV $6.1 mln
IRR % 39
Discount Rate % 8
Discounted Payback Period (years) 2.2
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 0 2
23. Construction&buildingmaterialsproduction
21
Low water demand cement production
with the use of non-metallic minerals
ProjectTitle
Low water demand cement production
with the use of non-metallic minerals
Project summary
Project Idea Project involves production of water demand cement.
Competitive advantages of low water demand cement, when
compared to artificial cement, are low net costs, exploitation of
local raw materials and superior technical characteristics.
Location Elabuga, the Republic ofTatarstan
Estimated Number of Jobs Created 97
Total Project Budget $24.53 mln
Financial and Economic Indicators
NPV $6.10 mln
IRR % 21.49
Discount Rate % 15.00
Discounted Payback Period (years) 7.75
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 0 3
24. Construction&buildingmaterialsproduction
22
Construction of cargo and passenger river port
with transport logistics
ProjectTitle
Construction of cargo and passenger river port
with transport logistics
Project summary
Project Idea Project is meant to provide high-quality logistics services to the
special economic zone ‘Alabuga’, the Kama region and south-
eastern part of the Republic ofTatarstan with the prospective
entrance to the Russian cargo transportation market of the
Volga region and Central Russia.The extensive transportation
and logistics network will be created through the construction of
three major complexes of ‘river-sea’ cargo port, which will allow
to receive transit vessels, ferry terminals, transport, and logistics
service centers.
Location Elabuga, the Republic ofTatarstan
Estimated Number of Jobs Created 2132
Total Project Budget $159.7 mln
Funds Requested $135.8 mln
Financial and Economic Indicators
NPV $66.4 mln
IRR % 27
Discount Rate % 8
Discounted Payback Period (years) 4.7
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 0 4
25. Construction&buildingmaterialsproduction
23
Technopark
«Alabuga»
ProjectTitle Technopark ‘Alabuga’
Project summary
Project Idea
The project involves production facilities and business center
construction with the organization of the pilot production
module and demonstration sites, research and development,
service and infrastructure units. Project offers its tenants
assistance in implementing of innovative projects in various
fields, promotion in small and medium-sized manufacturing
business development.
Location Elabuga, the Republic ofTatarstan
Estimated Number of Jobs Created 600
Total Project Budget $36.7 mln
Funds Requested $19.1 mln
Financial and Economic Indicators
NPV $53.7 mln
IRR % 41
Discount Rate % 8
Discounted Payback Period (years) 3.3
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 0 5
26. Construction&buildingmaterialsproduction
24
Construction of the toll highway Shali (M-7) –
Bavly (M-5) as part of the new federal
highway route Kazan – Orenburg
in the Republic ofTatarstan
ProjectTitle
Construction of the toll highway Shali (M-7) – Bavly (M-5)
as part of the new federal highway route Kazan – Orenburg
in the Republic ofTatarstan
Project summary
Project Idea Establishment of the new transport route of a national
importance. Construction of the modern motorway network in
the main directions flows as part of the motor transport route
‘St. Petersburg –Vologda –Yoshkar-Ola – Kazan – Orenburg –
the border of the Republic of Kazakhstan’The development
of highways in accordance with the needs of the residents,
Russian economy and transport infrastructure of the Republic of
Tatarstan
Location The Republic ofTatarstan
Estimated Number of Jobs Created Over 2000
Total Project Budget $3.21 bil
Funds Requested $2.52 bil
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 0 6
27. Construction&buildingmaterialsproduction
25
Establishment of Sviazhsky
interregional multimodal logistic Center
ProjectTitle
Establishment of Sviazhsky interregional
multimodal logistic Center
Project summary
Project Idea Project involves the establishment of infrastructure that meets
international standards and reduces timing and financial costs
of maintenance on existing trade flows of international transport
corridors'East-West’and‘North-South’andprospective –‘Europe-
Western China’. Project envisages obtaining revenue from the
transport and service activities such as acceptance, temporary
storage,processing,distribution,documentation,andshipmentof
goods to the destination, provided by the established multimodal
logistics center next to the station Sviyazhsk. The complex will
include a rail-road terminal with warehouses and container yard,
a river port with a water-truck terminal, access tracks and roads,
loading and unloading areas, service facilities.
Location Zelenodolsk, the Republic ofTatarstan
Estimated Number of Jobs Created -
Total Project Budget $609.54 mln
Funds Requested $271.70 mln
Financial and Economic Indicators
NPV $253.20 mln
IRR % 17.5
Discount Rate % 8.2
Discounted Payback Period (years) 9.6
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 0 7
28. Construction&buildingmaterialsproduction
26
Construction of the Shore cement terminal
for cement storage and transfer to Kazan city
ProjectTitle
Construction of the Shore cement terminal
for cement storage and transfer to Kazan city
Project summary
Project Idea The idea of the project is to offer service for cement storage and
transfer to Kazan city with buffer storage capacity of 8000 tons
and capacity of cement transfer through water and railway
transport of up to 500 000 tons per year.
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 15
Total Project Budget $8.5 mln
Financial and Economic Indicators
NPV $14.6 mln
IRR % 38.5
Discount Rate % 19.0
Discounted Payback Period (years) 5.2
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 0 8
29. Construction&buildingmaterialsproduction
27
Cable fitting
production plant
ProjectTitle Cable fitting production plant
Project summary
Project Idea Project involves construction of the Cable fitting of 110-220 kW
production plant.The project is planned to be realized at techno
polis ‘INVENT’. Engineering and transport infrastructure has been
prepared. Financing is expected to be covered both by equity
capital and debt.
Location Laishevsky District, the Republic ofTatarstan
Total Project Budget $21.92 mln
Financial and Economic Indicators
Discount Rate % 18
Discounted Payback Period (years) 5.4
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 0 9
30. Construction&buildingmaterialsproduction
28
Nanomodified granulated
composite material production
ProjectTitle Nanomodified granulated composite material production
Project summary
Project Idea Project involves nanomodified granulated composite material
production, as well as production of products made of it (for
vehicle components and specified construction materials).The
project is going to be realized at 'Kazan aviation industrial group
named after Gorbunov S.P.’.The share of the partners is expected
to make up 51 percent.
Location Kazan, the Republic ofTatarstan
Total Project Budget $60.97 mln
Financial and Economic Indicators
Discounted Payback Period (years) 8.5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 1 0
31. Construction&buildingmaterialsproduction
29
Logistics Park
«Krugloe Pole»
ProjectTitle Logistics Park ‘Krugloe Pole’
Project summary
Project Idea Construction of the multi-modal logistics park as the part of the
national innovation system to ensure the development of the
region, including infrastructure establishment necessary for the
needs of industrial facilities. Rationale:The rapid development of
the region and the lack of high-tech warehouses of class ‘A’.
Location Tukaevsky district, the Republic ofTatarstan
Estimated Number of Jobs Created 2500
Total Project Budget $94.03 mln
Funds Requested $38.34 mln
Financial and Economic Indicators
NPV $10.11mln
IRR % 20.68
Discount Rate % 12.70
Discounted Payback Period (years) 6.1
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 1 1
32. Construction&buildingmaterialsproduction
30
Establishment
of building blocks production
ProjectTitle Establishment of building blocks production
Project summary
Project Idea Project involves the establishment of building blocks production
with production capacity of 1200 standard blocks (188x190x390)
per day
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 25
Total Project Budget $58 mln
Financial and Economic Indicators
NPV $71 mln
IRR % 49
Discount Rate % 20
Discounted Payback Period (years) 1.3
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 1 2
33. Construction&buildingmaterialsproduction
31
Production of cement and carbon dioxide
based on the environment friendly
melt-thermal technology
ProjectTitle
Production of cement and carbon dioxide based on the
environment friendly melt-thermal technology
Project summary
Project Idea The technology is designed for production of up to 200 tons of
cement per year.The technology is going to be environment
friendly due to the absence of combustion and high
productiveness, so that it uses small amount of natural raw
resources and has low level of industrial waste.The production is
going to be located in the close proximity to consumers.
Location the Republic ofTatarstan
Estimated Number of Jobs Created 75
Total Project Budget $13.3 mln
Payback Period (years) 2.2
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 1 3
34. Construction&buildingmaterialsproduction
32
Plant on structural steel production
for the road and energy facilities
ProjectTitle
Plant on structural steel production for the road and energy
facilities
Project summary
Project Idea Construction of new plant on structural steel production for the
road and energy facilities
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 79
Total Project Budget $8.2 mln
Funds Requested $3.3 mln
Financial and Economic Indicators
NPV $0.7 mln
IRR % 12.68
Discount Rate % 20
Discounted Payback Period (years) 6.33
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 1 4
35. Construction&buildingmaterialsproduction
33
Multifunctional residential complex
«Mezhdurech’ye»
ProjectTitle Multifunctional residential complex ‘Mezhdurech’ye’
Project summary
Project Idea
Construction of the Multifunctional residential complex
‘Mezhdurech’ye’. High level comfort housing with an economy
class hotel and shopping center, yacht club, shopping, office
and business centers.The size of the land allocated for building
is 3.7 hectares.The planned volume of housing construction in
2015 is 70 000 m2.The project provides residential complex with
comfortable accommodation from 22.04.2011 №13-PFA
Location Naberezhnye Chelny, the Republic ofTatarstan
Total Project Budget $99.4 mln
Funds Requested $49.7 mln
Financial and Economic Indicators
IRR % 35
Discount Rate % 10
Discounted Payback Period (years) 3.5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 1 5
36. Construction&buildingmaterialsproduction
34
Building and commissioning of new high-comfort
class residential house on Hadi Atlasi Street
ProjectTitle
Building and commissioning of new high-comfort class
residential house on Hadi Atlasi Street
Project summary
Project Idea The main goal is to improve the territory and develop additional
areas with high-comfort conditions.The company is going to buy
a land, with subsequent construction and commissioning of high-
comfort class residential house
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 62
Total Project Budget $6.6 mln
Financial and Economic Indicators
NPV $2.6 mln
IRR % 65.57
Discount Rate % 11
Discounted Payback Period (years) 2.6
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 1 6
37. Construction&buildingmaterialsproduction
35
Modified plaster
dry mix
ProjectTitle Modified plaster dry mix
Project summary
Project Idea Commercial development of new formulations and technologies
of gypsum plaster and plastering dry building mixes is based
on the mineral resources of the Republic ofTatarstan. Physical
and technical properties of dry building mixes can be controlled
by means of a complex of modifying chemical and mineral
supplements, including those based on industrial by-products.
The nomenclature of gypsum building mixes produced in the
Republic ofTatarstan does not meet current needs.
Implementation of the proposed idea will expand the use of local
mineral and chemical products, provide the construction market
ofTatarstan with high quality and competitive dry plaster mixes
and replace imported counterparts.
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 25
Total Project Budget $0.9 mln
Funds Requested $0.8 mln
Financial and Economic Indicators
NPV $0.3 mln
IRR % 28
Discount Rate % 13
Discounted Payback Period (years) 2.9
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 1 7
38. Construction&buildingmaterialsproduction
36
Modular
boiler construction
ProjectTitle Modular boiler construction
Project summary
Project Idea Construction of modular boiler (GSB) Kaleykino for heating the
elementary school and kindergarten. Project implementation is
planning to be on Public-Private Partnership principles.
Location Almetyevsky district, the Republic ofTatarstan
Total Project Budget $0.15mln
Financial and Economic Indicators
NPV $0.15 mln
IRR % 15
Discount Rate % 6
Discounted Payback Period (years) 9
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 1 8
39. Construction&buildingmaterialsproduction
37
Organization of the production of units
from wood and concrete permanent formwork
ProjectTitle
Organization of the production of units from wood and
concrete permanent formwork
Project summary
Project Idea The aim of the project is to establish the enterprise in a special
economic zone ‘Alabuga’, producing blocks of permanent
formwork for the civil and industrial construction. Proposed
construction technology allows building affordable and
comfortable houses, which meets the requirements of SNiP on
heat and noise protection, both low-rise and high-rise apartment
buildings.
Location Elabuga, the Republic ofTatarstan
Estimated Number of Jobs Created 51
Total Project Budget $9.1 mln
Funds Requested $6.5 mln
Financial and Economic Indicators
NPV $9.1 mln
IRR % 72.9
Discount Rate % 15.0
Discounted Payback Period (years) 2.2
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 1 9
40. Construction&buildingmaterialsproduction
38
Organization of prefabricated
wooden houses’ production
ProjectTitle Organization of prefabricated wooden houses’ production
Project summary
Project Idea The essence of the project is to establish enterprise producing
sets such as panels of the walls and ceilings, beams, floors
and roof for the highly prefabricated low-rise wooden houses.
Along with the frame-panel house-building technology, a
German technology of the massive wooden wall panels
production is going to be used, which combines the advantages
of conventional panel and the traditional massive wooden
construction and deprived of their disadvantages will be applied.
Location Naberezhnye Chelny, the Republic ofTatarstan
Estimated Number of Jobs Created 87
Total Project Budget $5.9 mln
Funds Requested $3.9 mln
Financial and Economic Indicators
NPV $7.1 mln
IRR % 45.28
Discount Rate % 16.00
Discounted Payback Period (years) 3.82
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 2 0
41. Construction&buildingmaterialsproduction
39
C 4 2 1
Quick collapsible parking elevator
with the modular design of the device
ProjectTitle
Quick collapsible parking elevator
with the modular design of the device
Project summary
Project Idea Creating a network of high-rise car parks with automatic vehicles’
delivery.The chain of high-rise parking relieves city traffic and
solves the problem of parking spaces’ shortage.
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 5
Total Project Budget $0.16 mln
Financial and Economic Indicators
NPV $0.08 mln
IRR % 19.77
Discount Rate % 13.30
Discounted Payback Period (years) 2.4
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
42. Construction&buildingmaterialsproduction
40
New mall and indoor market
complex building & exploitation
ProjectTitle New mall and indoor market complex building & exploitation
Project summary
Project Idea
The project goals are:
– mall and indoor market complex building,
– to rent commercial spaces out,
– to get profit.
To achieve these goals it is necessary to implement the following
tasks:
– to get a loan;
– to build the mall;
– to build the market complex;
– to coordinate the work of mall and market complex;
– to cooperate with tenants.
Location Naberezhnye Chelny, the Republic ofTatarstan
Estimated Number of Jobs Created 29
Total Project Budget $25 mln
Funds Requested $20 mln
Financial and Economic Indicators
NPV $3.6 mln
IRR % 35
Discount Rate % 16
Discounted Payback Period (years) 4.2
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 2 2
43. Construction&buildingmaterialsproduction
41
Construction of waste sorting
and waste recycling complex
ProjectTitle Construction of waste sorting and waste recycling complex
Project summary
Project Idea Construction of waste processing complex with annual capacity
of 20 000 tons of solid waste processing and organization of
production based on secondary resources, building materials,
products of secondary polymers, structural products, products
for household use.
Location Yelabuga, the Republic ofTatarstan
Estimated Number of Jobs Created 40
Total Project Budget $16.6 mln
Funds Requested $14.9 mln
Financial and Economic Indicators
NPV $8.4 mln
IRR % 24
Discount Rate % 8
Discounted Payback Period (years) 5.8
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
C 4 2 3
44. Construction&buildingmaterialsproduction
42
C 4 2 4
Establishment
of metalware hardware production
ProjectTitle Establishment of metalware hardware production
Project summary
Project Idea Metalware hardware production with high added value.
Innovative electrolytic-plasmatic technology is used for roll
processing.The second direction will be establishment of
engineering production of electrolytic-plasmatic modules for
modernization of metallurgical productions
Location SEZ Alabuga, the Republic ofTatarstan
Estimated Number of Jobs Created 100
Total Project Budget $11.15 mln
Funds Requested $9.38 mln
Financial and Economic Indicators
IRR % 62%
Discount Rate % 25%
Discounted Payback Period (years) 4
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Construction & building materials production
45. Construction&buildingmaterialsproduction
43
C 4 2 5
Reconstruction of the main drain water lift up
from 4th water lifting to ‘TatAISneft’ camera
Construction & building materials production
ProjectTitle
Reconstruction of the main drain water lift up from 4th water
lifting to ‘TatAISneft’ camera
Project summary
Project Idea Improving the quality of water, reduction of network losses
Location Almetyevsk-Minnibaevo, the Republic ofTatarstan
Total Project Budget $3.13 mln
Funds Requested $2.04 mln
Financial and Economic Indicators
Discounted Payback Period (years) 20
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
46. Construction&buildingmaterialsproduction
44
C 4 2 6
Reconstruction ofVolga water
intake water treatment facility
Construction & building materials production
ProjectTitle Reconstruction ofVolga water intake water treatment facility
Project summary
Project Idea Modernization of cleansing waterworks on theVolga water intake
with the use of modern methods of cleaning is required for the im-
provement of water quality of the given drinking-water systems
Location Каzan, the Republic ofTatarstan
Estimated Number of Jobs Created 79
Total Project Budget $69.38 mln
Funds Requested $46.4 mln
Financial and Economic Indicators
IRR % 0.1
Discount Rate % 0.1
Discounted Payback Period (years) 22.1
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
47. Construction&buildingmaterialsproduction
45
C 4 2 7
Construction of water supply unit «Tetsevsky»
with the construction of water pipeline from the
Volga intake to the water supply site «Tetsevsky»
Construction & building materials production
ProjectTitle
Construction of water supply unit «Tetsevsky» with the
construction of water pipeline from theVolga intake to the
water supply site «Tetsevsky»
Project summary
Project Idea Surface water deficit coverage at existing residential
development and the newly built-up M-1, M-2 of Aviastroitelny
district
Location Каzan, the Republic ofTatarstan
Estimated Number of Jobs Created 36
Total Project Budget $34.73 mln
Funds Requested $28.78 mln
Financial and Economic Indicators
IRR % 9.90
Discount Rate % 0.07
Discounted Payback Period (years) 9.9
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
48. Construction&buildingmaterialsproduction
46
Production of high thermal efficient
building blocks, using a patented material
‘Silica granite’
Construction & building materials production
ProjectTitle
Production of high thermal efficient building blocks,
using a patented material ‘Silica granite’
Project summary
Project Idea Production of building materials using cutting-edge equipment in
cooperation with Russian Research Institution. Silica granite is a
new generation material used for construction.
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 10
Total Project Budget $0.48 mln
Funds Requested $0.42 mln
Financial and Economic Indicators
NPV $0.35 mln
IRR % 20
Discount Rate % 12
Discounted Payback Period (years) 2.4
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
C 4 2 8
49. Construction&buildingmaterialsproduction
47
Construction of passenger gallery with travolator
from underground station ‘Kremlevskaya’
to railway station ‘Kazan-1’
Construction & building materials production
ProjectTitle
Construction of passenger gallery with travolator
from underground station ‘Kremlevskaya’
to railway station ‘Kazan-1’
Project summary
Project Idea Glassed-in passenger gallery with travolator from underground
station ‘Kremlevskaya’ to railway station ‘Kazan-1’ is supposed
to create multifunctional transfer hub based on railway station
‘Kazan-1’
Location Kazan, the Republic ofTatarstan
Total Project Budget $40.60 mln
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
C 4 2 9
50. Construction&buildingmaterialsproduction
48
Rolling stock park renovation
ProjectTitle Rolling stock park renovation
Project summary
Project Idea According to the project, 5 UKVZ 71-623 coaches are going
to be bought each year from 2012 to 2016. Rolling stock park
renovation will reduce maintenance costs, further safety and
comfort of the trip.
Location Nizhnekamsk, the Republic ofTatarstan
Total Project Budget $12.05 mln
Financial and Economic Indicators
Discounted Payback Period (years) Over 10 years
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Construction & building materials production
C 4 3 0
51. Construction&buildingmaterialsproduction
49
Transfer from central heat distribution station
to individual heating units
ProjectTitle
Transfer from central heat distribution station to individual
heating units
Project summary
Project Idea Transfer from central heat distribution station to individual
heating units to consumers with the hot water provision function
Location The Republic ofTatarstan
Total Project Budget $26.55 mln
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Construction & building materials production
C 4 3 1
52. ConstruCtion&buildingmaterialsproduCtion
50
ConstruCtion&buildingmaterialsproduCtion
Reinforcing steel net production
ProjectTitle Reinforcing steel net production
Project summary
Project Idea Production of reinforcing steel net, which can be used in
reinforced concrete construction, glass, plastic, ceramics,
gypsum works, and so on
Location Almetyevsk, the Republic ofTatarstan
Total Project Budget $0.75 mln
Funds Requested $0.53 mln
Financial and Economic Indicators
IRR % 46.6
Discount Rate % 25.0
Discounted Payback Period (years) 2.98
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Construction & building materials production
C 4 3 2
53. ConstruCtion&buildingmaterialsproduCtion
51
Production of ceramic bricks
ProjectTitle Production of ceramic bricks
Project summary
Project Idea Construction of ceramic brick factory with subsequent production
output of 30 mln bricks per year based on Bolsheaksinskiy Staro-
Kakerlinskiy clay deposit
Location Drozhzhanovsky district, the Republic ofTatarstan
Estimated Number of Jobs Created 100
Total Project Budget $40.00 mln
Funds Requested $9.67 mln
Financial and Economic Indicators
Discount Rate % 30
Discounted Payback Period (years) 4
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Construction & building materials production
C 4 3 3
54. Construction&buildingmaterialsproduction
52
ProjectTitle Construction of new tram-line Pr.Stroiteley –Yuzhnaya Str.
Project summary
Project Idea Construction of new tramline of 3.9 km double track road and
7.8 km solitary track road, construction of railway substation of
container type (1800 kV)
Location Nizhnekamsk, the Republic ofTatarstan
Estimated Number of Jobs Created 66
Total Project Budget $13.15 mln
Financial and Economic Indicators
Discounted Payback Period (years) Over 15 years
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Construction of new tram-line
Pr. Stroiteley –Yuzhnaya Str.
Construction & building materials production
C 4 3 4
55. Construction&buildingmaterialsproduction
53
Modernization
of Urussinsky State District Power Plant
ProjectTitle Modernization of Urussinsky State District Power Plant
Project summary
Project Idea Project involves three stages: 1. CCGT unit construction – 127
MW; 2. Construction of heating line to Oktyabrsky andTuymazi
city (the Republic of Bashkortastan) 3. Deep reconstruction of old
part of station
Location Yutazinsky district, the Republic ofTatarstan
Total Project Budget $241.09 mln
(Stage I – $147.87 mln,
Stage II – $45.00 mln,
Stage III – $48.22 mln)
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Construction & building materials production
C 4 3 5
57. Medicine&pharmaceuticals
55
Technopark ‘Medical science centre ‘Eydos’
in the high medicine technology field
ProjectTitle
Technopark ‘Medical science centre ‘Eydos’
(high medicine technology field)
Project summary
Project Idea Establishment of advanced medical science centre, which will
improve general level of healthcare in Russia due to domestic
researches development
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 2500
Total Project Budget $38.52 mln
Funds Requested $28.92 mln
Financial and Economic Indicators
Payback Period (years) 6
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Medicine & pharmaceuticals
H 5 0 1
58. Medicine&pharmaceuticals
56
Organization of the plant of medicines, drugs and
other medical goods in the Republic ofTatarstan
ProjectTitle Organization of the plant of medical preparation, drugs and
other medical goods in the Republic ofTatarstan.
Project summary
Project Idea Construction of the new pharmaceutical plant on aseptic
medicine production (infusion) meeting international
requirements
Location SEZ ‘Alabuga’, the Republic ofTatarstan
Estimated Number of Jobs Created 147
Total Project Budget $62.0 mln
Funds Requested $61.9 mln
Financial and Economic Indicators
IRR % 49.00
Discount Rate % 17.42
Discounted Payback Period (years) 3.8
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Medicine & pharmaceuticals
H 5 0 2
59. Medicine&pharmaceuticals
57
Establishment
of the ointments production
ProjectTitle Establishment of the ointments production
Project summary
Project Idea The aim of the project is to meet healthcare requirements of
high-quality essential medicines in Russia and the Republic of
Tatarstan and to set affordable prices.
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 29
Total Project Budget $8.5 mln
Funds Requested $6.8 mln
Financial and Economic Indicators
NPV $6.4 mln
IRR % 72.5
Discount Rate % 20.0
Discounted Payback Period (years) 3.5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Medicine & pharmaceuticals
H 5 0 3
61. IT&telecommunications
59
Appointments
ProjectTitle Appointments
Project summary
Project Idea
Pluggable online booking SaaS solution for offline services
such as sport clubs, banks, restaurants, clinics, cinemas, service
stations, education centres and others.
Idea is taken from Online Avia sales and Hotel booking systems
and applied to other services.
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 20
Total Project Budget $1.0 mln
Funds Requested $0.8 mln
Financial and Economic Indicators
NPV $0.33 mln
IRR % 24.5
Discount Rate % 15.0
Discounted Payback Period (years) 3.5
Contacts
Tatarstan Investment Development Agency,
Tel/:+7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail:tida@tatar.ru
IT & telecommunications
I 6 0 1
62. IT&telecommunications
60
Online checkpoint
ProjectTitle Online checkpoint
Project summary
Project Idea Innovative approach for generating online sales
Challenge is to attract more customers to online stores.
Solution is to subscribe to ready-to-use online checkpoint service
based on customer loyalty programs. Service will add game
mechanics to your web store and generate more customer traffic.
Idea is taken from similar offline projects which broke through US
retail market in 2011 and applied to online stores
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 20
Total Project Budget $1.2 mln
Funds Requested $1.02 mln
Financial and Economic Indicators
NPV $0.33 mln
IRR % 24.5
Discount Rate % 15.0
Discounted Payback Period (years) 3.5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
IT & telecommunications
I 6 0 2
63. IT&telecommunications
61
WebComSystem
ProjectTitle WebComSystem
Project summary
Project Idea The project represents a fundamentally new communication
system to integrate the manufacturing segment of small and
medium-sized businesses in a single trading network with the
financial and information center anywhere in the world.
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 106
Total Project Budget $6.5 mln
Funds Requested $4.5 mln
Financial and Economic Indicators
NPV $5.8 mln
IRR % 50
Discount Rate % 28
Discounted Payback Period (years) 4
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
IT & telecommunications
I 6 0 3
64. IT&telecommunications
62
Product-Test
ProjectTitle Product-Test
Project summary
Project Idea
To build the first Russian consumer products rating & review
service, analogous of Consumer Reports (U.S.) orWhich? (U.K.).
Location The Republic ofTatarstan
Estimated Number of Jobs Created 11-14
Total Project Budget $0.7 mln
Funds Requested $0.7 mln
Financial and Economic Indicators
NPV $25 mln
IRR % 280
Discount Rate % 10
Discounted Payback Period (years) 1.7
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
IT & telecommunications
I 6 0 4
65. IT&telecommunications
63
Establishment of nanotechnology centre
ProjectTitle Establishment of nanotechnology centre
Project summary
Project Idea
Establishment of nanotechnology centre for creating technologi-
cal and engineering support for companies and implementation
of new technology in the field of nanotechnology. Current share-
holders are Rusnano OJSC,Tatneftehiminvest OJSC, Investment
andVenture Fund of the Republic ofTatarstan state non-financial
organization. Investors’ participation is expected to be in the
form of equity financing.
Location Kazan, the Republic ofTatarstan
Total Project Budget $118.78 mln
Financial and Economic Indicators
Discount Rate % 18
Discounted Payback Period (years) 5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
IT & telecommunications
I 6 0 5
66. IT&telecommunications
64
Territorially detached innovative centre
‘INNOPOLIS’
IT & telecommunications
ProjectTitle Territorially detached innovative centre ‘INNOPOLIS’
Project summary
Project Idea Innopolis is a new Russian city, which is specifically made for
providing working and education process in IT sphere.The
project will make it possible for young high-qualified experts
from all over the country to work together, which will enhance
innovative development of Russia.
Location Verhneuclonsky District, the Republic ofTatarstan
Estimated Number of Jobs Created 60 000
Total Project Budget $2150 mln
Funds Requested $1075 mln
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
I 6 0 6
67. IT&telecommunications
65
CG WIFI
ProjectTitle CG WIFI
Project summary
Project Idea Provision of high-quality and high-speed Internet access by the
use of wireless communicationsWi-Fi to the gadgets withWi-Fi
adapter anywhere in the city
Location Chistopolsky district, the Republic ofTatarstan
Total Project Budget $0.24 mln
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
IT & telecommunications
I 6 0 7
69. Agriculture&Foodprocessing
67
The complex on deep processing
of wheat with an output of 700 tons per day
in the Republic ofTatarstan, Arsk district
ProjectTitle
Deep wheat processing complex with the production capacity
of 700 tons per day in the Republic ofTatarstan, Arsk district
Project summary
Project Idea Lots of efforts and resources are given on growing crops in
Tatarstan as well as in Russia. However, wheat processing is still
not effective. Up to 20% of the harvest disappears.The surplus
of wheat is on average 1.3 million tons per year. Advanced
wheat processing is required, since it would allow gaining higher
added value of the products, which is necessary for the import-
substituting production sectors.
The raw material for high-tech production is class-4 wheat.
There are all conditions for establishment of advanced wheat
processing in the Republic ofTatarstan.
Location Arsk, the Republic ofTatarstan
Estimated Number of Jobs Created 195
Total Project Budget $228.23 mln
Financial and Economic Indicators
Discounted Payback Period (years) 6.5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Agriculture & Food processing
A 7 0 1
70. Agriculture&Foodprocessing
68
Plant for deep
wheat processing
ProjectTitle Plant for deep wheat processing
Project summary
Project Idea Construction of the plant which consists of two main parts:
• Construction of the port silo, storage capacity of which is 300-
500 thousand tons per year.
• Construction of production site with production capacity of
400 thousand tons of wheat per year.
The project provides wheat processing into the following
products:
At the first stage of the Project:
• Bran
• gluten
• the native starch
• glucose-fructose syrup
The second stage is the production of products with higher added
value: citric, lactic, succinic, itaconic acid
Location Near Sviazhsk, the Republic ofTatarstan
Estimated Number of Jobs Created 97
Total Project Budget $3.6 mln
Funds Requested $2.1 mln
Financial and Economic Indicators
NPV $1.14 mln
IRR % 37
Discount Rate % 15
Discounted Payback Period (years) 4.7
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Agriculture & Food processing
A 7 0 2
71. Agriculture&Foodprocessing
69
Construction of agricultural
grain processing mega-farm
ProjectTitle Construction of agricultural grain processing mega-farm
Project summary
Project Idea The project involves construction of agricultural grain processing
mega-farm and exploiting a range of products and possibilities,
which mega-farm provides:
– grain elevator complex with total capacity of 33,070 m3.
(28,000 tons of grain);
– flour and cereal processing,
– feed milling plant,
– extraction of vegetable oil.
Location Buinsky District, the Republic ofTatarstan
Estimated Number of Jobs Created 20
Total Project Budget $10.9 mln
Funds Requested $7.6 mln
Financial and Economic Indicators
NPV $3.5 mln
IRR % 30.2
Discount Rate % 20.0
Discounted Payback Period (years) 6.23
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Agriculture & Food processing
A 7 0 3
72. Agriculture&Foodprocessing
70
Establishment of a livestock complex
on sheep and goat breeding
ProjectTitle
Establishment of a livestock complex
on sheep and goat breeding
Project summary
Project Idea The main goal of this project is to establish a farm on goat
milk and meat production.There are two main targets that are
expected to be achieved:
– Reconstruction of cattle-breeding complex for 500 goats next
to the village of Shushary,Vysokogorsky district;
–The purchase of goats, new equipment for high-quality animal
husbandry, which allows obtaining large production output of
milk, meat and wool.
Location Vysokogorskiy region, the Republic ofTatarstan
Estimated Number of Jobs Created 19
Total Project Budget $1.2 mln
Funds Requested $1.1 mln
Financial and Economic Indicators
NPV $3.4 mln
IRR % 72.02
Discount Rate % 15.00
Discounted Payback Period (years) 3.42
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Agriculture & Food processing
A 7 0 4
73. Agriculture&Foodprocessing
71
Agricultural industrial park
«Zakamsky region»
ProjectTitle Agricultural industrial park «Zakamsky region»
Project summary
Project Idea Construction of agricultural industrial park will solve the problem
of agricultural products storage, processing and distribution.
Moreover, it will help to avoid intermediaries’ participation
in production distribution, which will allow general price
stabilization.
Location Tukavsky district, the Republic ofTatarstan
Estimated Number of Jobs Created 850
Total Project Budget $86.77 mln
Funds Requested $61.06 mln
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Agriculture & Food processing
A 7 0 5
74. Agriculture&Foodprocessing
72
Establishment of sturgeon fishery
with the use of closed system
Agriculture & Food processing
A 7 0 6
ProjectTitle
Establishment of sturgeon fishery
with the use of closed system
Project summary
Project Idea Project involves establishment of contemporary plant on
intensive fish breeding for further sale. Reverse water supply
technology is used to achieve high production growth rate
Location Bavly, the Republic ofTatarstan
Estimated Number of Jobs Created 9
Total Project Budget $0.16 mln
Funds Requested $0.13 mln
Financial and Economic Indicators
NPV $0.07 mln
IRR % 33.3
Discount Rate % 14.0
Discounted Payback Period (years) 4
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
75. Agriculture&Foodprocessing
73
Increase in sugar beet productivity
capacity to 6 000 tons per day
Agriculture & Food processing
A 7 0 7
ProjectTitle
Increase in sugar beet productivity
capacity to 6 000 tons per day
Project summary
Project Idea Expansion of sugar beet processing factory to reduce costs and
whereby increase earning power
Location Buinsky District, the Republic ofTatarstan
Estimated Number of Jobs Created 680
Total Project Budget $54.70 mln
Funds Requested $38.62 mln
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
76. Agriculture&Foodprocessing
74
Establishment of commercial dairy farm
Agriculture & Food processing
A 7 0 8
ProjectTitle Establishment of commercial dairy farm
Project summary
Project Idea The project involves establishment of commercial dairy farm with
complete breeding and production cycle
Location Nizhnekamsky region, the Republic ofTatarstan
Estimated Number of Jobs Created 40
Total Project Budget $16.39 mln
Financial and Economic Indicators
NPV $6.60 mln
IRR % 22.74
Discount Rate % 15.00
Discounted Payback Period (years) 18
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
77. Agriculture&Foodprocessing
75
Establishment of a meat and dairy production
Agriculture & Food processing
A 7 0 9
ProjectTitle Establishment of a meat and dairy production
Project summary
Project Idea Construction and start-up of a dairy farm with 400 heads of cattle
Location Drozhzhanovsky district, the Republic ofTatarstan
Estimated Number of Jobs Created 25
Total Project Budget $2.0 mln
Funds Requested $1.9 mln
Financial and Economic Indicators
Discount Rate % 30
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
78. Agriculture&Foodprocessing
76
ProjectTitle Creation of agro-industrial park
Project summary
Project Idea Construction and launch of a modern complex, which includes
following: store space, sanitary-veterinary expertise laboratory,
lines for milk and meat processing, vegetable canning line,
warehouse, bakery, pastry and pasta production line
Location Drozhzhanovsky district, the Republic ofTatarstan
Estimated Number of Jobs Created 80
Total Project Budget $3.62 mln
Funds Requested $2.07 mln
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Creation of agro-industrial park
Agriculture & Food processing
A 7 1 0
79. Agriculture&Foodprocessing
77
Establishment of a meat and dairy production
ProjectTitle Reconstruction and modernization of a dairy products factory
Project summary
Project Idea Increasing output of current factory SPPK «Drozhzhanovsky
dairy factory» up to 60 tons of dairy products with it following
realization
Location Drozhzhanovsky district, the Republic ofTatarstan
Total Project Budget $5 mln
Funds Requested $3.5 mln
Financial and Economic Indicators
Discount Rate % 30
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Agriculture & Food processing
A 7 1 1
80. Agriculture&Foodprocessing
78
Reconstruction and launch
of a meat processing company
Agriculture & Food processing
A 7 1 2
ProjectTitle Reconstruction and launch of a meat processing company
Project summary
Project Idea Modernization of existing manufacturing process of meat
production, purchase of modern lines for sausage and ready to
cook products
Location Drozhzhanovsky district, the Republic ofTatarstan
Estimated Number of Jobs Created 20
Total Project Budget $1.83 mln
Funds Requested $1.28 mln
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
81. Agriculture&Foodprocessing
79
New chocolate factory
ProjectTitle New chocolate factory
Project summary
Project Idea The chocolate candies segment has the largest market share
in terms of the volume – around 45% from the whole sweets
market in Russia. Import covers significant part of Russia’s
sweets consumption, and its ousting would give sizable potential
to domestic producers in increasing production. Privolzhsky
Federal Region production of chocolate candies doesn’t cover
its internal consumption of the region, the lack of production is
about 18 000 tons per year. New high quality products made in
Tatarstan on the basis of existing Bakery-Confectionery Factory
with local brand will increase the Republic prestige inVolga
Region and the whole of Russia.
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 200
Total Project Budget $56.25 mln
Financial and Economic Indicators
NPV $9.375 mln
IRR % 15 (with load of capacity on a 50% level)
Discount Rate % 12
Discounted Payback Period (years) 4-7
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Agriculture & Food processing
A 7 1 3
82. Agriculture&Foodprocessing
80
Establishment
of potato processing manufacture
ProjectTitle Establishment of potato processing manufacture
Project summary
Project Idea The project involves establishment of potato processing
manufacture, which will produce potato chips and French fries
Location Kukmorsky District, the Republic ofTatarstan
Estimated Number of Jobs Created 87
Total Project Budget $19.91 mln
Funds Requested $13.65 mln
Financial and Economic Indicators
NPV $0.54 mln
Discounted Payback Period (years) 9.8
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Agriculture & Food processing
A 7 1 4
83. Agriculture&Foodprocessing
81
Reconstruction of «Pervomaisky distillery» in the
processing of agricultural products
ProjectTitle Reconstruction of ‘Pervomaisky distillery’ in the processing of
agricultural products
Project summary
Project Idea Creating a complex on agricultural products processing based on
the acquired company. Malt, molasses, animal feed and drinking
water is planned to be produced after the reconstruction.
Location Almetyevsk district, the Republic ofTatarstan
Total Project Budget $2.7 mln
Financial and Economic Indicators
IRR % 35.32
Discount Rate % 15.00
Discounted Payback Period (years) 1.8
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Agriculture & Food processing
A 7 1 5
84. Agriculture&Foodprocessing
82
Production of carrot juice of direct extraction «BiO+»
ProjectTitle Production of direct extraction carrot juice «BiO+»
Project summary
Project Idea The project involves production of the environment-friendly
product – carrot juice of direct extraction «BiO +».
Location Sarmanovsky region, the Republic ofTatarstan
Estimated Number of Jobs Created 63
Total Project Budget $7.1 mln
Funds Requested $4.9 mln
Financial and Economic Indicators
NPV $1.8 mln
IRR % 29.5
Discount Rate % 20
Discounted Payback Period (years) 5.33
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Agriculture & Food processing
A 7 1 6
85. Agriculture&Foodprocessing
83
«Chistopol» Poultry Plant development
ProjectTitle «Chistopol» Poultry Plant development
Project summary
Project Idea Expansion of the production facilities by the means of
reconstruction and re-equipment of the current void sites.
As the result, poultry production capacity will be three times as
much as it has been before the development and production will
reach the capacity of 115 mln eggs per year.
Location Kargali, Chistopol region, the Republic ofTatarstan
Estimated Number of Jobs Created 116
Total Project Budget $15.85 mln
Funds Requested $11.20 mln
Financial and Economic Indicators
NPV $3.8 mln
IRR % 15.76
Discount Rate % 10.00
Discounted Payback Period (years) 8.5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Agriculture & Food processing
A 7 1 7
86. Agriculture&Foodprocessing
84
New ‘Dessert-Boutique’ shops opening
Agriculture & Food processing
A 7 1 8
ProjectTitle New ‘Dessert-Boutique’ shops opening
Project summary
Project Idea Products are cakes, packed desserts, chocolate candies
and figures made of chocolate, which are made of natural
components only.There are currently five working shops in the
Republic ofTatarstan, six more shops are planned to be opened in
the Republic and other regions of Russia.
Location Naberezhniye Chelny, the Republic ofTatarstan
Estimated Number of Jobs Created 20
Total Project Budget $2395.55 mln
Funds Requested $754.41mln
Financial and Economic Indicators
NPV $433.87mln
IRR % 42.7%
Discount Rate % 18.0%
Discounted Payback Period (years) 3.74
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
88. Serviceindustry&tourism
86
Hostel
ProjectTitle Hostel
Project summary
Project Idea Hostel provides budget oriented, sociable accommodation
where guests can rent a bed usually a bunk bed and share a
bathroom, lounge and kitchen. Hostels are very popular among
young travelers, foreign tourists and other people who prefer to
stay in the downtown of the city and pay less money.This type
of accommodation always is going to be in demand, especially
during Kazan Universiade 2013,World Cup 2018 and others.
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 24
Total Project Budget $3.95 mln
Funds Requested $3.63 mln
Financial and Economic Indicators
NPV $4.05 mln
IRR % 19
Discount Rate % 9
Discounted Payback Period (years) 6.5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Service industry & tourism
S 8 0 1
89. Serviceindustry&tourism
87
Tourist and recreational cluster «Kama Pearl»
ProjectTitle Tourist and recreational cluster ‘Kama Pearl’
Project summary
Project Idea The project aims to construct a complex of tourism and
recreation buildings.TRC ‘Kama Pearl’ is located next to
M-7 federal highway, along the river. Kama river, which
contributes to recreation and boating development, including
sailing, hiking, wakeboarding, as well as water sports: water
skiing, surfing and windsurfing. Environment, flora and fauna, as
well as the presence of archaeological and historical sites allows
to develop a hunting and fishing tourism, ecological and cultural
tourism.
Location Ribno-Slobodskoi District, the Republic ofTatarstan
Estimated Number of Jobs Created 452
Total Project Budget $0.42 mln
Financial and Economic Indicators
NPV $0.56 mln
Discount Rate % 7.5
Payback Period (years) 7
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Service industry & tourism
S 8 0 2
90. Serviceindustry&tourism
88
Agro-touristic complex «Kama Compound»
ProjectTitle Agro-touristic complex ‘Kama Compound’.
Project summary
Project Idea Project involves construction of the agro-touristic and recreation
complex.
Location Kama-Ustinsky district, the Republic ofTatarstan
Estimated Number of Jobs Created 26
Total Project Budget $1.50 mln
Funds Requested $1.46 mln
Financial and Economic Indicators
NPV $0.83 mln
IRR % 39
Discount Rate % 18
Discounted Payback Period (years) 3.2
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Service industry & tourism
S 8 0 3
91. Serviceindustry&tourism
89
Developing of «Ostrich Paradise» recreation centre
ProjectTitle Developing of ‘Ostrich Paradise’ recreation centre
Project summary
Project Idea Project involves the development of a modern efficient facility
in the livestock sphere and the establishment of tourist related
infrastructure.
Location Pestrechinsky District, the Republic ofTatarstan
Estimated Number of Jobs Created 25
Total Project Budget $1.97 mln
Financial and Economic Indicators
NPV $1.12 mln
IRR % 29.93
Discount Rate % 15.00
Discounted Payback Period (years) 5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Service industry & tourism
S 8 0 4
92. Serviceindustry&tourism
90
Tourist-recreational park in ‘Kamskie Polyany’
ProjectTitle Tourist-recreational park in ‘Kamskie Polyany’
Project summary
Project Idea The aim of the project is to create a low-cost recreation and
touristic complex with festival and event platform
Location Kamskie Polyany, Nizhnekamsk, the Republic ofTatarstan
Total Project Budget $16.6 mln
Funds Requested $8.3 mln
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Service industry & tourism
S 8 0 5
93. Serviceindustry&tourism
91
‘Emerald Coast’ tourist and recreation complex
Service industry & tourism
S 8 0 6
ProjectTitle ‘Emerald Coast’ tourist and recreation complex
Project summary
Project Idea Touristic and recreation possibilities development, stimulation
of small and medium-sized business development in different
spheres of tourist and health-improving services.
Realization of the ‘Elabuga Banks’ project is supposed to create
touristic, recreation and health-improving infrastructural objects
in the territory of Kama andToyma rivers strand of 250 hectares
Location Elabuga, the Republic ofTatarstan
Estimated Number of Jobs Created 1035
Total Project Budget $116.52 mln
Funds Requested $61.00 mln
Financial and Economic Indicators
NPV $27.78 mln
IRR % 8
Discount Rate % 8
Discounted Payback Period (years) 9.1
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
94. Serviceindustry&tourism
92
Event playground of tourist
recreational park ‘Kamskiye Polyany’
Service industry & tourism
S 8 0 7
ProjectTitle
Event playground of tourist
recreational park ‘Kamskiye Polyany’
Project summary
Project Idea The project involves establishment of active recreation objects
and economy class tourism
Location Nizhnekamsky district, the Republic ofTatarstan
Total Project Budget $16.17 mln
Funds Requested $8.08 mln
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
95. Serviceindustry&tourism
93
Suburban settlement
‘Pyatidvor’ye’
Service industry & tourism
S 8 0 8
ProjectTitle Suburban settlement ‘Pyatidvor’ye’
Project summary
Project Idea Project involves construction of the Suburban settlement
‘Pyatidvor’ye’ which is located atVolga river’s high coast.
Conditions are perfect for having a rest with the whole family
during the whole year.The main advantage of the village is that it
gathers both developed infrastructure and beauty of the nature.
Location Kazan, the Republic ofTatarstan
Total Project Budget $19.65 mln
Funds Requested $2.17 mln
Financial and Economic Indicators
NPV $3.93 mln
IRR % 43
Discount Rate % 13
Discounted Payback Period (years) 2.43
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
96.
97. Halalindustry
95
Halal ice cream production and distribution
ProjectTitle Halal ice cream production and distribution
Project summary
Project Idea Purchasing machines for production of soft ice cream and its
maintenance. Production of ice cream for restaurants, cafes and
shops.
Location Kazan, the Republic ofTatarstan
Total Project Budget $0.25 mln
Funds Requested $0.12 mln
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Halal industry
H 9 0 1
98. Halalindustry
96
ProjectTitle Establishment of Hajj Fund in the Republic ofTatarstan
Project summary
Project Idea Hajj Fund is an investment saving fund, based on Islam finance
principles. It will provide opportunity to deposit money,
particularly to save to perform Hajj in Mecca in more systematic
manner.
Location Kazan, the Republic ofTatarstan
Total Project Budget $10 mln
Funds Requested Subject to agreement
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Establishment of Hajj Fund
in the Republic ofTatarstan
Halal industry
H 9 0 2
99. Halalindustry
97
‘Usmaniya-dom’ hostel
ProjectTitle ‘Usmaniya-dom’ hostel
Project summary
Project Idea ‘Usmaniya-dom’ hostel with Halal services and conditions
provided to pray
Location Kazan, the Republic ofTatarstan
Total Project Budget $2.25 mln
Project Initiator Muslim Religious Board (MRB) of the Republic ofTatarstan
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Halal industry
H 9 0 3
100. Halalindustry
98
Residential compound ‘Berdyamlek’
Halal industry
H 9 0 4
ProjectTitle Residential compound ‘Berdyamlek’
Project summary
Project Idea Construction of mosque for 200 people and accommodation
units at Dubravnaya str.
Location Kazan, the Republic ofTatarstan
Total Project Budget $12.70 mln
Project Initiator Muslim Religious Board (MRB) of the Republic ofTatarstan
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
101. Halalindustry
99
Islamic community center
and business incubator ‘Giylem’
Halal industry
H 9 0 5
ProjectTitle Islamic community center and business incubator ‘Giylem’
Project summary
Project Idea Construction of Islamic community center and business incubator
‘Giylem’ connected to non-state educational institution ‘Russian
Islamic University’. Business incubator is supposed to provide
conditions to Muslim businessmen to work according to the
Islamic principles and traditions
Location Kazan, the Republic ofTatarstan
Total Project Budget $3.86 mln
Project Initiator Muslim Religious Board (MRB) of the Republic ofTatarstan
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
102. Halalindustry
100
ProjectTitle
Establishment of complex ‘Gamyal’
on Halal meat products production
Project summary
Project Idea Establishment of complex ‘Gamyal’ on Halal meat products
production and sale
Location Kazan, the Republic ofTatarstan
Total Project Budget $10.29 mln
Project Initiator Muslim Religious Board (MRB) of the Republic ofTatarstan
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Establishment of complex ‘Gamyal’
on Halal meat products production
Halal industry
H 9 0 6
103. Halalindustry
101
Commercial center
‘Gailya’
ProjectTitle Commercial center ‘Gailya’
Project summary
Project Idea Construction of ‘Gailya’ mosque for 300 people and commercial
center (business center, hotel, restaurant)
Location Kazan, the Republic ofTatarstan
Total Project Budget $2.89 mln
Project Initiator Muslim Religious Board (MRB) of the Republic ofTatarstan
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Halal industry
H 9 0 7
104. Halalindustry
102
ProjectTitle Construction of department store ‘Halal’
Project summary
Project Idea Construction of department store ‘Halal’ at Musina Str. for the
sale of Halal products
Location Kazan, the Republic ofTatarstan
Total Project Budget $0.64 mln
Project Initiator Muslim Religious Board (MRB) of the Republic ofTatarstan
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-mail: tida@tatar.ru
Construction of department store ‘Halal’
Halal industry
H 9 0 8
106. Others
104
Modernization of washing
and steaming station Urussu
ProjectTitle Modernization of washing and steaming station Urussu
Project summary
Project Idea Washing complex is a complex of structures and devices for
cleaning railway cisterns from the residues of petroleum products
and for preparations for filling by different liquid products.
The technology is based on the usage of the advanced methods
and environmentally friendly detergents. All processes are
automated.Tank washing is manufactured in a closed circuit.
The project capacity is 50 tanks per day.
Location Urussu, the Republic ofTatarstan
Total Project Budget $3.0 mln
Funds Requested $0.9 mln
Financial and Economic Indicators
NPV $0.7 mln
IRR % 30
Discount Rate % 15
Discounted Payback Period (years) 3.3
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 0 1
107. Others
105
Extension of metallized paper manufacturing
ProjectTitle Extension of metallized paper manufacturing
Project summary
Project Idea Creation of the new direction of metallized self-adhesive paper
production (5 000 tons per year), metallized parafinned paper on
the base of silicone component (4 000 tons per year)
Location Tyulyachi village, the Republic ofTatarstan
Estimated Number of Jobs Created 62
Total Project Budget $134 mln
Funds Requested $100 mln
Financial and Economic Indicators
NPV $11.3 mln
IRR % 12.03
Discount Rate % 9.00
Discounted Payback Period (years) 8.5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 0 2
108. Others
106
Manufacturing of LED luminaires
for outdoor and indoor lighting
ProjectTitle Manufacturing of LED luminaires
for outdoor and indoor lighting
Project summary
Project Idea This project involves the use of electronic ballasts devices (ECG)
instead of common electromagnetic devices for exterior lighting
(mostly, for the road lighting)
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 170
Total Project Budget $6.0 mln
Funds Requested $4.9 mln
Financial and Economic Indicators
NPV $8.7 mln
IRR % 11
Discount Rate % 20
Discounted Payback Period (years) 7.7
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 0 3
109. Others
107
The development of competitive refrigeration
equipment POZIS based on energy-efficient,
environmentally safe technology with the
implementation of isobutene and cyclopentene
ProjectTitle
The development of competitive refrigeration equipment
POZIS based on energy-efficient, environmentally safe
technology with the implementation of isobutene and
cyclopentene
Project summary
Project Idea Project involves the reconstruction of refrigeration equipment
for the introduction of innovative technology to produce
qualitatively new refrigeration equipment according to the
international standards ISO, using environmentally friendly
components (isobutane and cyclopentane)
Location Zelenodolsk, the Republic ofTatarstan
Estimated Number of Jobs Created 265
Total Project Budget $27.5 mln
Funds Requested $26.7 mln
Financial and Economic Indicators
Discount Rate % 8.25
Discounted Payback Period (years) 11
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 0 4
110. Others
108
Creation ofTextile Plant
(furniture textile)
ProjectTitle Creation ofTextile Plant (furniture textile)
Project summary
Project Idea Project involves furniture textile production. Agreements on
furniture textile purchase intentions are signed.The aim of the
project is an import substitution.
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 20
Total Project Budget $2.13 mln
Funds Requested $1.90 mln
Financial and Economic Indicators
NPV $2.5 mln
Discounted Payback Period (years) 1.7
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 0 5
111. Others
109
Ecological Park
of the Republic ofTatarstan
ProjectTitle Ecological Park of the Republic ofTatarstan
Project summary
Project Idea
Ecopark Project is a cluster of interrelated plants working in the
sphere of household and industrial waste recycling based on
modern innovative technology and manufactures producing
products from the recycled materials.
Location Pestrechinsk municipal district, the Republic ofTatarstan
Estimated Number of Jobs Created 115
Total Project Budget $37.15 mln
Financial and Economic Indicators
Discount Rate % 12
Discounted Payback Period (years) 5.5
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 0 6
112. Others
110
Modular industrial recycling park
on disposing 3,000 trucks per year
ProjectTitle Modular industrial recycling park
on disposing 3,000 trucks per year
Project summary
Project Idea Modern high-tech Industrial Park on recycling trucks including
the modules: processing of waste tires, processing of wiring,
processing black and colored scrap metal, processing and
recycling waste oil, gas generation. According to the agency
‘Autostat’, there are 5.3 million trucks in Russia, more than 60%
are older than 10 years and can be recycled.
Location Naberezhnye Chelny, the Republic ofTatarstan
Estimated Number of Jobs Created 198
Total Project Budget $16.06 mln
Funds Requested $9.20 mln
Financial and Economic Indicators
NPV $15.3 mln
IRR % 52
Discount Rate % 12
Discounted Payback Period (years) 3.3
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 0 7
113. Others
111
Manufacturing air ducts
by the SPIRO's technology
ProjectTitle Manufacturing air ducts by the SPIRO's technology
Project summary
Project Idea Project involves manufacturing air ducts by the SPIRO's
technology. SPIRO also provides full range of services, which
are production designing (planning), manufacturing processes
adjusting
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 75
Total Project Budget $1.6 mln
Funds Requested $1.1 mln
Financial and Economic Indicators
NPV $2.4 mln
IRR % 46
Discount Rate % 20
Discounted Payback Period (years) 3
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 0 8
114. Others
112
Reconstruction of the main
water drainage system
ProjectTitle Reconstruction of the main water drainage system
Project summary
Project Idea Project involves the reconstruction and modernization of the
main water drainage system which will improve the quality of the
water and reduce the network losses
Location Almetyevsk-Minnibaevo, the Republic ofTatarstan
Total Project Budget $3.3 mln
Funds Requested $2.1 mln
Financial and Economic Indicators
Discounted Payback Period (years) 20
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 0 9
115. Others
113
Establishment
of alveolated cardboard pallet manufacture
ProjectTitle Establishment of alveolated cardboard pallet manufacture
Project summary
Project Idea The project involves design and construction of cardboard pallet
manufacture plant based on Finnish technology in the Republic of
Tatarstan. Production is to be carried by the modern equipment,
productive capacity of which is 3 million pallets per year.
Location Kazan, the Republic ofTatarstan
Estimated Number of Jobs Created 50
Total Project Budget $12.55 mln
Financial and Economic Indicators
NPV $1.63 mln
IRR % 24.1
Discounted Payback Period (years) 5.79
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 1 0
116. Others
114
Initiation of nylon fibers-6.6 production
with the productive capacity of 2 400 tn per year
of nylon fibers and 10 mln high quality tights
ProjectTitle Initiation of nylon fibers-6.6 production with the productive
capacity of 2 400 tons nylon fibers and 10 mln high quality
tights per year
Project summary
Project Idea Initiation of contemporary joint production unit based on existing
enterprise, producing nylon fibers-6.6 and high quality tights out
of them
Location Elabuga, the Republic ofTatarstan
Estimated Number of Jobs Created 300
Total Project Budget $107.67 mln
Financial and Economic Indicators
NPV $71.04 mln
IRR % 43.2
Discount Rate % 20.0
Discounted Payback Period (years) 5.05
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 1 1
117. Others
115
Improving of the heating supply efficiency,
Zelenodolsk
ProjectTitle Improving of the heating supply efficiency, Zelenodolsk
Project summary
Project Idea Project involves improvement of the heating supply efficiency in
Zelenodolsk. Partners’ share is going to be up to 70 percent.
Location Zelenodolsk, the Republic ofTatarstan
Total Project Budget $41.5 mln
Financial and Economic Indicators
Discount Rate % 10
Discounted Payback Period (years) 9.4
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 1 2
118. Others
116
Construction
of the miniThermal Power Plant
ProjectTitle Construction of the miniThermal Power Plant
Project summary
Project Idea Project involves construction of the miniThermal Power Plant for
existing company ‘POZIS’ OJSC (expected partners’ share is up to
80 percent)
Location Kazan, the Republic ofTatarstan
Total Project Budget $18.1 mln
Financial and Economic Indicators
Discount Rate % 10
Discounted Payback Period (years) 6.76
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 1 3
119. Others
117
Construction of the tram line
in Naberezhnye Chelny
ProjectTitle Construction of the tram line in Naberezhnye Chelny
Project summary
Project Idea The project involves the tram line construction on the main
street with high passenger flow.The project will help to relieve
highway speed traffic flow, reduce waiting time and improve the
environment.
Location Naberezhnye Chelny, the Republic ofTatarstan
Estimated Number of Jobs Created 80
Total Project Budget $17.1 mln
Financial and Economic Indicators
NPV $5.9 mln
IRR % 20
Discount Rate % 10
Discounted Payback Period (years) 12
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 1 4
120. Others
118
Manufacture and distribution
of footwear cleaning device
ProjectTitle Manufacture and distribution of footwear cleaning device
Project summary
Project Idea Producer offers the range of footwear cleaning and disinfection
devices as well as the set of expendable materials for the
maintenance of technical availability of the devices.
Location The Republic ofTatarstan
Estimated Number of Jobs Created 108
Total Project Budget $0.68 mln
Financial and Economic Indicators
NPV $0.14 mln
Discounted Payback Period (years) 2
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 1 5
121. Others
119
Complete modernization of the existing
genuine leather production enterprise
ProjectTitle Complete modernization of the existing
genuine leather production enterprise
Project summary
Project Idea The project involves establishment of high technology tannery
on genuine leather production based on existing enterprise. High
frequency plasmatic installation adapted to the manufacture
conditions is supposed to be implemented.
Location Sabinsky District, the Republic ofTatarstan
Estimated Number of Jobs Created 175
Total Project Budget $14.67 mln
Funds Requested $10.27 mln
Financial and Economic Indicators
NPV $17.45 mln
IRR % 39.63
Discount Rate % 0-20
Discounted Payback Period (years) 3.4
Contacts
Tatarstan Investment Development Agency,
Tel.: +7 (843) 570 40 01, +7 917 227 69 92
(Guzel Mullayarova, Idelya Nizamova)
420107, 50 Peterburgskaya St, Kazan
E-Mail: tida@tatar.ru
Others
O 1 3 1 6