TIDA - Automobile Industry (short)

374 views
287 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
374
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
8
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

TIDA - Automobile Industry (short)

  1. 1. Investment sites for machinery & automotive parts production
  2. 2. invest.tatarstan.ru Tatarstan-world class investment infrastructure  
  3. 3. invest.tatarstan.ru MASTER Ready industrial premises  
  4. 4. invest.tatarstan.ru Kama Industrial Park «Master» Year of establishment :July 29th,2004 Authorized capital: $ 20 mln. USD Government investments: $ 83 mln. USD Number of residents: 210 +
  5. 5. invest.tatarstan.ru What KIP «Master» can offer ü     Leasing  Produc/on  and  Offices  Premises   ü     Customs  Post  for  Customs  Clearance  Department  and  Customs  Control   ü     Temporary  Storage  Warehouse   ü     Logis;c  Terminal  Services   ü     Security  Services              and  more......    
  6. 6. invest.tatarstan.ru KIP Master owned premises: Total production area – 334 266 m2 - to be refurbished by the end of 2013 –101 603m2 Total office area – 50 326 m2 Under asset management from the Government of the Republic of Tatarstan: Total production area - 136 835 m2 Total office area – 27 499 m2        
  7. 7. invest.tatarstan.ru What KIP «Master» can offer Rental prices: production area – $ 2.96./m2, VAT included     office premises – $ 4.7./m2, VAT included    
  8. 8. invest.tatarstan.ru How to become a resident It  is  easy  ........   Submit constituent documents for your company Fill in the application form and partner card form  Send the documents an enclosed letter addressing KIP ‘Master’
  9. 9. invest.tatarstan.ru KIP «Master» residents
  10. 10. invest.tatarstan.ru Industrial Park «Chistopol»
  11. 11. invest.tatarstan.ru Chistopol – trading hub on Kama River •  Founded in 1781 by decree of Empress Catherine The Great •  Quickly became leading cultural and trading hub of region on Kama River (grain export) •  In 1897– 20,104 population •  2nd largest city in region •  Vostok Watch Makers (est. 1942) •  Factory moved away from front during war •  4.5 million timepieces annually (1980)
  12. 12. invest.tatarstan.ru Chistopol today Geography 189,300 hectares of land (municipality) Centrally located amongst largest cities of Tatarstan (144 km to Kazan) Lies on Europe-Western China International Transit Corridor Population 60,700 in City of Chistopol 80,100 in Chistopol municipality GRP per capita 140,500 RUB (2011) Average monthly salary 17,341 RUB in large companies 11,193 RUB municipal average Chistopol development plan until 2020 297,300 GRP per capita
  13. 13. invest.tatarstan.ru Chistopol Industrial Park Established in 2010 to diversify & revitalize municipal economy •  292 hectares •  35 plots of 1-3 hectare size, other land free form •  18.7 mln USD invested in infrastructure •  Rent payment waived for up to 7 years •  Range of tax preferences* •  Corporate tax 20% 15.5% •  Property tax 2.2% 0.1% •  Free hookup to infrastructure •  Electricity: 45 MW gas boiler on site •  Water: 575 m3/hr, 22.04 RUB/ m3 •  Gas: 30,000 m3/hr * Tax preferences extend for 14 years for machinery production, for 7 years for other production
  14. 14. invest.tatarstan.ru Residents of Industrial Park Chistopol 4 current residents •  Delrus •  medical supplies production •  700 mln RUB •  150 jobs •  SKD Invest •  Building materials production •  681 mln RUB •  200 jobs •  Kamsky Polygraphic Kombinat •  Packaging and polygraph products •  8.7 bln RUB •  450 jobs •  Turan Chistopol Brick Factory •  Brick production •  2.3 bln RUB investment •  289 jobs
  15. 15. invest.tatarstan.ru
  16. 16. invest.tatarstan.ru
  17. 17. invest.tatarstan.ru
  18. 18. invest.tatarstan.ru Gross area- 39,5 ha Area under construction- 31,5 ha Land plots for industrial use – from 0.3 to 10 ha Engineering and road infrastructure – 5,3 ha Landscaping area – 1,2 ha MASTER PLAN
  19. 19. invest.tatarstan.ru Industrial park specialization Polymers processing Machinery Metal- working Construction materials production
  20. 20. invest.tatarstan.ru Engineering infrastructure Electricity 10 mW Heating 32,27 GCal/h Gas 10 mln м3/ year M7 Highway 300 m away Railways Khimicheskaya station (3,5 km) Vosstanya station (8,7 кm) PRODUCTION Water supply 2 wells (1000м3/h)
  21. 21. invest.tatarstan.ru What M7 can offer Turnkey solution Produc/on  facility  –  1500  m2   From  $951/m2   From  $450/m2   From  $870/m2   Standard projects Warehouse–  1000  m2   Offices–  250  m2  
  22. 22. invest.tatarstan.ru Management Consul;ng   Infrastructure   maintenance   IT  outsourcing   Security  service   Trainings   Financial  and   technological   brokerage  
  23. 23. invest.tatarstan.ru M7 residents Terrace boards production Equipment for butt-steam welding of polyethylene pipes Production of disposal package Production of polyethylene pipes
  24. 24. invest.tatarstan.ru
  25. 25. invest.tatarstan.ru
  26. 26. invest.tatarstan.ru
  27. 27. invest.tatarstan.ru
  28. 28. invest.tatarstan.ru Transport accessibility Distance to Naberezhnye Chelny river port - 18 km. Distance to BEGISHEVO international airport - 54 km. Distance to the nearest city: Park is located on the territory of industrial and utility area of Naberezhbye Chelny Distance to М7 Federal Highway - 1,5 km. Distance to the railway logistic terminal of «Transservice LTD» LLC - 21 km
  29. 29. Engineering infrastructure     Utility and drinking water supply net– up to 300 m3/ hour Residential sewage net – up to 300 m3/hour Process water supply net– up to 300 m3/hour Gas-supply system – 1.26 mln m3/hour Building area 45 000 – 50 000 m2     invest.tatarstan.ru
  30. 30. invest.tatarstan.ru Sectors Wood  processing  and  furniture   production Electronic  parts  manufacturing Construction  materials  production Machinery,  auto  components   production Ventilation  equipment  production 5,9  % 29,  4  % 48  % 11,8    % 5,9  % Industrial park specialization
  31. 31. invest.tatarstan.ru Consul;ng   Infrastructure   maintenance   IT  outsourcing   Security  service   HR     Financial  and   technological   services   Turnkey   solu;on   Logis;cs    
  32. 32. invest.tatarstan.ru Why aren’t you investing in the Republic of Tatarstan?   Contact  us     Tatarstan  Investment  Development  Agency   50  Peterburgskaya  St.   Kazan,  Tatarstan,  Russia  420107   Tel/Fax:  +7  (843)  570-­‐40-­‐01   Email:  invest@tatar.ru   Website:  ;da.tatarstan.ru   TwiZer:  @InvestTatarstan     Tatarstan  Development  Corpora;on   50  Peterburgskaya  St.   Kazan,  Tatarstan,  Russia  420107   Tel/Fax:  +7  (843)  227-­‐42-­‐24   Email:  invest@tatar.ru     Tatarstan  Export  Corpora;on   35/2  Pravo-­‐Bulachnaya  St.   Kazan,  Tatarstan,  Russia  420111   Tel:  +7  (843)  292-­‐87-­‐76   Email:  export@tatar.ru    

×