Deltek Insight 2010: Cobra 5 Rolling Wave Process

  • 245 views
Uploaded on

 

More in: Technology , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
245
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. EPM-219 Cobra 5 Rolling WaveProcessDelivered by:Colleen BedetteMarcy Wolke
  • 2. Agenda• Introduction of Presenters• Define Rolling Wave• Explain All Steps in Planning Rolling Wave including Importance of Change Management – Explain How the Resources Are Updated and Verified – Integration Wizard Eases the Rolling Wave Process• Review the “What ifs” before the Baseline for the Rolling Wave Is Set• Open Discussion on Other Rolling Wave ProcessesCopyright © 2010 Deltek, Inc. 2
  • 3. Rolling Wave Concept• Progressive refinement of detailed work definition accomplished by continually subdividing downstream activities into near-term task• Progressive subdivision of aggregate contract planning into its component parts, i.e., planning packages into work packages• Continual Conversion of Planning Packages to Work Packages ID CWBS Reference Task Name EV Type % Work Actual Start Actual Finish Duration Half 2, 2009 Half 1, 2010 Half 2, 2010 Half 1, 2011 Half 2, 2011 Half 1, 2012 Half 2, 2012 Half 1, 2013 Half 2, 2013 Half 1, 2014 Half 2, 2014 Complete A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J4638 1.34.01.00.00.00.00 FMS Integration Year 5 (CLIN 0034) 0% Thu 10/1/09 NA 136 days4639 1.34.01.00.00.00.00.02G FMS Training MMIL 0% Thu 10/1/09 NA 82 days4640 1.34.01.00.00.00.00.02G Report on Lessons Learned Integrated into 102 Course Step 100% Thu 10/1/09 Fri 10/30/09 22 days4641 1.34.01.00.00.00.00.02G Report on Updates Required to Support Next FMS Cases Step 100% Mon 11/2/09 Wed 11/25/09 18 days4642 1.34.01.00.00.00.00.02G Report on Updates for Next FMS Team Step 100% Mon 12/7/09 Thu 12/31/09 18 days4643 1.34.01.00.00.00.00.02G Report on Updates Required to Support Next FMS Cases Step 0% Mon 1/4/10 NA 19 days4644 1.34.01.00.00.00.00.06G FMS Consulting LOE 62% Thu 10/1/09 NA 124 days4645 1.34.01.00.00.00.00.07G Tech Developers "102" Course Labor MMIL 100% Mon 11/2/09 Mon 11/30/09 19 days4646 1.34.01.00.00.00.00.07G Course Preparation Step 100% Mon 11/2/09 Fri 11/6/09 5 days4647 1.34.01.00.00.00.00.07G Course Conduct Step 100% Mon 11/9/09 Tue 11/17/09 7 days4648 1.34.01.00.00.00.00.07G Course Evaluation Analysis Step 100% Wed 11/18/09 Mon 11/30/09 7 days4649 1.34.01.00.00.00.00.08G FMS Reachback LOE 28% Mon 12/28/09 NA 65 days4650 1.34.01.00.00.00.00.09G FMS Singapore "102" Course Labor MMIL 0% NA NA 57 days4651 1.34.01.00.00.00.00.09G Progress Review #1 Step 0% NA NA 17 days4652 1.34.01.00.00.00.00.09G Progress Review #2 Step 0% NA NA 20 days4653 1.34.01.00.00.00.00.09G Progress Review #3 Step 0% NA NA 8 days4654 1.34.01.00.00.00.00.09G Final Review Step 0% NA NA 12 days4655 1.44.01.00.00.00.00 FMS Integration Year 4 ODC 0% Thu 10/1/09 NA 124 days4656 1.44.01.00.00.00.00.01G FMS ODC Activities RW 9 LOE 62% Thu 10/1/09 NA 124 days4657 1.44.01.00.00.00.00.03G FMS Tech Developers "102" Course ODC LOE 100% Mon 11/2/09 Mon 11/30/09 19 days4658 1.44.01.00.00.00.00.04G FMS ODC 102 Singapore Dev Training LOE 0% NA NA 45 days4659 1.50.01P SEIC GFY2010 0% NA NA 128 days4660 1.50.01P.01P SEIC GFY2010 Planning Package PP 0% NA NA 128 days4661 1.51 SEIC GFY2011 0% NA NA 252 days4662 1.51.01P SEIC GFY2011 Planning Package PP 0% NA NA 252 days4663 1.52 SEIC GFY2012 0% NA NA 251 days4664 1.52.01P SEIC GFY2012 Planning Package PP 0% NA NA 251 days4665 1.53 SEIC GFY2013 0% NA NA 252 days4666 1.53.01P SEIC GFY2013 Planning Package PP 0% NA NA 252 days4667 1.54 SEIC GFY2014 0% NA NA 252 daysCopyright © 2010 Deltek, Inc. 3
  • 4. Rolling Wave Planning Steps1. Planning Kick-off Meeting2. CAMs Create BOE(s)3. Draft Schedule Created from BOE(s)4. Leveling Resources5. Change Request Prepared6. Change Request, BOE(s), and Schedule Submitted to CCB7. Cobra 5 Auxiliary Files Updated8. Approved BOEs Are Processed and Schedule Resource Loaded9. Transactional Files Created10. Cobra 5 Prepared for Rolling Wave Import11. Compare Cobra 5 Totals with BOE(s)12. Artifacts Are CreatedCopyright © 2010 Deltek, Inc. 4
  • 5. Rolling Wave Steps (1- 4)• Rolling Wave Kick-off Meeting – PM Guidance – CAMs with IPT Leads discuss Requirements of Rolling Wave• Pro-Bidder (BOE Tool) – PC ensures Skeleton WBS and correct Recourses in tool – CAMs create BOE(s)• MSProject Scheduling Tool – Draft Schedule Created from BOE(s) – Scheduler prepares Draft Rolling Wave Schedule• Resources Level – BOE(s) exported to excelCopyright © 2010 Deltek, Inc. 5
  • 6. BOE Screen ShotCopyright © 2010 Deltek, Inc. 6
  • 7. Schedule Screen ShotID Unique ID WBS (text1) CAM (text5) OBS (text2) WP ID (text3) % Complete Milestones Activity PMT (text7) Task Name Duration Duration Duration Early Start Late Start Start (test 25) Type Variance (text4) Qtr 1, 2010 Qtr 2, 2010 Qtr 3, 2010535 1611 1.50.01.03.01.01.01 PORTER PE 1.50.01.03.01.01.01.03H 0% WP A Support Component Development RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10550 1621 1.50.01.03.01.02.03 PORTER PE 55% CA System Engineering Arch Support 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09559 1727 1.50.01.03.01.02.03 PORTER PE 1.50.01.03.01.02.03.03H 0% WP B SE Suport Componet Design RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10562 1626 1.50.01.03.01.03.03 PORTER PE 55% CA SPO Platform Management 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09572 1864 1.50.01.03.01.03.03 PORTER PE 1.50.01.03.01.03.03.01H 0% WP B Suport SPO Platform Management RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10573 1628 1.50.01.03.01.03.03 PORTER PE 1.50.01.03.01.03.03.03H 0% WP A Platform Management Process Support RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10574 1629 1.50.01.03.01.04.01 PORTER CE 55% CA System Engineering Management 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09579 1630 1.50.01.03.01.04.01 PORTER CE 1.50.01.03.01.04.01.01H 0% WP A Engineering Management Plan RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10580 1631 1.50.01.03.01.04.01 PORTER CE 1.50.01.03.01.04.01.02H 0% WP A System Engineering Mgmt Spt Activities RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10581 1632 1.50.01.03.01.04.01 PORTER CE 1.50.01.03.01.04.01.04H 0% WP A MPEC II Support RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10582 1633 1.50.01.03.01.04.01 PORTER CE 1.50.01.03.01.04.01.05H 0% WP A IPT Leadership RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10583 1634 1.50.01.03.01.04.02 VANCE ES 55% CA Metrics 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09586 1635 1.50.01.03.01.04.02 VANCE ES 1.50.01.03.01.04.02.01H 0% WP A Perform Enterprise Metrics RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10587 1636 1.50.01.03.01.04.02 VANCE ES 1.50.01.03.01.04.02.02H 0% WP A Perform SEIC Metrics RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10588 1637 1.50.01.03.01.05.01 VANCE ES 55% CA Configuration Management Plans 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09590 1638 1.50.01.03.01.05.01 VANCE ES 1.50.01.03.01.05.01.01H 0% WP A Dev/Maint Configuration Management Plans RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10591 1639 1.50.01.03.01.05.02 VANCE ES 55% CA Configuration Management Execution 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09594 1640 1.50.01.03.01.05.02 VANCE ES 1.50.01.03.01.05.02.01H 0% WP A Execute CM RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10595 1641 1.50.01.03.01.05.02 VANCE ES 1.50.01.03.01.05.02.02H 0% WP A CDRL Delivery and Management RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10596 1642 1.50.01.03.01.06.01 PORTER PE 55% CA System Engineering Security Support 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09598 1643 1.50.01.03.01.06.01 PORTER PE 1.50.01.03.01.06.01.01H 0% WP A Support Security C&A RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10599 1644 1.50.01.03.01.06.02 VANCE RED 55% CA Security Testing 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09614 1747 1.50.01.03.01.06.02 VANCE RED 1.50.01.03.01.06.02.01H 0% WP B Support Security Testing RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10615 1646 1.50.01.03.01.06.03 VANCE ES 55% CA Physical Security 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09618 1647 1.50.01.03.01.06.03 VANCE ES 1.50.01.03.01.06.03.01H 0% WP A Dev/Maint Physical Security P&Ps RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10619 1648 1.50.01.03.01.06.03 VANCE ES 1.50.01.03.01.06.03.02H 0% WP A Execute Physical Security P&Ps RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10622 1651 1.50.01.03.02.01.01 PORTER I&T 55% CA SW Integration Control Account 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09667 1882 1.50.01.03.02.01.01 PORTER I&T 1.50.01.03.02.01.01.01H 0% WP B Dev, Maint & Test Automated Test Scripts RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10668 1881 1.50.01.03.02.01.01 PORTER I&T 1.50.01.03.02.01.01.02H 0% WP A Horizontal Integration Management RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10669 1880 1.50.01.03.02.01.01 PORTER I&T 1.50.01.03.02.01.01.03H 0% WP B Execute Horizontal Integration RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10670 1879 1.50.01.03.02.01.01 PORTER I&T 1.50.01.03.02.01.01.04H 0% WP B Perform Sys Administration RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10671 1656 1.50.01.03.02.01.01 PORTER I&T 1.50.01.03.02.01.01.05H 0% WP A Dev, Maint & Test Installation Products RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10672 1657 1.50.01.03.02.04.01 PORTER I&T 55% CA Build Test, Evaluation and support 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09704 1823 1.50.01.03.02.04.01 PORTER I&T 1.50.01.03.02.04.01.05H 0% WP B JMPS System Int Test RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10705 1661 1.50.01.03.03.02.01 VANCE ES 53% CA Process Improvement 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09714 1889 1.50.01.03.03.02.01 VANCE ES 1.50.01.03.03.02.01.01H 0% WP A Execute SEIC Process Improvement RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10715 1888 1.50.01.03.03.02.01 VANCE ES 1.50.01.03.03.02.01.02H 0% WP A Support Enterprise Process Improvement RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10716 1887 1.50.01.03.03.02.01 VANCE ES 1.50.01.03.03.02.01.03H 0% WP B Conduct Process Training RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10717 1665 1.50.01.03.03.02.01 VANCE ES 1.50.01.03.03.02.01.04H 0% WP A Support Ent Inspections & Appraisals RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10718 1666 1.50.01.03.03.03.02 VANCE ES 55% CA Enterprise Risk Management 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09720 1667 1.50.01.03.03.03.02 VANCE ES 1.50.01.03.03.03.02.01H 0% WP A Manage Enterprise Risk RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10721 1668 1.50.01.03.03.04.01 PORTER PMO 55% CA Provide Program Management 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09729 1669 1.50.01.03.03.04.01 PORTER PMO 1.50.01.03.03.04.01.01H 0% WP A SEIC Program Management Spt Activities 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10730 1670 1.50.01.03.03.04.01 PORTER PMO 1.50.01.03.03.04.01.02H 0% WP A SEIC CAM Performance 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10731 1671 1.50.01.03.03.04.01 PORTER PMO 1.50.01.03.03.04.01.03H 0% WP A Manage Subcontracts 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10732 1672 1.50.01.03.03.04.01 PORTER PMO 1.50.01.03.03.04.01.04H 0% WP A SEIC CM & Manage Project Data 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10733 1673 1.50.01.03.03.04.01 PORTER PMO 1.50.01.03.03.04.01.05H 0% WP A Project Management Review Support 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10734 1675 1.50.01.03.03.04.01 PORTER PMO 1.50.01.03.03.04.01.10H 0% WP A SEIC Award Fee Management 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10735 1676 1.50.01.03.03.04.02 PORTER PMO 55% CA Provide SEIC Program Control 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09737 1677 1.50.01.03.03.04.02 PORTER PMO 1.50.01.03.03.04.02.01H 0% WP A SEIC Project Control Support Activities RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10738 1678 1.50.01.03.03.04.03 VANCE ES 55% CA Quality Assurance 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09740 1679 1.50.01.03.03.04.03 VANCE ES 1.50.01.03.03.04.03.01H 0% WP A Perform SEIC QA RW 10 51 days 0 days 51 days Thu 4/1/10 Fri 8/4/17 Thu 4/1/10741 1680 1.50.01.03.03.04.04 PORTER PMO 55% CA SEIC Material Purchases 177 days 0 days 177 days Thu 10/1/09 Thu 10/1/09 Thu 10/1/09 Copyright © 2010 Deltek, Inc. 7
  • 8. Rolling Wave Steps (5-6)• Change Request Prepared – May be most Important Step – Spells out the Scope/Schedule/Budget• Change Request Submitted to CCB – Members Include PM, DPM, CAMs, CE, DM, and PCCopyright © 2010 Deltek, Inc. 8
  • 9. Rolling Wave Steps (7)• Cobra 5 considerations – WBS additions – Rate updates – Resource updates – Calculation updates – Other Code updatesCopyright © 2010 Deltek, Inc. 9
  • 10. Updating WBS• Export Codes – From Report Wizard select WBS file of interestCopyright © 2010 Deltek, Inc. 10
  • 11. Updating WBS (cont.)• From File menu select Integration > Integration Wizard – Integration Wizard Dialog Boxes appear • Select Ancillary data > Next command button • Select a New Configuration > Next command button • File Selection navigate to the csv WBS updated file > change the What type from Calendar to Codes > Action remains on Update > Cobra file name select the file to be Updated > Next command button • Check the File contains a header row > Next command button • Uncheck save your configuration > Finish command buttonCopyright © 2010 Deltek, Inc. 11
  • 12. Updating WBS (cont.)Copyright © 2010 Deltek, Inc. 12
  • 13. Rolling Wave Steps (7) (cont.)• Do the same steps as updating the WBS for the Rates, Resources, Calculation, and other Codes that may need to be updated• Using Resource by employee name – 22 Character Limitation – Labor intensive if employee structure not stable – Clarity in artifact tracing• Remember to integrate the Resource (RBS Cobra 4) before the Calculation integration – The RBS in Cobra 5 is not a code file like the WBS; it is called a Resource file and it is loaded before you update the calculations of the resources – Ensure that there is a backup and that you have Exported the Calculations file from the Report WizardCopyright © 2010 Deltek, Inc. 13
  • 14. Rolling Wave Steps (8-9)• Transactional Files – Excel csv fileCopyright © 2010 Deltek, Inc. 14
  • 15. Rolling Wave Steps (10)• Cobra 5 Prepared for Rolling Wave Import – Importance of Backups (often) – Integration Wizard• Create new Class – Open Project Information – From the Classes tab • Select the New command buttonCopyright © 2010 Deltek, Inc. 15
  • 16. Rolling Wave Steps (10) (cont.)• Create new Class – Open Project Information – From the Classes tab • Select the New command button • Type in Class Name (no longer the 2 character limitation) • Type in the Description • Leave Type as Budget • Select the Next command ButtonCopyright © 2010 Deltek, Inc. 16
  • 17. Rolling Wave Steps (10) (cont.)• New Class continuation – Class Settings • Level select the level from the dropdown menu • Calendar Set • Rate File • Obtain budget from • Read Only • Include in totals • Next command button – Confirmation • Finish command buttonCopyright © 2010 Deltek, Inc. 17
  • 18. Integration Wizard – Loading RW• Integration WizardCopyright © 2010 Deltek, Inc. 18
  • 19. Integration Wizard – Loading RW• Integration Configuration – New – Where are you loading data from? • Files• Action Selection – Project Data • Control Account and Work Package • Resource AssignmentsCopyright © 2010 Deltek, Inc. 19
  • 20. Integration Wizard – Loading RW• Project Selection – Navigate to the Activity and Resource Assignment Files – Select the Cobra Project of interestCopyright © 2010 Deltek, Inc. 20
  • 21. Integration Wizard – Loading RW• Activity File Field Mapper – WBS – OBS – WP – ID – Description – Baseline Start Date – Baseline Finish Date – EVT – Milestone – Milestone Weight – Budget ClassCopyright © 2010 Deltek, Inc. 21
  • 22. Integration Wizard – Loading RW• Earned Value • Resource Assignment – Load from File – Default Budget Class – Load only these budget classesCopyright © 2010 Deltek, Inc. 22
  • 23. Integration Wizard – Loading RWCopyright © 2010 Deltek, Inc. 23
  • 24. Integration Wizard – Loading RW• Filter – Select Criteria – Select Load only schedule activities that do not exist in CobraCopyright © 2010 Deltek, Inc. 24
  • 25. Integration Wizard – Loading RW• Select Finish command buttonCopyright © 2010 Deltek, Inc. 25
  • 26. Rolling Wave Steps (10)• Compare Cobra 5 Totals with BOE(s) – Review of BOE(s) to Cobra 5 – Review of schedule to Cobra 5 – Set Baseline of Rolling Wave• Artifacts are created – Control Account Plans (CAP) – Responsibility Assignment Matrix (RAM)Copyright © 2010 Deltek, Inc. 26
  • 27. Review of Rolling Wave• Review of BOE(s) to Cobra 5 – Here are a couple of ways to see the Rolling Wave data Cobra 5 • Run the Control Account Planning Report (CAP) • Assignment Export/Import under the Project dropdown menu – Once you have the report or spreadsheet then compare BOEs – Compare the schedule dates to Cobra 5Copyright © 2010 Deltek, Inc. 27
  • 28. Move Rolling Wave• Reviews and all changes are made time to baseline – The Rolling Wave data is moved from its Cost Class to a temporary holding place – Ensure that the holding place is ready and pointed at correct Rate fileCopyright © 2010 Deltek, Inc. 28
  • 29. Move Rolling Wave (cont.)• Reclassification – Select Project of interest – Options – Criteria – Source Class – Target Class – Date Range – ConfirmationCopyright © 2010 Deltek, Inc. 29
  • 30. Options and CriteriaCopyright © 2010 Deltek, Inc. 30
  • 31. Source Class and Target ClassCopyright © 2010 Deltek, Inc. 31
  • 32. Date Range and ConfirmationCopyright © 2010 Deltek, Inc. 32
  • 33. Cost Class• Delete the Cost Class• Add Cost Class back – Include in the TotalsCopyright © 2010 Deltek, Inc. 33
  • 34. Move Planning Package Budget• Using the Assignment Export/Import – Export the Planning Package – Make the adjustment to the PP – Import updates – Moves the Budget to UBCopyright © 2010 Deltek, Inc. 34
  • 35. Rolling Wave Baseline• Reclassification process from temporary holding place back to Cost Class that was created for Rolling Wave• Run Artifact reports from Cobra 5 – Control Account Plans (CAP) – Responsibility Assignment Matrix (RAM) – Pivot reportCopyright © 2010 Deltek, Inc. 35
  • 36. Other Rolling Wave Processes• Program Starts working the Planned detailed Work!• Open discussion on other ways RW is accomplishedCopyright © 2010 Deltek, Inc. 36